Showing 1 - 40 of 71 | Export projects
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

This project targets nutrient reductions within the Mayhew and Big Elk Lake watersheds. The Benton Soil and Water Conservation District will work with farmers in implementing a variety of conservation practices including, but not limited to cropland erosion control projects, riparian pasture management, and nutrient management and feedlot pollution control systems. These strategies were identified through Total Daily Maximum Load Studies.

Benton
Sherburne
Recipient
Elk River Watershed Association
2017 Fiscal Year Funding Amount
$182,500
Fund Source

A completed Total Maximum Daily Load (TMDL) study has identified mid to late summer phosphorus loading as a significant stressor to lakes and streams within the Big Elk Lake watershed. While this comprehensive study serves its role as the unifying document that identifies pollutants and sources, further work is required in order to develop site-specific Best Management Practices, design these practices, and oversee their implementation in order to reach clean water goals.

Benton
Sherburne
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$6,600
Fund Source

The Benton County Water Plan advisory committee has the goal of protecting groundwater resources in Benton County. One of the methods identified is to seal unused wells. In 2013, Benton Soil and Water Conservation District completed an aggressive campaign to identify unused wells. We used several sources to locate potential wells, completed site visits for many wells and collected site information to assisting in prioritizing limited cost share resources.

Benton
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Becker SWCD
2014 Fiscal Year Funding Amount
$40,710
Fund Source

The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.

Becker
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Sherburne SWCD
2016 Fiscal Year Funding Amount
$70,005
Fund Source

The funds requested will provide Big Lake Township with the technical and financial assistance necessary to retrofit up to six locations for stormwater treatment practices within the direct drainage area of Birch Lake, an impaired water body which is very close to meeting state standards. The projects have been identified as high priority in several water quality plans including a TMDL, a subwatershed assessment, the County Water Plan and the Mississippi River (St. Cloud) WRAPS.

Sherburne
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$86,250
Fund Source

The Briggs Lake Chain Association (BLCA) is one of Sherburne County's most proactive lake associations. This sub-grant will provide for approximately 20-30 stormwater reduction best management practices on strategically targeted parcels previously identified as contributing to degraded water quality through Total Maximum Daily Loads, aerial lakeshore analysis and site-reviews conducted by the BLCA.

Sherburne
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2016 Fiscal Year Funding Amount
$200,000
Fund Source

Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.

Scott
Recipient
Minnesota Department of Agriculture
2017 Fiscal Year Funding Amount
$13,578
2016 Fiscal Year Funding Amount
$10,048
2015 Fiscal Year Funding Amount
$7,042
2014 Fiscal Year Funding Amount
$13,000
2013 Fiscal Year Funding Amount
$14,400
2012 Fiscal Year Funding Amount
$31,400
2010 Fiscal Year Funding Amount
$60,000
Fund Source

The Clay County Drainage Site is designed to evaluate the environmental impact of both surface and subsurface drainage from agricultural fields. This site includes six subsurface plots and one surface runoff plot, each approximately 24 acres in size. Monitoring stations are fully automated and each individual plot is monitored separately.The soils and topography across this demonstration site are virtually identical and represent field characteristics common in the most productive agricultural areas of the Red River Valley.

Clay
Recipient
Clearwater River Watershed District
2015 Fiscal Year Funding Amount
$72,000
Fund Source

The goal of this project is to update existing bacteria and Total Suspended Solids (TSS) source inventory through desktop survey and field reconnaissance to identify and prioritize locations to reduce sediment and bacteria loading to the Clearwater River; then, design and implement best management practices (BMPs) at prioritized locations to reduce loading.

Meeker
Stearns
Recipient
Stearns SWCD
2014 Fiscal Year Funding Amount
$196,586
Fund Source

The Q-Lot at St. Cloud State University (SCSU) is an 8 acre (1,000 spaces) gravel and asphalt parking lot. The parking lot's surface is impervious, which means it doesn't allow for rainfall or snow melt to soak into the ground. Instead, the water runs off directly into storm sewers, taking with it sediment, bacteria, automotive fluids and other pollutants which flow straight into the Mississippi River. SCSU staff has frequently witnessed plumes of sediment the color of chocolate milk where the storm sewer discharges into the river.

Stearns
Recipient
Benton SWCD
2015 Fiscal Year Funding Amount
$705,000
Fund Source

This project addresses the northeast St. Cloud drainage basin, the highest priority in the St. Cloud Stormwater Management Plan. St. Cloud has observed and documented ongoing sediment loading to the Mississippi River from the 367 acre watershed. The project is also a companion to the Green Roofs Blue Waters program in which several sediment reduction BMPs are being identified and installed along the Mississippi River.

