Minnesota's Legacy

All Projects

Showing 1 - 40 of 42 | Export projects
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. This work will include completion of the model including final calibration and validation.

Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$49,491
Fund Source

This is the second phase of building the Hydrologic Simulation Program FORTRAN (HSPF) model for the Buffalo River watershed. The project will result in a completed model including necessary calibration and validation phases.

Becker
Clay
Otter Tail
Wilkin
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$70,921
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Buffalo River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Wilkin
Otter Tail
Clay
Becker
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$249,968
Fund Source

The Buffalo River Watershed Pilot Project is one of two pilots in Minnesota designed to develop a watershed approach for managing Minnesota’s surface waters. The goal of this project is to develop a plan that will guide surface water quality management throughout the watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Tetra Tech, Inc.
2012 Fiscal Year Funding Amount
$4,999
Fund Source

This project will develop and execute three point source related scenarios for the Chippewa River watershed using an existing HSPF watershed model. This project will also support the review of the HSPF Modeling Guidance Document.

Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
2014 Fiscal Year Funding Amount
$1,808,000
Fund Source

Minnesota’s use of groundwater has increased over the last two decades. An increasing reliance on groundwater may not be a sustainable path for continued economic growth and development. The DNR is establishing three pilot groundwater management areas (GWMA) to help improve groundwater appropriation decisions and help groundwater users better understand and plan for future groundwater needs associated with economic development.

Clearwater
Douglas
Meeker
Swift
Wadena
Anoka
Becker
Hubbard
Pope
Ramsey
Stearns
Washington
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$96,618
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of three major watersheds: the Crow River/North Fork Crow River, the South Fork Crow River, and the Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$94,984
Fund Source
The goal of this project is to construct, calibrate, and validate a watershed model using HSPF. RESPEC will produce a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.
Jackson
Lincoln
Murray
Nobles
Pipestone
Rock
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$149,677
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process for the following three watersheds: North Fork Crow River, South Fork Crow River, and Sauk River.

Carver
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Morrison
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$128,887
Fund Source
The goal of this project is to extend the existing HSPF models through 2012 in the Chippewa Watershed (07020005) and Hawk-Yellow Medicine Watershed (07020004) to incorporate recent monitoring data to support current MPCA business needs and sediment source investigations.
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Renville
Rice
Scott
Sibley
Steele
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Houston Engineering
2015 Fiscal Year Funding Amount
$156,937
Fund Source

The goal of this project is to construct, calibrate, and validate two (2) watershed models using Hydrologic Simulation Program FORTRAN (HSPF).

Becker
Clay
Mahnomen
Norman
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$155,000
Fund Source

The goal of this project is to continue and finalize Hydrological Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process for the Minnesota River–Headwaters and Lac qui Parle watersheds that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) reports.

Big Stone
Chippewa
Lac qui Parle
Lincoln
Stevens
Swift
Traverse
Yellow Medicine
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$99,998
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models simulate sediment erosion and transport, however these models periodically need to be adjusted to be consistent with the most recent sources of information regarding sediment distribution and loading rates. The goal of this project is to refine the sediment source partitioning and simulation in the Minnesota River basin using all relevant available sources of information.

Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The Minnesota River Basin Hydrological Simulation Program FORTRAN (HSPF) models, which simulate flow and pollutant transport, need to be refined to be consistent with the most recent external sources of land use, hydrologic response, and surface flow attributions. The primary goal of this work is to refine the hydrologic calibration in the Minnesota River basin.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$173,118
Fund Source

The goal of this project is to establish load reduction requirements for impaired waters and to develop restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.

Big Stone
Chippewa
Lac qui Parle
Lincoln
Stevens
Traverse
Yellow Medicine
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$89,477
Fund Source

The goal of this project is to extend existing Hydrologic Simulation Program FORTRAN (HSPF) models through 2017 for the following major watersheds: Redwood, Cottonwood, Watonwan, Blue Earth, Le Sueur, Pomme de Terre, Minnesota River-Headwaters, and Lac Qui Parle watersheds.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Freeborn
Grant
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Murray
Otter Tail
Pipestone
Pope
Redwood
Renville
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$109,928
Fund Source

The goal of this project is to refine the nutrient and algae simulation in the Minnesota River basin using all relevant available sources of information. The outcome of this work order is a revised Hydrological Simulation Program – FORTRAN (HSPF) watershed model application for the Minnesota River basin that correctly represents nutrient sources and algae.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Otter Tail
Pipestone
Pope
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$80,000
Fund Source

The goal of this project is to construct, calibrate, and validate a Hydrologic Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail watershed. The contractor will produce a HSPF watershed model application(s) that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs). The contractor will clearly demonstrate that this model generates predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
United States Geological Survey (USGS)
2015 Fiscal Year Funding Amount
$18,375
Fund Source

The study will assess existing phosphorus data records and create a model to explain phosphorus loading into the Red River of the North. Studies have found that the majority of nutrient loading in the stream located in agricultural areas occurs with sediment loading since nutrients are typically bound to sediment particles.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$19,996
Fund Source

The goal of this project is to extend through 2016, calibrate, and validate the existing watershed model using Hydrological Simulation Program FORTRAN (HSPF) for the Pomme de Terre River Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) studies.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Beltrami
Clearwater
Itasca
Koochiching
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$68,505
Fund Source

This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.

Aitkin
Becker
Benton
Carlton
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Itasca
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Otter Tail
Pope
Sherburne
St. Louis
Stearns
Todd
Wadena
Wright
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$71,525
Fund Source

This project will extend, calibrate, and validate watershed models using the Hydrological Simulation Program - FORTRAN (HSPF) watershed model for the Mississippi Headwaters, Leech Lake, Pine, and South Fork Crow Watersheds.

Aitkin
Becker
Beltrami
Carver
Cass
Clearwater
Crow Wing
Hennepin
Hubbard
Itasca
Kandiyohi
McLeod
Meeker
Renville
Sibley
Wright