Minnesota's Legacy

All Projects

Showing 1 - 40 of 40 | Export projects
Recipient
City of Milaca AKA Milaca Parks Commission
2012 Fiscal Year Funding Amount
$14,920
Rec Fest 2012
Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Recipient
Metropolitan Council/University of Minnesota - Minnesota Technical Assistance Program (MnTAP)
2012 Fiscal Year Funding Amount
$11,243
2013 Fiscal Year Funding Amount
$36,453
2014 Fiscal Year Funding Amount
$45,337
Fund Source

Working with the Metropolitan Council, the University of Minnesota - Minnesota Technical Assistance Program (MnTAP) is investigating the opportunity for water conservation by private industrial water users across the Twin Cities metropolitan region. Private industrial water users are defined as industries that use private wells for their water supply. This work is determining factors that encourage or create barriers for implementation of identified industrial water conservation opportunities.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$14,142
Fund Source

This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Forest Lake Park Board
2012 Fiscal Year Funding Amount
$5,000
Arts in the Park
Washington
Recipient
Washington County 4-H Federation
2012 Fiscal Year Funding Amount
$5,000
County Arts-In
Washington
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$56,175
Fund Source

The goal of this project is to offer grant funding to boat marinas located in Washington County on the St. Croix River to complete water quality improvement projects. St. Croix marinas own large amounts of shoreline plus there are roads, parking areas, buildings, and garages. These all produce runoff that drains directly into the St. Croix River. Marinas also often include pollution hotspots due to the presence of boat fueling areas.

Washington
Recipient
Chisago County
2012 Fiscal Year Funding Amount
$5,651
Fund Source

Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Vermillion River Watershed Joint Powers Organization (Fiscal Agent: Dakota County)
2012 Fiscal Year Funding Amount
$189,170
Fund Source

This project will consist of identifying the candidate causes of biological stress and to develop and implement a public and stakeholder participation process that encourages local ownership of water quality problems and solutions. The Stressor ID process will be done using existing data, identifying data gaps, gathering new data, developing load duration curves, and refinement of the candidate causes. The civic engagement work will include compiling and reviewing existing data on community capacity and assessing that information.

Dakota
Goodhue
Scott
Wabasha
Washington
Recipient
Kanabec Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$201,992
Fund Source

This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.

Anoka
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Washington
Recipient
Comfort Lake Forest Lake Watershed District
2012 Fiscal Year Funding Amount
$30,200
Fund Source

The Comfort Lake Forest Lake Watershed includes numerous private ditches and partially drained wetlands which are a priority for mapping, assessment and restoration. The project will include the mapping and assessment of all drained and partially drained wetlands in the watershed. In addition, a web-based GIS system will be developed to inventory, assess, target and track the effectiveness of various conservation practices towards the attainment of water quality goals.

Chisago
Washington
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
Lake of the Woods Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$108,044
Fund Source

This project involves the water quality monitoring of, and data analysis for four major watersheds (8-digit Hydrologic Unit Codes) in the Rainy River Basin. This monitoring will assist in providing the water chemistry data needed to calculate annual pollutant loads for the Major Watershed Pollutant Load Monitoring Network (MWPLMN) and provide short term data sets of select parameters to other Agency programs.

Beltrami
Itasca
Koochiching
Lake of the Woods
St. Louis
Recipient
Comfort Lake-Forest Lake Watershed District
2012 Fiscal Year Funding Amount
$176,047
Fund Source

Comfort Lake is one of Chisago county's largest recreational lakes. Comfort Lake is of regional significance with public access for boating, fishing and swimming. A pollution reduction study was conducted for the lake because of decreasing water quality. This study identified highly urban areas as one of the sources of nutrients.

Chisago
Washington
Recipient
Leech Lake Band of Ojibwe
2012 Fiscal Year Funding Amount
$25,000
2013 Fiscal Year Funding Amount
$25,000

The Leech Lake Band of Ojibwe is working within the Leech Lake Reservation boundaries to address loss and degradation of aquatic habitat for wild rice and waterfowl. Efforts will include regulating water levels on shallow lakes by controlling beaver activity and conducting periodic water level draw-downs, reseeding of approximately 200 acres of wild rice, and implementing adaptive management based on analysis of wild rice productivity.