Benton
Recipient
Wright SWCD
2016 Fiscal Year Funding Amount
$270,000
Fund Source

The Wright Soil and Water Conservation District (Wright SWCD) has partnered with the Crow River Organization of Waters (CROW), the Natural Resources Conservation Service (NRCS) and Wright County Planning and Zoning on this bacterial impairment reduction project to bring feedlot operations into compliance in the targeted North Fork Crow River (NFCR) impaired Unnamed Creek watershed. An analysis of the NFCR TMDL for Bacteria, Nutrients, and Turbidity was done to determine the area to be prioritized for further review of livestock operations in order to reduce the E.

Wright
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Benton Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$75,000
Fund Source

This project will determine the magnitude and sources of pollutants in Little Rock Creek and will estimate the reductions in loadings that are needed in order for the stream reaches to support cold water fish assemblages and attain water quality standards.

Benton
Morrison
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$60,000
Fund Source

The Elk River Watershed Association Joint Powers Board, via the Sherburne Soil and Water Conservation District, will utilize project funds to implement a pasture and manure management program which will provide technical and financial assistance to large animal/hobby farm owners. Staff will work with identified landowners to implement bacteria reduction best practices such as pasture renovation/management, riparian buffer strips, clean water diversions, vegetated buffer strips, and manure management including composting structures.

Sherburne
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
Sherburne SWCD
2015 Fiscal Year Funding Amount
$28,407
Fund Source

Sherburne Soil and Water Conservation District (SWCD) will subcontract with Clearwater River Watershed District (CRWD) to cooperatively coordinate monitoring of three locations within the Mississippi River (St. Cloud) Watershed. A total of four staff (two from each district) will communicate to ensure that the locations are monitored according to the WPLMN Standard Operating Procedures (SOPs) for AIS and non AIS sites

Sherburne
Recipient
Headwaters Science Center
2016 Fiscal Year Funding Amount
$57,028
Fund Source

This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.

Otter Tail
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Benton SWCD
2014 Fiscal Year Funding Amount
$79,400
Fund Source

Little Rock Creek, a cold-water trout stream in central Minnesota, is impaired due to the lack of trout and other cold water fish. The trout are absent because of high water temperatures, low dissolved oxygen and high nitrate levels, stressors caused from a lack of base flow and overuse of groundwater. This project continues a 2011 initiative to assist irrigators in the Little Rock Creek groundwater recharge area with managing the timing and amount of irrigation applied to their crops.

Benton
Morrison
Recipient
Sherburne SWCD
2018 Fiscal Year Funding Amount
$106,800
Fund Source
Sherburne
Recipient
Wilkin SWCD
2018 Fiscal Year Funding Amount
$185,000
Fund Source
Wilkin
Recipient
Benton SWCD
2016 Fiscal Year Funding Amount
$300,000
Fund Source

The Benton SWCD is applying to use Clean Water funds to work with livestock producers in implementing a variety of BMPs including, but not limited to cropland erosion control projects (water and sediment control basins, grade stabilization structures), extending buffers where appropriate to exceed state buffer laws, riparian pasture management and conversion to other uses, nutrient management and feedlot pollution control systems. Our goal is to reduce runoff from these sites and improve water quality within the Mayhew Lake and Big Elk Lake watersheds.

Benton
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

Ensuring natural resource practitioners are applying state-of-the-art approaches is the best way to achieve optimum Best Management Practice (BMP) selection, design, and placement in the landscape, thereby maximizing Clean Water Fund (CWF) benefits. To that end, it is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications.

Scott
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Erosion Control Association
2017 Fiscal Year Funding Amount
$4,405
Fund Source

Minnesota Erosion Control Association (MECA) will offer three one-day training session intended to educate permittees on the requirements of the Municipal Separate Storm Sewer System (MS4) permit. The focus of these workshops will be on conducting inspections and various hot topics.

Blue Earth
Kandiyohi
Wright
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$150,400
Fund Source

This project combines the use of automated soil moisture probes for irrigation scheduling with diverse cover crop planting to reduce or eliminate leaching of nitrogen and other nutrients on cropland with an early season harvested crop in the rotation. The more efficient use of irrigation waters provides a secondary benefit: less withdrawal from the aquifers that provide recharge for the Mt. Simon-Hinckley aquifer.

Sherburne
Recipient
Otter Tail, East SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.

Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$203,000
Fund Source

The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.

Wilkin
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$135,000
Fund Source

This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.

Wilkin
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$16,225
Fund Source

The Otter Tail Water Management District (OTWMD) manages the wastewater for nearly 1,750 private residences near Otter Tail Lake, Deer Lake, and Lake Blanche. There OTWMD is responsible for 101 monitoring wells that were installed in 1984 and 1985 that are no longer being used and need to be properly sealed. The goal of this project is for the East Otter Tail Soil and Water Conservation District (EOTSWCD) to assist the OTWMD in properly sealing 100% of the monitoring wells that are located within the Otter Tail Surficial Aquifer.