Minnesota's Legacy

All Projects

Showing 1 - 40 of 48 | Export projects
Recipient
Hawk Creek Watershed Project
2013 Fiscal Year Funding Amount
$99,217
Fund Source

This project will monitor six sites within the Minnesota River Basin: Hawk Creek near Maynard, Hawk Creek near Granite Falls, Beaver Creek near Beaver Falls, Yellow Medicine River near Granite Falls, Yellow Medicine River near Hanley Falls, and Spring Creek near Hanley Falls. The sites will be monitored according to MPCA’s Major Watershed Load Monitoring (WPLMN) Standard Operating Procedure, which is the procedure being followed for sites currently monitored by the Hawk Creek Watershed Project (HCWP).

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$52,077
Fund Source

The "Bigfork River Target Watershed Assessment – Lake of the Woods & Koochiching Soil and Water Conservation Districts" Project focuses on collecting water chemistry and field parameters at Bear River, Big Fork River (4 sites), Caldwell Brook and Sturgeon River. The project will support the biological assessments being completed by MPCA staff for this Target Watershed Assessment. This work will also train and develop Koochiching SWCD staff to enable them to continue water quality monitoring in the Rainy River Basin.

Itasca
Koochiching
Recipient
Bois de Sioux Watershed District
2011 Fiscal Year Funding Amount
$150,000
Fund Source

This project will develop a watershed approach plan, including impaired waters allocations, for the Mustinka Watershed, located at the headwaters of the Red River of the North, in western Minnesota, lying partly in Grant, Stevens, Ottertail, Big Stone, and Traverse counties. The watershed approach plan will set water quality goals for the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet state standards and are listed as impaired.

Big Stone
Grant
Otter Tail
Stevens
Traverse
Recipient
Washington Conservation District
2010 Fiscal Year Funding Amount
$103,598
Fund Source

Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Renville County c/o Hawk Creek Watershed Project
2012 Fiscal Year Funding Amount
$149,860
Fund Source

This project will establish a framework and provide tools for local government and watershed projects to engage the public in a manner that will lead to water quality improvement through targeted and prioritized implementation of watershed management practices. The major components of the watershed approach that will be used for this project include; monitoring, gathering of watershed information, assessment of the data, develop of implementation strategies, and implementation of water quality protection and restoration activities.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Vermillion River Watershed Joint Powers Organization (Fiscal Agent: Dakota County)
2012 Fiscal Year Funding Amount
$189,170
Fund Source

This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.

Dakota
Goodhue
Scott
Wabasha
Washington
Recipient
Yellow Medicine River Watershed District
2012 Fiscal Year Funding Amount
$105,121
Fund Source

This project approach will include monitoring and gathering of watershed information, assess the data, develop implementation strategies to meet standards and protect waters, implement water quality protection and restoration activities in the watershed. The goal of this project is to establish a framework, and to provide information and tools for local government and watershed organizations to engage the public in a manner that will lead to water quality improvement.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Bois de Sioux Watershed District
2013 Fiscal Year Funding Amount
$285,000
Fund Source

This project will set water quality goals for the Minnesota portions of the watershed, recommend allocations for achieving total maximum daily loads where waters do not meet Minnesota state standards and are listed as impaired, and recommend management strategies for those Minnesota waters meeting state standards. This project also recognizes that as monitoring continues in the watershed, additional impairments may be identified.

Grant
Otter Tail
Traverse
Wilkin
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Crow River Organization of Water
2013 Fiscal Year Funding Amount
$19,999
Fund Source

The primary focus of this project is the collection of lake core samples to aid in the completion of lake TMDLs for Dean, Malardi & Fountain lakes. This work will enable completing tasks included in the North Fork Crow River Watershed Restoration & Protection Project (WRPP). Additional data collection is needed to update lake response models. This new data will provide a cohesive and comprehensive data collection for Dean, Malardi and Fountain lakes.

Carver
Hennepin
Kandiyohi
McLeod
Meeker
Pope
Stearns
Wright
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Chisago Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$196,600
Fund Source

TMDL project in the Chisago Lakes Lake Improvement District that will develop a watershed based plan and provide strategies for water quality and aquatic ecosystem management, restoration, and protection within Sunrise River Watershed. This project will also aid in understanding the Phosphorus loading to Lake St. Croix.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Kanabec Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$201,992
Fund Source

This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.

Anoka
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Washington
Recipient
Laq qui Parle-Yellow Bank Watershed District
2012 Fiscal Year Funding Amount
$260,900
Fund Source

This project will offer incentives to protect 80 acres of land in filter strips and highly erodible lands adjacent to the rivers; construct 9 sediment and water control basins or terraces; replace 35 open tile intakes and advocate wetland restorations and grassland easement programs; organize a Friendship Tour to bring together Minnesota farmers, county commissioners, farm organizations, local, state and federal agency personnel to experience the watershed, farming practices, discuss future project ideas and strengthen relationships; and upgrade 37 subsurface sewage treatment systems by off

Lac qui Parle
Lincoln
Yellow Medicine
Recipient
Redwood-Cottonwood Rivers Control Area JPO
2013 Fiscal Year Funding Amount
$9,000
Fund Source

This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Carnelian-Marine-St. Croix Watershed District
2013 Fiscal Year Funding Amount
$132,000
Fund Source

Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Metropolitan Council/Barr Engineering Company
2010 Fiscal Year Funding Amount
$35,246
2011 Fiscal Year Funding Amount
$31,754
Fund Source

On behalf of the Metropolitan Council, Barr Engineering Company developed maps and supporting information to characterize the relationship between surface waters and groundwater, identifying surface waters most likely to be impacted by groundwater withdrawals in the region. This project also provided guidance on effective resource monitoring strategies and costs for each type of surface water feature.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Itasca County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$25,595
Fund Source

This project will collect intermediate watershed load monitoring data on the Bigfork River which is critical to the identification of stressors and assist in defining areas of concern within the Bigfork Watershed and its greater Rainy River Watershed. Itasca County SWCD will closely collaborate with Koochiching SWCD and MPCA on this project.

