Minnesota's Legacy

All Projects

Showing 1 - 40 of 54 | Export projects
Recipient
Zumbro Watershed Partnership Inc.
2013 Fiscal Year Funding Amount
$81,122
Fund Source

The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Kittson
Marshall
Pennington
Polk
Roseau
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$33,414
Fund Source

This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Zumbro Watershed Partnership, Inc.
2012 Fiscal Year Funding Amount
$81,750
2011 Fiscal Year Funding Amount
$58,218
Fund Source

This project will complete an implementation plan, as required by the Minnesota Pollution Control Agency, for the Zumbro River turbidity TMDL project. It will also revise the Zumbro River Watershed Management Plan (completed 2007) to ensure it continues to reflect local needs, incorporates new information, and develops more effective linkages with related local, state and federal government programs.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Red Lake Watershed District
2011 Fiscal Year Funding Amount
$178,832
2013 Fiscal Year Funding Amount
$224,560
Fund Source

The goal of this project is the implementation of a watershed-based total maximum daily load (TMDL) and watershed assessment project.

Beltrami
Marshall
Pennington
Recipient
Center for Energy and Environment
2010 Fiscal Year Funding Amount
$2,000,000

Increasing energy conservation and efficiency in residences can play a significant role in Minnesota's goals for energy savings and carbon emissions reductions. The Center for Energy and Environment (CEE), a Minneapolis-based nonprofit organization, is using this appropriation to develop and implement innovative residential energy efficiency programs. Programs will be demonstrated in eight cities: Apple Valley, Austin, Duluth, Minneapolis, Owatonna, Park Rapids, Rochester, and St. Paul.

Dakota
Hennepin
Mower
Olmsted
Ramsey
Steele
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
Children's Museum of Southern Minnesota
2013 Fiscal Year Funding Amount
$125,000

The Children’s Museum of Southern Minnesota (CMSM) will complete the innovative community engagement process started with the previous Legacy grant. CMSM will build upon the progress created with the previous Legacy grant by transitioning the team's focus to carrying-out of strategic access strategies that engage a diversity of community members in the exhibit development process, resulting in the completion of fabrication plans for exhibits and environments that are accessible; engaging; and reflect the diverse art, culture, and heritage of southern Minnesota.

Aitkin
Anoka
Blue Earth
Brown
Carver
Chisago
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Isanti
Itasca
Jackson
Le Sueur
Lyon
Martin
McLeod
Mower
Nicollet
Nobles
Olmsted
Otter Tail
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
St. Louis
Stearns
Steele
Swift
Waseca
Washington
Watonwan
Winona
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
Red Lake Watershed District
2013 Fiscal Year Funding Amount
$123,400
Fund Source

This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.

Marshall
Pennington
Polk
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,968
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.

Kittson
Marshall
Roseau
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Anoka
Carver
Dakota
Dodge
Goodhue
Hennepin
Le Sueur
McLeod
Mower
Nicollet
Olmsted
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Steele
Wabasha
Washington
Wright
Recipient
Two Rivers Watershed District
2012 Fiscal Year Funding Amount
$179,348
2013 Fiscal Year Funding Amount
$99,933
Fund Source

This project will include analysis of existing and newly collected water quality data to verify the impairments on the currently listed reaches and to determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a focus throughout the Watershed Approach Project. The project provides an opportunity to assess and leverage the capacity for the local community to engage in the process of watershed management and to adopt protection and restoration practices.

Kittson
Marshall
Roseau
Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$26,477
Fund Source

This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.

Kittson
Lake of the Woods
Marshall
Roseau
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$134,867
Fund Source

This project will support water quality monitoring and data analysis in the Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Winona County Environmental Services
2017 Fiscal Year Funding Amount
$175,891
Fund Source

This project will identify areas for potential Best Management Practice (BMP) placement and identify strategies to strengthen social capacity and effectively engage citizens in development of the upcoming Watershed Restoration and Protection Strategy (WRAPS) report.

Fillmore
Houston
Mower
Winona
Recipient
Mower Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$37,591
Fund Source

This purpose of this project is to evaluate the conditions of eight streams in the Cedar River Watershed and one site on the Wapsipinicon River. Monitoring will take place for two years. Mower Soil and Water Conservation District staff will collect samples following Minnesota Pollution Control Agency (MPCA) Intensive Watershed Monitoring (IWM) sample collection protocols and will organize and review all field and laboratory data, along with field notes and photos.

Dodge
Mower
Recipient
Minnesota Pollution Control Agency
2011 Fiscal Year Funding Amount
$3,521,699
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Becker
Beltrami
Blue Earth
Carlton
Dakota
Dodge
Douglas
Freeborn
Goodhue
Jackson
Lake
Le Sueur
Lincoln
Mahnomen
Marshall
Morrison
Murray
Nobles
Norman
Otter Tail
Pennington
Pine
Pipestone
Polk
Rice
Rock
Roseau
Scott
St. Louis
Steele
Todd
Wadena
Waseca
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
International Water Institute
2011 Fiscal Year Funding Amount
$60,915
Fund Source

This project will support water quality monitoring and data analysis in nine major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The monitoring will assist in providing water chemistry data needed to calculate annual pollutant loads for the Major Watershed Load Monitoring Program (MWLMP) and provide short term data sets of select parameters to other MPCA programs.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Pennington
Polk
Red Lake
Roseau
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$53,199
Fund Source

This project will monitor nine locations in the major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The stream outlet monitoring will provide the water chemistry data needed to calculate annual pollutant loads. Staff from the Red River Watershed Management Board (RRWMB) will conduct the sampling, initially manage the data and provide the data to the Minnesota Pollution Control Agency (MPCA) for load calculations and import into the STORET data system.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau