Minnesota's Legacy

All Projects

Showing 1 - 40 of 75 | Export projects
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Wilkin SWCD
2014 Fiscal Year Funding Amount
$165,000
Fund Source

The Red River is impaired for sediment. This project will install best management practices to repair severe gullies that are contributing massive sediment loads to the Red River. The City of Moorhead also draws water from the Red River for its drinking water supply downstream. The proposed practices will reduce water treatment costs upon installation. Grant funds will be used to install four grade stabilization structures. These structures will control concentrated runoff and reduce flow velocities.

Wilkin
Recipient
Pennington SWCD
2014 Fiscal Year Funding Amount
$91,300
Fund Source

The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.

Pennington
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$277,500
Fund Source

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.

Red Lake
Recipient
Pomme de Terre River Association JPB
2015 Fiscal Year Funding Amount
$387,146
Fund Source

The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Red Lake
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Red Lake
Recipient
Pomme de Terre River Association JPB
2017 Fiscal Year Funding Amount
$431,587
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Red Lake
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
Morris, City of
2014 Fiscal Year Funding Amount
$500,000
Fund Source
This grant to the City of Morris provides public improvements for the beneficial use of wastewater effluent, where beneficial use is defined as the use of stormwater or wastewater effluent from a publicly owned wastewater treatement plant to replace the use of groundwater.
Stevens
Recipient
Buffalo-Red Rivers Watershed District
2019 Fiscal Year Funding Amount
$38,835
Fund Source

This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Wilkin
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
Chippewa River Watershed Project
2016 Fiscal Year Funding Amount
$100,429
2018 Fiscal Year Funding Amount
$40,197
2019 Fiscal Year Funding Amount
$28,066
Fund Source

The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's Watershed Pollutant Load Monitoring Network (WPLMN) established protocols.

Chippewa
Stevens
Swift
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Pomme de Terre River Association
2013 Fiscal Year Funding Amount
$216,600
Fund Source

This project will allow for outreach programs to engage interested citizens in protecting 200 acres of riparian buffer in the headwaters of the watershed, accounting for 1860 tons of sediment prevented from reaching surface waters each year the practices remain in place. The desired outcome would include 30 or more participants in the program, and to develop a more extensive volunteer base.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pennington SWCD
2017 Fiscal Year Funding Amount
$332,749
Fund Source

Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.

Pennington
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$13,986
Fund Source

This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Ag Resource Strategies, LLC
2010 Fiscal Year Funding Amount
$300,000
Fund Source

LEQA is a Minnesota Department of Agriculture (MDA) program to help livestock producers address, using a non-regulatory approach, the unique water quality issues on their farms. The MDA has contracted with Ag Resource Strategies, LLC, to recruit farmers to enroll in the LEQA program. The company trains technicians to assess different areas of each farms, such as the farmstead, livestock facilities, fields and wooded areas. The technicians then develop an environmental assessment and identify financial assistance for these projects.

Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$89,477
Fund Source

The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Murray
Otter Tail
Pipestone
Pope
Redwood
Renville
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$150,000
Fund Source

This project will update sediment Total Maximum Daily Loads (TMDLs) for 60-64 impaired stream reaches and provide a final TMDL report. The report will address sediment and turbidity impaired streams in the Minnesota River Watershed. TMDLs will describe the impairment in each water body and water quality targets, and will include a discussion of pollutant sources, supporting report components that document assumptions and methodologies, and TMDL equations with completed load allocations, wasteload allocations, and margin of safety for each impairment.

Blue Earth
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Otter Tail, East SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Otter Tail County Community Partners Grant Project will enable community groups to go beyond planning and take action to protect their water resources. This grant program will provide targeted community groups with the means to make positive improvements now and identify high priority projects for future opportunities. Engaging community members in the identification of water protection opportunities with the data in recently completed lake assessment reports will help build connections and foster a stewardship ethic.

Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$471,000
Fund Source

The purpose of this project is to develop a detailed tool that can be used in all watersheds within the Otter Tail and Becker counties to prioritize, target, and measure implementation practices at the field scale. The PTM App will significantly increase the targeting capabilities in Otter Tail and Becker Counties. The Watershed Restoration and Protection Strategy has not been completed for Otter Tail County, yet, and the PTM App will be able to assist targeting and prioritizing when those documents are created.

Becker
Otter Tail
Recipient
Douglas SWCD
2015 Fiscal Year Funding Amount
$74,440
Fund Source

The Douglas County Partners for Clean Water program enables community groups to take action and improve their water resources. Engaging citizens directly in project development and installation efforts provides immediate water quality benefits and cultivates a community of active stewardship.

Douglas