Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$54,696
Fund Source

The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area Joint Powers Board
2013 Fiscal Year Funding Amount
$17,714
Fund Source

The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.

Blue Earth
Brown
Cottonwood
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Clearwater Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$10,519
Fund Source

The goal of this project is to establish data sets to evaluate the Aquatic Recreational Use of Mallard, Sucker, and Ozawindib Lakes in southeastern Clearwater County.

Clearwater
Recipient
Headwaters Science Center (HSC)
2013 Fiscal Year Funding Amount
$27,890
Fund Source

The goal of this project is to complete a two-year data set for physical, bacterial, and water chemistry sampling for the Intensive Watershed Monitoring Plan to aid MPCA’s assessment of the aquatic health of the Mississippi Headwaters(HUC 07010101) Watershed.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Kittson
Marshall
Pennington
Polk
Roseau
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Aitkin
Recipient
Aitkin County
2015 Fiscal Year Funding Amount
$13,946
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River Grand Rapids Watershed. Five lakes will be sampled, including Savanna, Shumway, Loon, Hay, and Washburn. Through this effort we will obtain information that will be useful in assessing the health of this watershed. This will be valuable in planning for future restoration and protection efforts that will ensure good water and environmental quality for Aitkin County.

Aitkin
Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$25,526
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River (Brainerd) Watershed. Four lakes will be sampled, including Sheriff, Rabbit, French, and Section Twelve. Four stream/river sites will be monitored including the Rice River (2 sites), Ripple River, and Sissabagama Creek. Through this effort we will obtain information that will be useful in assessing the health of this watershed.

Aitkin
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Kanabec County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$112,265
2013 Fiscal Year Funding Amount
$2,000
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$52,077
Fund Source

The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.

Itasca
Koochiching
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Clearwater Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$19,982
Fund Source

This project will provide the assessment of the chemical, physical, biological, and bacteriological integrity of surface waters.

Clearwater
Recipient
Clearwater Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$6,290
Fund Source

This project will complete a lake data set for 303(d) and Aquatic Recreation use assessments in Clearwater County by monitoring total phosphorus, chlorophyll-a and Secchi depth; by utilizing lakeshore owners.

Clearwater
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Crow Wing Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,315
Fund Source

This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Crow Wing County SWCD
2016 Fiscal Year Funding Amount
$48,450
2017 Fiscal Year Funding Amount
$6,326
Fund Source

The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Aitkin
Crow Wing
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Hubbard Soil & Water Conservation District (SWCD)
2012 Fiscal Year Funding Amount
$69,990
Fund Source

This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Snake River Watershed Management Board
2010 Fiscal Year Funding Amount
$171,766
Fund Source

The Snake River Watershed Management Board (SRWMB), working in concert with other local governmental units in within the watershed, will assist the MPCA, the project consultant, and other members of the Snake River Watershed Total Maximum Daily Load (TMDL) technical team in the completion of tasks associated with this TMDL project. SRWMB, with assistance from members of the technical team (Kanabec Soil and Water Conservation District (SWCD), Pine SWCD, Aitkin SWCD, and Mille Lacs SWCD) will provide the services to complete this TMDL project.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Vadnais Lake Area Watershed Management Organization (VLAWMO)
2010 Fiscal Year Funding Amount
$40,000
Fund Source

The VLAWMO watershed covers approximately 25 square miles in the northeast metropolitan area in northern Ramsey County and a small portion of Anoka County, Minnesota. It encompasses the City of North Oaks and portions of the Cities of White Bear Lake, Gem Lake, Vadnais Heights, Lino Lakes, and White Bear Township. This project will gather and organize existing data, support the continuation of modeling and TMDL allocations along with an additional stakeholder meeting. It will also provide the completion of a draft and final TMDL report.

