Minnesota's Legacy

All Projects

Showing 1 - 40 of 75 | Export projects
Recipient
Pennington SWCD
2014 Fiscal Year Funding Amount
$91,300
Fund Source

The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.

Pennington
Recipient
Pomme de Terre River Association JPB
2015 Fiscal Year Funding Amount
$387,146
Fund Source

The Pomme de Terre River Association has targeted and identified specific areas and activities required for marked water quality improvement. This project will implement of 16 Water and Sediment Control Basins (WASCOBs), 28 Rain Gardens, 2 Shoreline/ Stream bank stabilization, 10 Waste Pit Closures, 1 Terrace Project, and the enrollment of 1900 acres into conservation practices. These practices in total will directly result in site-specific and watershed-dependent reductions of 17,801 tons of sediment and 17,784 pounds of phosphorous from entering surface waters yearly in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in in the 67 counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Pomme de Terre River Association JPB
2017 Fiscal Year Funding Amount
$431,587
Fund Source

The goal of the Pomme de Terre River Association (JPB) is to improve the local water resources within the watershed through targeted voluntary efforts and the building of strong relationships with local landowners, producers, and citizens. The Pomme de Terre River is currently not meeting state water quality for sediment. The purpose of this project is to strategically work towards a 53% sediment reduction goal at the mouth of the Pomme de Terre River based on a Watershed Restoration and Protection Strategy document.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
University of Minnesota
2016 Fiscal Year Funding Amount
$500,000
Fund Source

These funds are being used to systematically collect data and produce statistically valid estimates of the rate of soil erosion and tracking the adoption of high residue cropping systems in counties with greater than 30% land in agricultural row crop production. Designed to establish a long term program in Minnesota to collect data and produce county, watershed, and state wide estimates of soil erosion caused by water and wind along with tracking adoption of conservation measures to address erosion.

Becker
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Chisago
Clay
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Isanti
Jackson
Kandiyohi
Kittson
Lac qui Parle
Le Sueur
Lincoln
Lyon
Mahnomen
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Rock SWCD
2015 Fiscal Year Funding Amount
$68,500
Fund Source

The Rock County Soil and Water Conservation District/Land Management will build upon terrain analysis products developed by a Rock River Watershed 2013 BWSR grant and extend the data products to include additional water quality, Best Management Practices (BMP) suitability, BMP effectiveness, and BMP value datasets. This project will also extend this analysis to the remainder of Rock County, specifically Mud Creek, Beaver Creek and Split Rock Creek which are all listed for turbidity impairments.

Rock
Recipient
Anoka Conservation District
2010 Fiscal Year Funding Amount
$400,000
Fund Source

A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Anoka Conservation District
2011 Fiscal Year Funding Amount
$600,000
Fund Source

A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Carver County
2014 Fiscal Year Funding Amount
$40,000
Fund Source

Recent efforts by Carver County Water Management Organization Staff have centered on removing point sources of bacteria in both Bevens and Carver Creeks. These efforts have shown improvement in water quality; however the creeks are still above the state standard for E. coli. Early results from field surveys have pinpointed areas where livestock have uncontrolled access to streams. Five sites over a twenty mile stretch of Bevens Creek have shown evidence of livestock access to streams and associated damage to streambanks.

Carver
Recipient
City of Chaska
2013 Fiscal Year Funding Amount
$49,098
Fund Source

The Birdie Lane East Ravine Improvement project consists of eliminating ravine erosion and treatment of an 8.24-acre watershed to reduce total phosphorus reaching Lake Hazeltine by 98 pounds per year. The eroding ravine will be replaced with a linear treatment feature to provide treatment of a watershed that has land uses that include roads, single-family residential, and a golf course. The project will involve development of a cascade, pool, and riffle channel system.

Carver
Recipient
Lower Minnesota River Watershed District
2013 Fiscal Year Funding Amount
$220,800
Fund Source

Seminary Fen, a 600-acre complex in Carver County, supports one of only 500 calcareous fens in the world and is one of the highest quality calcareous fens in southern Minnesota. The Fen feeds Assumption Creek; one of the metro area's last known trout streams that supports naturally reproducing native brook trout. Assumption Creek then discharges to the nearby Minnesota River. The Fen's unique hydrology, soils, plants, and habitats are highly sensitive to water quality and sedimentation stress.

Carver
Dakota
Hennepin
Scott
Recipient
Riley-Purgatory-Bluff Creek WD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

In 2002 and 2004, the Minnesota Pollution Control Agency listed Bluff Creek for turbidity and biological integrity. A Total Maximum Daily Load report and implementation plan were finalized and approved in 2013. This project was identified as a high priority site for culvert restoration and bank repairs.

Carver
Recipient
Carver County
2014 Fiscal Year Funding Amount
$200,000
Fund Source

The Burandt Lake Stormwater Reuse System (BLSRS) project will install a water reuse system to capture untreated storm water and reduce pollutants entering Burandt Lake. This collaborative project with Carver County, Carver County Soil and Water Conservation District (SWCD), City of Waconia and Independent School District 110 will retain and reuse an estimated 48% of the annual storm water runoff (1.25 million gallons) currently generated from eight acres of adjacent residential neighborhoods.

