Minnesota's Legacy

All Projects

Showing 1 - 40 of 49 | Export projects
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Wadena Soil and Water Conservation District, Darren Newville, District Manager, darren.newville@mn.nacdnet.net (218) 631-3195 ext. 3
2017 Fiscal Year Funding Amount
$14,338
2016 Fiscal Year Funding Amount
$14,337
2015 Fiscal Year Funding Amount
$11,500
2014 Fiscal Year Funding Amount
$11,500
2013 Fiscal Year Funding Amount
$76,724
2012 Fiscal Year Funding Amount
$33,852
2011 Fiscal Year Funding Amount
$114,991
Fund Source

The Minnesota Department of Agriculture has signed a Joint Powers Agreement with Wadena County Soil and Water Conservation District (SWCD).

Becker
Benton
Cass
Crow Wing
Douglas
Hubbard
Kandiyohi
Morrison
Otter Tail
Pope
Sherburne
Stearns
Todd
Wadena
Recipient
Chippewa River Watershed
2019 Fiscal Year Funding Amount
$31,912
Fund Source

The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (MPCA, CRWP and local partners).  The Minnesota Pollution Control Agency (MPCA) and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners (local partners) want to engage in for the second round of the WRAPS process.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stevens
Swift
Recipient
Chippewa River Watershed
2019 Fiscal Year Funding Amount
$63,824
Fund Source

The purpose of this project is to create a shared plan for the Watershed Restoration and Protection Strategy (WRAPS) process with roles, responsibilities, commitments and deliverables clearly understood by all (Minnesota Pollution Control Agency (MPCA), Chippewa River Watershed, and local partners). The MPCA and the Chippewa River Watershed Project (CRWP) will be working together to ascertain the level of involvement that local units of government and other partners want to engage in for the second round of the WRAPS process.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stevens
Swift
Recipient
Chippewa County
2011 Fiscal Year Funding Amount
$286,113
Fund Source

This project will complete a comprehensive and sustainable Major Watershed Restoration and Protection Strategies report for the Chippewa River, its tributary streams, and the many lakes in the Chippewa River watershed that is understandable and adoptable by local units of government and residents.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Chippewa River Watershed Project
2015 Fiscal Year Funding Amount
$296,965
Fund Source

The goal of the Chippewa River Watershed Protection project is to protect unimpaired areas of the watershed. This will be accomplished through education and outreach with landowners and through implementation of best management practices.

Chippewa
Douglas
Grant
Kandiyohi
Pope
Stevens
Swift
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Beltrami
Clearwater
Mahnomen
Pennington
Polk
Red Lake
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Tetra Tech, Inc.
2012 Fiscal Year Funding Amount
$4,999
Fund Source

This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$1,879
Fund Source

This project will support the completion of a final draft Total Maximum Daily Load (TMDL) document for the Osakis, Smith and Faille Lakes TMDL and the submittal to EPA for final approval.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$178,832
2013 Fiscal Year Funding Amount
$224,560
Fund Source

The goal of this project is the implementation of a watershed-based total maximum daily load (TMDL) and watershed assessment project.

Beltrami
Marshall
Pennington
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Red Lake Watershed District
2013 Fiscal Year Funding Amount
$123,400
Fund Source

This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.

Marshall
Pennington
Polk
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Renville
Rice
Scott
Sibley
Steele
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
University of Minnesota-Extension
2019 Fiscal Year Funding Amount
$110,000
2018 Fiscal Year Funding Amount
$110,000
2017 Fiscal Year Funding Amount
$110,000
2016 Fiscal Year Funding Amount
$110,000
2015 Fiscal Year Funding Amount
$110,000
2014 Fiscal Year Funding Amount
$110,000
Fund Source

Funding supports an Irrigation Specialist to develop guidance and provide education on irrigation and nitrogen best management practices (BMPs). In this position, Dr. Vasu Sharma provides direct support to irrigators on issues of irrigation scheduling and soil water monitoring. She is collaborating on the development of new irrigation scheduling tools that help irrigators manage water and nitrogen resources more precisely. These tools help reduce nitrogen leaching losses in irrigated cropping systems.

Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Crow Wing
Dakota
Douglas
Goodhue
Grant
Hubbard
Isanti
Kandiyohi
Kittson
Lac qui Parle
Lincoln
Marshall
Meeker
Morrison
Mower
Norman
Otter Tail
Pipestone
Polk
Pope
Red Lake
Renville
Rice
Sherburne
Stearns
Stevens
Swift
Todd
Wabasha
Wadena
Washington
Watonwan
Wright
Recipient
Sauk River Watershed District
2012 Fiscal Year Funding Amount
$65,000
Fund Source

This Sauk River Watershed District project will conduct the Whitney Park river clean-up, adopt a river program and other community events as part of their healthy living programs; will collaborate with the city of St. Cloud to install a rain garden demonstration site at Whitney Park; use local radio and public television stations to promote the District’s “neighborhood rain garden initiative” and other incentive programs.

Todd
Stearns
Pope
Morrison
Meeker
Douglas
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$68,033
Fund Source

This project addresses five reaches of the Minnesota River that have aquatic recreation impairments as identified by high concentrations of E. coli. The project will describe the water quality impairments, complete pollutant source assessments, establish loading capacities and allocations for the impairments, and develop implementation strategies.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Pope
Redwood
Renville
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Wenck Associates, Inc.
2013 Fiscal Year Funding Amount
$4,826
Fund Source

This project will support the review of all public comments submitted for the North Fork Crow River TMDL and make appropriate edits and changes to the draft TMDL based on MPCA guidance.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
Wenck Associates, Inc.
2014 Fiscal Year Funding Amount
$1,524
Fund Source
The goal of this project is to add dual endpoints to the turbidity section of the North Fork Crow TMDL so that it addresses the proposed TSS standards.
Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Renville
Stearns
Wright
Recipient
Middle Fork Crow River Watershed Dist
2017 Fiscal Year Funding Amount
$50,000
Fund Source

This contract will be to initiate the second cycle of the North Fork Crow River Watershed Restoration and Protection Strategies (WRAPS) development. The project will provide needed information and analysis to make sure that implementation strategies are well thought out and targeted. The result will be a framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.

Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
Northwest Regional Library
2011 Fiscal Year Funding Amount
$174,499
2010 Fiscal Year Funding Amount
$183,529

Minnesota’s Legacy Amendment raises revenue for Clean Water, Outdoor Heritage, Parks and Trails, and Arts and Cultural Heritage. Libraries are beneficiaries of a portion of the Arts and Cultural Heritage Funding.

Kittson
Marshall
Pennington
Red Lake
Roseau
Recipient
Pioneer Sarah Creek Watershed District
2013 Fiscal Year Funding Amount
$103,415
Fund Source

This project will complete a Watershed Restoration and Protection (WRAP) Plan that includes a set of pollutant reduction and watershed management strategies to achieve water quality standards for the listed pollutants, and that are understood and adoptable by local units of government and other stakeholders. This project will also provide an important water quality framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the watershed.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Wright
Recipient
Emmons & Olivier Resources, Inc.
2013 Fiscal Year Funding Amount
$2,034
Fund Source

The goal of this project is to respond to public comments on the Pope County Eight Lakes TMDL and make appropriate changes where necessary.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Emmons and Olivier Resources, Inc. (EOR)
2011 Fiscal Year Funding Amount
$25,443
Fund Source

This project will develop feasibility analysis, a drawdown plan for Malmedal Lake and an analysis of available options for fish barriers in the watersheds of Malmedal Lake and Strandness Lake.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin