This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.
The goal of this project is to perform water quality monitoring and load calculation duties to accomplish MPCA's Watershed Pollutant Load Monitoring Network monitoring efforts at seven sites for the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton.
The Red River is impaired for sediment. This project will install best management practices to repair severe gullies that are contributing massive sediment loads to the Red River. The City of Moorhead also draws water from the Red River for its drinking water supply downstream. The proposed practices will reduce water treatment costs upon installation. Grant funds will be used to install four grade stabilization structures. These structures will control concentrated runoff and reduce flow velocities.
The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.
The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe
Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.
The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.
Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.
The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.
The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.
Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.
This project will address nutrient impairments of the Sauk River and Sauk River Chain of Lakes (SRCL) by minimizing runoff from 5 high priority feedlots. Specifically, contaminated runoff from 5 feedlots upstream of the SRCL will be eliminated. The sites were prioritized based on the Minnesota Feedlot Annualized Runoff Model index ratings and the location of these feedlots are within a Drinking Water Supply Management Areas.
The Stearns County Soil and Water Conservation District will hire an Accelerated Water Quality Technician to focus on projects in the Middle Sauk area showing the greatest pollution reductions. After identifying and prioritizing targeted sites with the highest pollution potential, the Stearns County SWCD will begin surveys and designs and complete them in a timely fashion while current implementation funds are available. The accelerated survey and design in Stearns County will relieve our natural resources of the current strain put on them by the environment and land use.
The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.
The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.
The Ashley Creek and Adley Creek Inventory Project will involve desk top analysis and a field scale inventory of riparian areas to determine priority areas to install erosion control Best Management Practices and vegetative buffers for nutrient reduction. Assessments will also be made for potential E.coli bacteria sources. Inventory data will be shared with local partners to further develop an implementation plan to address nutrient loading and the listed impairments on each creek.
This grant to the City of Morris provides public improvements for the beneficial use of wastewater effluent, where beneficial use is defined as the use of stormwater or wastewater effluent from a publicly owned wastewater treatement plant to replace the use of groundwater.
Currently, over 235 miles of open ditch are under the jurisdiction of the Brown County Ditch Authority. A majority of Brown County public ditches drain into large, impaired rivers including the Minnesota River (Turbidity), Cottonwood River (Turbidity/Fecal Coliform), Little Cottonwood River (Turbidity/Fecal Coliform) and Watonwan River (Turbidity/Fecal Coliform). Thus far the Brown County Drainage Authority has been inventorying ditches as requested for repair by residents in the ditch system.
This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).
Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.
The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.
The Chain of Lakes Targeted Reduction project will utilize Clean Water Funds to address bank erosion and install vegetated buffers along tributaries to the Eden Valley Chain of Lakes using the SRWD's incentivized Hayed Buffer Program. The Eden Valley Chain of Lakes (Vails Lake, Eden Lake and North Browns Lake) drain into the main segment of the Sauk River Chain of Lakes (SRCL) from the south. Impaired for excessive nutrients, this southern series of lakes is influenced by inflows from private ditches and perennial and intermittent streams.
The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's Watershed Pollutant Load Monitoring Network (WPLMN) established protocols.
Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.
The City of Cold Spring is looking to retrofit 24 acres of existing development within a 138 acre subcatchment of the City to improve the water quality of Cold Spring Creek, a designated trout stream. The large amounts of hard surfaces within the subcatchment area do not allow for rainfall or snow melt to soak into the ground. The stormwater carries with it sediment, bacteria, automotive fluids, and other pollutants. Cold Spring staff has frequently witnessed sediment plumes, the color of chocolate milk, at the storm sewer outfalls.
This project will establish a framework with County, Soil and Water Conservation District and watershed staff that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Cottonwood River and Redwood River watersheds.
The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).
This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.
This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.
This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.
This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).
This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.
This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.
This project will educate the local residents of the importance of groundwater protection and provide financial assistance to those who need to properly abandon their unused well. This project will also support the upgrade of nonconforming sewage treatment systems to reduce nutrient contributions to groundwater and surface water through groundwater permeation.
This project will continue the restoration of Osakis Lake and protect the water quality of the Sauk River by addressing stormwater runoff from urban and rural areas. Activities include assisting eight landowners in designing and funding their shoreland restoration and rain garden projects.
This project will offer incentives to protect 80 acres of land in filter strips and highly erodible lands adjacent to the rivers; construct 9 sediment and water control basins or terraces; replace 35 open tile intakes and advocate wetland restorations and grassland easement programs; organize a Friendship Tour to bring together Minnesota farmers, county commissioners, farm organizations, local, state and federal agency personnel to experience the watershed, farming practices, discuss future project ideas and strengthen relationships; and upgrade 37 subsurface sewage treatment systems by off
This project will allow for outreach programs to engage interested citizens in protecting 200 acres of riparian buffer in the headwaters of the watershed, accounting for 1860 tons of sediment prevented from reaching surface waters each year the practices remain in place. The desired outcome would include 30 or more participants in the program, and to develop a more extensive volunteer base.