Minnesota's Legacy

All Projects

Showing 1 - 20 of 20 | Export projects
Recipient
Dakota SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

This project will use the Dakota County Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, biofiltration, bioswales, shoreline stabilizations, and other best management practices (BMPs). Project proposals will be solicited from faith based organizations, homeowner associations, school organizations, lake associations, and others that own or manage large areas of land.

Dakota
Recipient
Pomme de Terre River Association JPB
2015 Fiscal Year Funding Amount
$387,146
Fund Source

The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$125,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrological Simulation Program FORTRAN (HSPF) model for Minnesota portions of the Des Moines River watershed.

Cottonwood
Jackson
Lyon
Martin
Murray
Nobles
Pipestone
Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$48,000
Fund Source

The downtown Chanhassen stormwater best management practice (BMP) retrofit assessment project will reduce watershed phosphorus loads to Rice Marsh Lake and improve the water quality in downstream Lake Riley, impaired for excess nutrients. This project will identify innovative BMP retrofit opportunities that target soluble phosphorus and promote infiltration and groundwater recharge within this highly-developed area. The downtown Chanhassen BMP retrofit assessment project will be performed in partnership with the City of Chanhassen.

Carver
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Lac qui Parle-Yellow Bank Watershed District
2015 Fiscal Year Funding Amount
$12,160
Fund Source
Establish a framework with local partners that will outline their involvement throught the development of the Lac qui Parle Watershed WRAP
Lac qui Parle
Lincoln
Yellow Medicine
Recipient
Lac qui Parle County Envrionmental Office
2015 Fiscal Year Funding Amount
$101,916
Fund Source

Lac qui Parle-Yellow Bank Watershed District will collect water chemistry samples from the three lakes and twenty-nine stream sites in the Lac qui Parle and Minnesota Headwaters watersheds following the MPCA’s Intensive Watershed Monitoring (IWM) plan for lakes and streams. Eleven samples will be collected at each lake from May through September during 2015 and 2016. Eleven samples will be collected at each of the twenty-nine stream sites in 2015. In addition, sixteen samples at each stream site will be collected in 2015 and 2016 following the E.

Big Stone
Lac qui Parle
Swift
Yellow Medicine
Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$233,400
Fund Source

This is a joint grant application from the Riley-Purgatory-Bluff Creek Watershed District (RPBCWD) and the City of Chanhassen. In 2010, the Minnesota Pollution Control Agency listed Lake Susan as a shallow lake impaired for excess nutrients. A 2013 report recommended a project located at the park pond immediately northwest of Lake Susan as the most cost-effective watershed implementation project. The project calls for an outlet control structure at a higher elevation that will provide increased dead pool storage and the installation of a Minnesota Filter to treat dissolved phosphorus.

Carver
Recipient
Scott SWCD
2015 Fiscal Year Funding Amount
$125,000
Fund Source

This project builds on the momentum of previous Clean Water Fund grants in making significant and quantifiable sediment, nutrient and runoff volume reductions to address the turbidity, dissolved oxygen and other impairments of the Lower Minnesota River (LMR). These water quality improvements will be achieved by constructing on-the-ground conservation best management practices (BMPs) in the targeted watersheds -including specifically Sand and Roberts Creek - and near channel sources.

Scott
Recipient
McLeod County
2015 Fiscal Year Funding Amount
$34,200
Fund Source

McLeod County will create an inspection database for 103E ditches under their drainage authority. The County will acquire a database software solution to conduct field inspections and to track ditch maintenance projects. This software will be used to facilitate statutory compliance including developing a process for completing the annual inspection and reporting requirements. The project will lead to improving the County's data management capabilities and better identification of drainage system needs that could lead to helping improve water courses that are impaired for turbidity.

McLeod
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Douglas SWCD
2015 Fiscal Year Funding Amount
$74,440
Fund Source

The Douglas County Partners for Clean Water program enables community groups to take action and improve their water resources. Engaging citizens directly in project development and installation efforts provides immediate water quality benefits and cultivates a community of active stewardship.

Douglas
Recipient
Scott SWCD
2015 Fiscal Year Funding Amount
$136,130
Fund Source

This project is a cooperative initiative between the Prior Lake Spring Lake Watershed District, the City of Prior Lake, and the Scott Soil and Water Conservation District to implement on-the-ground Best Management Practices (BMPs) that will protect and improve water quality in Spring, Upper Prior and Lower Prior Lakes, water resources of local, regional, and state significance. Spring and Upper Prior Lakes are both impaired and have a completed Total Maximum Daily Load and Implementation Plan.

Scott
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
St. Paul, City of
2015 Fiscal Year Funding Amount
$695,000
Fund Source

At almost 4,000 acres, Trout Brook is the largest subwatershed in the Capitol Region Watershed District and the City of Saint Paul. The restored stream is part of the 42 acre Trout Brook Nature Sanctuary project, whose goal is to return the area back to some resemblance of its pre-industrialized valley of stream floodplain and wetlands. Monitoring results within the corridor show that phosphorus, sediments, bacteria, lead and copper are the pollutants of most concern.

Ramsey
Recipient
Heron Lake Watershed District
2015 Fiscal Year Funding Amount
$175,000
Fund Source

This monitoring work expands on previously established routine water quality and flow sampling to include extensive fish and aquatic invertebrate surveys. Subsequent steps include assessment of the monitoring data to determine impairments, identification of stressors that are causing impairments, development of Total Maximum Daily Load (TMDL) studies using identification of pollutant sources using computer modeling and other techniques, civic engagement, and public education as approaches in progress towards water quality goals.

Cottonwood
Jackson
Lyon
Martin
Murray
Nobles
Pipestone
Recipient
Heron Lake Watershed District
2015 Fiscal Year Funding Amount
$21,955
Fund Source

Locating the sources of sediment, phosphorus, and bacteria is integral to reducing the effect they have on a water body. The completion of the West Fork Des Moines River (WFDMR) Targeting and Prioritizing Endeavor will result in a set of data that is the most cost-effective for the implementation of Best Management Practices (BMPs) for all identified priority resources. The results will be expressed as the maximum reduction of a water quality contaminant (e.g. sediment, phosphorus, bacteria) at a priority resource (e.g. an impaired stream) for a given level of investment.

Cottonwood
Jackson
Lyon
Martin
Murray
Nobles
Pipestone