Anoka
Ramsey
Recipient
Redwood-Cottonwood Rivers Control Area JPO
2013 Fiscal Year Funding Amount
$9,000
Fund Source

This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Carnelian-Marine-St. Croix Watershed District
2013 Fiscal Year Funding Amount
$132,000
Fund Source

Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Center for Energy and Environment
2010 Fiscal Year Funding Amount
$2,000,000

Increasing energy conservation and efficiency in residences can play a significant role in Minnesota's goals for energy savings and carbon emissions reductions. The Center for Energy and Environment (CEE), a Minneapolis-based nonprofit organization, is using this appropriation to develop and implement innovative residential energy efficiency programs. Programs will be demonstrated in eight cities: Apple Valley, Austin, Duluth, Minneapolis, Owatonna, Park Rapids, Rochester, and St. Paul.

Dakota
Hennepin
Mower
Olmsted
Ramsey
Steele
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
Itasca County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$25,595
Fund Source

This project will collect intermediate watershed load monitoring data on the Bigfork River which is critical to the identification of stressors and assist in defining areas of concern within the Bigfork Watershed and its greater Rainy River Watershed. Itasca County SWCD will closely collaborate with Koochiching SWCD and MPCA on this project.

Itasca
Koochiching
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Fillmore
Goodhue
Wabasha
Winona
Carlton
Houston
Koochiching
Lake of the Woods
Mahnomen
Olmsted
Otter Tail
Pine
Roseau
Stearns
Todd
Wadena
Aitkin
Anoka
Becker
Beltrami
Benton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Lake
Mille Lacs
Morrison
Sherburne
St. Louis
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$31,328
Fund Source

The Crow Wing River Watershed consists of approximately 1,959 square miles in the north to north central portion of the Upper Mississippi River Basin in Central Minnesota. The watershed encompasses all or parts of Becker, Cass, Clearwater, Crow Wing, Hubbard, Morrison, Otter Tail, Todd and Wadena Counties. The dominant land use within the watershed is forested (41%), agriculture (32%), grass, shrub and wetland make up 17%, water (7%) and urban (3%).

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
UMD, NRRI
2011 Fiscal Year Funding Amount
$507,000

PROJECT OVERVIEW

Cook
Koochiching
Lake
St. Louis
Recipient
Itasca County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$30,279
2018 Fiscal Year Funding Amount
$31,501
Fund Source

The project goal is to assist the Minnesota Pollution Control Agency (MPCA) with meeting the objectives of the Watershed Pollutant Load Monitoring Network (WPLMN). This will be accomplished by providing assistance in 2016 through 2019 to collect water samples, field data, and observations for the Big Fork River near Bigfork at MN6 in Itasca County, and the Big Fork River near Craigsville at MN6 in Koochiching County.

Itasca
Koochiching
Recipient
Kanabec Soil and Water Conservation District
2017 Fiscal Year Funding Amount
$46,410
Fund Source

This project encompasses surface water quality sampling within the Snake River Watershed over a period of two years (2017-18). This is the cycle II monitoring as follow-up to the original Snake River Watershed monitoring 10 years ago as part of the Watershed Restoration and Protection Strategy Report (WRAPS). This project shall provide follow-up data on the waters in the Snake River Watershed in regards to changes in water quality over this 10-year cycle. The current sampling project will entail sampling 5 lakes and 11 stream sites.

Aitkin
Kanabec
Pine
Recipient
Wenck Associates, Inc.
2019 Fiscal Year Funding Amount
$187,625
Fund Source

The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.

Aitkin
Carlton
Kanabec
Pine
Recipient
Koochiching County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$73,777
2014 Fiscal Year Funding Amount
$181,976
Fund Source

The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Capitol Region Watershed District
2012 Fiscal Year Funding Amount
$275,000
Fund Source

This project will compile and review previously conducted studies and will prioritize best management practices (BMPs) based on a cost-benefit analysis of their pollutant load reductions and life cycle costs. It will also support the design and construction of BMPs, such as rain gardens and infiltration practices, within the Villa Park subwatershed of the Lake McCarrons watershed.

Ramsey