Minnesota's Legacy

All Projects

Showing 1 - 8 of 8 | Export projects
Recipient
Isanti SWCD
2018 Fiscal Year Funding Amount
$251,545
Fund Source
Isanti
Recipient
Isanti SWCD
2015 Fiscal Year Funding Amount
$99,736
Fund Source

This project will install nearly 800 linear feet of restored lakeshore with an emphasis on bioengineering techniques, native plants and locating buffers/swales at points of concentrated overland flow into Green Lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 16,697 lbs/yr and phosphorus by 1.3 lbs/yr.

Isanti
Recipient
Isanti SWCD
2016 Fiscal Year Funding Amount
$25,000
Fund Source

This project will install practices to improve water quality in Long Lake, Isanti Co. We will install at least 350 linear feet of restored lakeshore and 3,000 sq ft of native plant stormwater treatment with an emphasis on bioengineering techniques, native plants and locating buffers/swales/rain gardens at points of concentrated overland flow into the lake. By targeting properties that are eroding and/or with concentrated overland flow to the lake we will reduce suspended solids discharge by 6,300 lbs/yr and phosphorus by 0.6 lbs/yr.

Isanti
Recipient
Isanti SWCD
2017 Fiscal Year Funding Amount
$30,405
Fund Source

This project will result in the installation of give water quality practices totaling 350 linear feet of restored lakeshore and 6,000 square feet of native plant stormwater management. By targeting properties that are eroding and/or with concentrated overland flow to the lake, pollutant discharge to the lake will be reduced.

Isanti
Recipient
Greater Blue Earth River Basin Alliance
2017 Fiscal Year Funding Amount
$301,200
Fund Source

The Greater Blue Earth River Basin Alliance (GBERBA) along with Soil and Water Conservation Districts, Counties, landowners, and drainage authorities in the ten member counties will install conservation drainage practices to improve water quality. 103E drainage systems with documented sediment or water quality issues are the focus with the goal of installing 52 practices such as improved side inlets (grade stabilization structures), alternative tile inlets, denitrifying bioreactors, saturated buffers, storage wetlands and others.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
Recipient
Isanti SWCD
2014 Fiscal Year Funding Amount
$120,611
Fund Source

This project is located in an area in the City of Isanti that developed before modern-day stormwater treatment requirements. It will result in the installation of a new stormwater pond in a historic core neighborhood. The urbanized drainage area presently has no other stormwater treatment, except for street sweeping. The new stormwater pond will reduce discharges from a 55 acre site draining to the State Scenic and Recreational Rum River by 12 pounds/yr for phosphorus and approximately 3 tons/yr of sediment.

Isanti
Recipient
Greater Blue Earth River Basin Alliance
2014 Fiscal Year Funding Amount
$378,673
Fund Source
Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
Recipient
Greater Blue Earth River Basin Alliance
2016 Fiscal Year Funding Amount
$212,000
Fund Source

To be able to manage resources in the Blue Earth and Le Sueur Watersheds into the future and have a positive effect on water quality, resource managers need high quality accurate data to support decision making of best management practice (BMP) implementation. Digital elevation data is a valuable resource for modeling water flow, however in its current state it cannot represent water conveyance through features such as roadways. These flow barriers limit the accurate use of data for recently developed targeting tools identifying BMP suitability and effectiveness down to the field scale.

Blue Earth
Faribault
Freeborn
Jackson
Martin
Steele
Waseca