Carver
Recipient
Multiple Local Government Units
2013 Fiscal Year Funding Amount
$1,631,794
Fund Source

Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 12 local governments with funds.

Chisago
Lac qui Parle
Lake of the Woods
McLeod
Mille Lacs
Pennington
Pope
St. Louis
Stearns
Todd
Washington
Winona
Recipient
Multiple Local Government Units
2012 Fiscal Year Funding Amount
$1,500,000
Fund Source

Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.

Big Stone
Cass
Dodge
Douglas
Lincoln
Marshall
McLeod
Mille Lacs
Pennington
Pipestone
Rock
St. Louis
Stearns
Recipient
Carver County
2014 Fiscal Year Funding Amount
$150,000
Fund Source

This project will increase the ability of the Carver County Water Management Organization (CCWMO) to approach local community partners and fund projects that treat stormwater runoff at the source instead of treating stormwater downstream at a regional pond or through other large scale best management practices (BMPs).

Carver
Recipient
Carver County
2017 Fiscal Year Funding Amount
$10,000
Fund Source

The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.

Carver
Recipient
Carver County Watershed Management Organization
2011 Fiscal Year Funding Amount
$174,732
Fund Source

Carver County has completed a Fecal Coliform Total Maximum Daily Load(TMDL) and Implementation Plan (IP).

Carver
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
Carver SWCD
2017 Fiscal Year Funding Amount
$120,935
Fund Source

The purpose of this project is to install prioritized and targeted best management practices on the Carver County Ditch #6 drainage system that drains directly into Bevens Creek. Bevens Creek does not meet state water quality standards for sediment. The goal of the project is to install 6 grade stabilization structures, 5 grassed waterways, and 2 water and sediment control basins that have been identified through GIS LIDAR applications and field verified along with landowner support.

Carver
Recipient
Carver County WMO
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Carver County has identified water quality improvement of Carver, Bevens and Silver Creek as a water management priority. This project will identify storage or wetland restoration sites that are highly effective at reducing pollutant loading to downstream impaired waters using high-resolution Light Detection and Ranging (LiDAR) data and Geographic Information System (GIS) processes. The watershed landscape has been highly modified for agricultural production land development; less than 50 percent of pre-settlement wetland acres remain in Carver County.

Carver
Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$48,000
Fund Source

The downtown Chanhassen stormwater best management practice (BMP) retrofit assessment project will reduce watershed phosphorus loads to Rice Marsh Lake and improve the water quality in downstream Lake Riley, impaired for excess nutrients. This project will identify innovative BMP retrofit opportunities that target soluble phosphorus and promote infiltration and groundwater recharge within this highly-developed area. The downtown Chanhassen BMP retrofit assessment project will be performed in partnership with the City of Chanhassen.

Carver
Recipient
Pennington SWCD
2017 Fiscal Year Funding Amount
$332,749
Fund Source

Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.

Pennington
Recipient
Pennington SWCD
2010 Fiscal Year Funding Amount
$77,600
Fund Source

The Thief River is impaired due to low Dissolved Oxygen and high Turbidity levels resulting from high sediment load. These impairments affect the drinking water supply of Thief River Falls in addition to fish spawning habitat and recreation. The Erosion, Sedimentation and Sediment Yield Report completed in 1996 found that 63% of the sediment originates from the streambank of the Thief River. The Pennington Soil and Water Conservation District is therefore targeting the major sediment sources along the river.

Pennington
Recipient
Multiple Local Government Units
2010 Fiscal Year Funding Amount
$1,234,350
Fund Source

Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.

Aitkin
Benton
Dodge
Douglas
Fillmore
Goodhue
Morrison
Renville
Stearns
Waseca
Washington
Winona
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$187,974
Fund Source

The Thief River is the source of drinking water for the City of Thief River Falls. The river's other designated uses also include recreation and aquatic life. Water quality monitoring conducted by local agencies discovered that the Thief River is not meeting state water quality standards for both turbidity (muddiness) and dissolved oxygen. Each year, approximately 12,376 tons of sediment is deposited into the Thief River Falls reservoir by the Thief River. That is the equivalent of over 1,200 dump trucks full of dirt.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$662,000
Fund Source

In the early 1900s, a joint State and County drainage project constructed a 1 mile outlet channel to Grand Marais Creek to provide a shorter outlet to the Red River and effectively abandoned the lower 6 miles of the natural channel. In recent times, the ditch has eroded from its original shape to a channel of steep gradients and unstable banks. This has resulted in head cutting of the channel and nearly continuous channel erosion and bank sloughing with the effect of depositing up to an estimated annual average of 700 tons of sediment into the Red River.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Pennington SWCD
2011 Fiscal Year Funding Amount
$34,375
Fund Source

The Halvorson Streambank Stabilization site is located three miles north of the City of Thief River Falls on the Thief River. The Thief River is impaired for low dissolved oxygen and turbidity. A TMDL study began in 2010. These impairments affect fish spawning habitat, recreation and the drinking water supply of Thief River Falls. Studies show that 63% of the sediment in the Thief River is coming from the banks of the river itself. Stabilizing this bank will reduce the turbidity and low dissolved oxygen impairments.