Itasca
Koochiching
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
Prairie Country Resource Conservation & Development, c/o Hawk Creek Watershed Project
2010 Fiscal Year Funding Amount
$52,753
Fund Source

This project will assess 4 lakes and 17 stream sites. The four lakes will be assessed for total phosphorus, chlorophyll-a, and secchi data by the HCWP staff. Staff will monitor East Twin, West Twin, West Solomon, and St. John’s Lakes for total phosphorus, chlorophyll-a, and Secchi disk readings. In order to obtain a sufficient dataset. Ten samples will be collected over 2 years. Water samples at 17 stream locations for chemical analyses, including intensive watershed monitoring sites and “non-target” sites.

Chippewa
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Redwood
Renville
Yellow Medicine
Recipient
Koochiching County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$73,777
2014 Fiscal Year Funding Amount
$181,976
Fund Source

The Koochiching County SWCD staff will collect water chemistry and field parameters at specific times to determine amount of contaminant load into each stream. These sites will coincide with locations where stream flow data is also being collected. This project will focus on watershed load monitoring in both the Big Fork and Little Fork River watersheds.

Itasca
Koochiching
St. Louis
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$39,134
Fund Source

This project will provide monitoring of four of the major watersheds (8-digit Hydrologic Unit Codes) in the western part of the Rainy River Basin. Staff from the Lake of the Woods SWCD will conduct water quality sampling, review, manage and provide collected data to the Minnesota Pollution Control Agency (MPCA).

Beltrami
Itasca
Koochiching
Lake of the Woods
Roseau
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$13,986
Fund Source

This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Metropolitan Council/Minnesota Geological Survey
2011 Fiscal Year Funding Amount
$23,181
2012 Fiscal Year Funding Amount
$27,850
Fund Source

On behalf of the Metropolitan Council, the Minnesota Geological Survey evaluated the vulnerability of glacial aquifers in the Twin Cities metropolitan area. The project improved upon previous vulnerability assessments by incorporating a substantial amount of new aquifer property information and blending methods previously used by the Minnesota Departments of Health and Natural Resources. The result is a consistent vulnerability assessment across the metropolitan area based on the most up-to-date information available.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Itasca County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$64,701
Fund Source

The goal of this project is complete a dataset necessary for assessment of 6 stream sites and 11 lakes within the Mississippi Headwaters Watershed to determine the overall health of its water resources, to identify impaired waters, and to identify those waters in need of additional protection to prevent future impairments.

Becker
Beltrami
Cass
Clearwater
Hubbard
Itasca
Recipient
Minnesota Department of Agriculture
2015 Fiscal Year Funding Amount
$28,757
2014 Fiscal Year Funding Amount
$34,868
2013 Fiscal Year Funding Amount
$36,550
2012 Fiscal Year Funding Amount
$25,000
Fund Source

This project was part of a three-state partnership to test, demonstrate and promote a simple, inexpensive and reliable new system for edge-of-field water monitoring. The University of Wisconsin-Platteville Pioneer Farm, in collaboration with UW-Platteville Engineering, has developed a low cost monitoring system that can obtain good quality, edge-of-field monitoring data in agricultural settings. By eliminating unnecessary features and assembling components in-house, the prototype monitoring system derives the majority of cost savings with minimal sacrifice in accuracy.

Dodge
Fillmore
Goodhue
Wabasha
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$53,199
Fund Source

This project will monitor nine locations in the major watersheds (8-digit Hydrologic Unit Codes) of the Lower Red River Basin. The stream outlet monitoring will provide the water chemistry data needed to calculate annual pollutant loads. Staff from the Red River Watershed Management Board (RRWMB) will conduct the sampling, initially manage the data and provide the data to the Minnesota Pollution Control Agency (MPCA) for load calculations and import into the STORET data system.

Beltrami
Clearwater
Kittson
Mahnomen
Marshall
Norman
Pennington
Polk
Red Lake
Roseau
Recipient
Pipestone Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$49,130
Fund Source

This project will collect water quality data at eight stream sites in three of the MPCA targeted watersheds. The sites are located on Medary Creek, Flandreau Creek, Pipestone Creek (2), Split Rock Creek, Rock River, Poplar Creek and Chanarambie Creek. This project will also promote a citizens monitoring program and encourage individuals to participate in a monitoring program.

Lincoln
Murray
Nobles
Pipestone
Rock
Recipient
Aitkin County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$9,900
Fund Source

This project will monitor sites at the Sandy River, Bass Lake, and Remote Lake located in the Big Sandy Lake Watershed.

Aitkin
Cass
Itasca
Recipient
Rock County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$29,103
Fund Source

This comprehensive water sampling program will assess the water quality of six sites: two main points on the Rock River, two main tributaries to the Rock River, and two points where streams leave the state (Mud and Beaver Creek) for a period of two years.

Lincoln
Murray
Nobles
Pipestone
Rock
Recipient
Beltrami County Environmental Services
2011 Fiscal Year Funding Amount
$92,475
Fund Source

This monitoring project will complete assessments of 41 lakes found throughout Beltrami COunty and acquire sufficient data for state/local assessments and also assist with county water planning.

Beltrami