Pennington
Recipient
Otter Tail, East SWCD
2017 Fiscal Year Funding Amount
$58,000
Fund Source

The purpose of this project is to identify effective irrigation and nutrient management best management practices and technologies and the barriers that prevent irrigators, producers, and other agricultural partners from adopting them in Otter Tail County. The primary goal is to reduce nitrate in areas where groundwater is susceptible to contamination as mapped by The Minnesota Department of Health by identifying effective BMPs and addressing the barriers to their adoption.

Becker
Douglas
Otter Tail
Todd
Wadena
Recipient
Pennington SWCD
2011 Fiscal Year Funding Amount
$93,844
Fund Source

The 14,080 acre watershed of JD#30 and JD#18 drains into the Thief River four miles upstream of Thief River Falls. The City of Thief River Falls draws their drinking water from the reservoir the Thief River supplies. This reservoir is filling with sediment faster than anticipated. It was first estimated that the reservoir would require dredging every 50 years. The last dredging was needed in only 35 years at a price tag of $1.1 million. Treatment of the water for drinking is a major expense to the City.

Pennington
Recipient
Riley-Purgatory-Bluff Creek WD
2019 Fiscal Year Funding Amount
$55,000
Fund Source

The Riley-Purgatory-Bluff-Creek Watershed District and the City of Eden Prairie are working together to implement projects to remove Lake Riley and Rice Marsh Lake from the impaired waters list. One key emerging issue is to evaluate potential internal phosphorous loading within stormwater ponds in the lakes? subwatersheds. This project will also use updated pond data from the city?s intensive pond inspection program to identify other phosphorus reduction opportunities. The proposed assessment will quantify formerly undocumented P loading to Rice Marsh Lake and Lake Riley.

Carver
Hennepin
Recipient
Douglas SWCD
2014 Fiscal Year Funding Amount
$36,000
Fund Source

As lake-focused development continues these high quality waters will see increasing amounts of land use change. The State Demographer projects that the targeted lake catchments will see population increases of 25-62% within 20 years. Isolating these contributing areas permits the Lake Protection Analysis project to perform multiple GIS analyses to accurately inform water quality discussions. The final framework will allow local water managers to prioritize across their water bodies, target activities to specific subsheds, and develop measurable goals.

Crow Wing
Douglas
Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$233,400
Fund Source

This is a joint grant application from the Riley-Purgatory-Bluff Creek Watershed District (RPBCWD) and the City of Chanhassen. In 2010, the Minnesota Pollution Control Agency listed Lake Susan as a shallow lake impaired for excess nutrients. A 2013 report recommended a project located at the park pond immediately northwest of Lake Susan as the most cost-effective watershed implementation project. The project calls for an outlet control structure at a higher elevation that will provide increased dead pool storage and the installation of a Minnesota Filter to treat dissolved phosphorus.

Carver
Recipient
Douglas SWCD
2017 Fiscal Year Funding Amount
$227,430
Fund Source

The Lake Ida and Ditch 23 Wetland Feasibility Project will investigate and review the phosphorus loading of Lake Ida and design a project to protect Lake Ida water quality. Lake Ida is a 'high quality, unimpaired lake at the highest risk of becoming impaired' according to MPCA's Lakes of Phosphorus Sensitivity Significance. With the County Ditch 23 inlet identified as a priority area to reduce phosphorous, a professional engineering firm will explore the best solution to reduce phosphorus.

Douglas
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2019 Fiscal Year Funding Amount
$200,000
Fund Source

It is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications. The Metro Conservation District?s (MCD) Sub-Watershed Analysis (SWA) program provides these capacity-building services and unites efforts across 11 SWCDs. MCD proposes to analyze an additional 15 subwatersheds. The analyses will identify the location and estimated cost/benefit relationship for BMPs, evolve with new technology, and share discoveries metro-wide.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metro Conservation Districts
2012 Fiscal Year Funding Amount
$216,181
Fund Source

Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Douglas Soil and Water
2013 Fiscal Year Funding Amount
$54,735
Fund Source

The Partners for Clean Water program will enable community groups to take action to improve their water resources. Engaging citizens directly in project development and installation efforts provides immediate water quality benefits and develops a community of active stewardship. Installation of projects previously developed by Douglas County community groups will shift the currently dormant water quality protection efforts.

Douglas
Recipient
Douglas SWCD
2015 Fiscal Year Funding Amount
$74,440
Fund Source

The Douglas County Partners for Clean Water program enables community groups to take action and improve their water resources. Engaging citizens directly in project development and installation efforts provides immediate water quality benefits and cultivates a community of active stewardship.

Douglas