Beltrami
Cass
Hubbard
Itasca
Recipient
Metropolitan Council
2009 Fiscal Year Funding Amount
$67,899
2010 Fiscal Year Funding Amount
$79,070
2010 Fiscal Year Funding Amount
$75,783
2011 Fiscal Year Funding Amount
$64,020
2011 Fiscal Year Funding Amount
$85,473
2012 Fiscal Year Funding Amount
$70,469
2013 Fiscal Year Funding Amount
$179,573
2014 Fiscal Year Funding Amount
$160,004
Fund Source

In 2005, Metropolitan Council was directed to carry out regional water supply planning activities under Minnesota Statutes, section 473.1565. Working closely with the region's many water supply stakeholders and under the guidance of a metropolitan area water supply advisory committee, Metropolitan Council developed and adopted a metropolitan area master water supply plan (master plan) in 2010. The plan provides a framework for water supply planning and identifies actions needed to achieve the goal of ensuring sustainable water supplies across the region.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
South Washington Watershed District
2012 Fiscal Year Funding Amount
$156,645
Fund Source

In partnership with the Washington Conservation District and City of Woodbury, this project will improve water quality in Colby Lake through implementing 30 priority small-scale water quality conservation practices. Projects may include bioretention, vegetated swales and pond modifications. Priority projects were identified as part of the Colby Lake Watershed Retrofit Assessment and represent the most cost-effective means to reduce excess phosphorus loads that have impacted Colby Lake.

Washington
Recipient
Brown's Creek Watershed District
2012 Fiscal Year Funding Amount
$158,800
Fund Source

In collaboration with the University of Minnesota St. Anthony Falls Laboratory, City of Stillwater and MN DNR Waters and Fisheries an iron-enhanced sand filter will be designed. This filter will remove approximately 118 pounds of total phosphorous per year from an area of Stillwater that ultimately drains to the St. Croix River, a national Wild and Scenic River that has a decling water quality trend.

Washington
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$30,000
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project supports the planning, coordination and civic engagement/outreach components of the Leech Lake River Major Watershed project. Phase 1 will focus towards the development of project teams, identifying stakeholders, developing an initial civic engagement strategic plan and reviewing current and past watershed project data. Phase II of this project will focus on source assessment, running of watershed modeling scenarios, lake protection planning, stressor identification and the continuation of the Civic Engagement components of the project.

Beltrami
Cass
Hubbard
Recipient
Middle St. Croix Watershed Management Organization
2012 Fiscal Year Funding Amount
$45,525
Fund Source

Lily Lake, near Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake's water quality is declining because of excess nutrients. Restoring it is a priority for the community of Stillwater.

Washington
Recipient
Middle St. Croix Watershed Management Organization
2012 Fiscal Year Funding Amount
$194,900
Fund Source

Lily Lake,near Stillwater, is a popular recreational spot for residents with its swimming beach, fishing pier, and canoe access. Lily Lake's water quality is declining because of excess nutrients. Restoring it is a priority for the community of Stillwater.
This project is a continaution project of the Phase I project that started in the spring of 2011 and complements the Phase II project recently funded in 2012. Specifically, this project will implement two large stormwater retrofits in large parking lots of DiaSoren Manufacturing and the Valley Ridge Mall.

Washington
Recipient
Metropolitan Council/Minnesota Geological Survey
2011 Fiscal Year Funding Amount
$23,181
2012 Fiscal Year Funding Amount
$27,850
Fund Source

On behalf of the Metropolitan Council, the Minnesota Geological Survey evaluated the vulnerability of glacial aquifers in the Twin Cities metropolitan area. The project improved upon previous vulnerability assessments by incorporating a substantial amount of new aquifer property information and blending methods previously used by the Minnesota Departments of Health and Natural Resources. The result is a consistent vulnerability assessment across the metropolitan area based on the most up-to-date information available.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Middle St. Croix Watershed Management Organization
2012 Fiscal Year Funding Amount
$37,925
Fund Source

MuKusick Lake's water quality is declining because of excess nutrients and restoring it is a priority for the Stillwater community.
This project will work to implement priority stormwater treatment projects that were identified in the 2010 McKusick Lake Stormwater Retrofit Assessment. This project will be the first phase of stormwater treatment implementation projects within the McKusick Lake watershed and will provide approximately 10% of the needed phosphorus reduction.

Washington
Recipient
Metro Conservation Districts
2012 Fiscal Year Funding Amount
$216,181
Fund Source

Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
T.B. Sheldon Memorial Theatre AKA The Sheldon Theatre
2012 Fiscal Year Funding Amount
$22,753
Operating Support
Anoka
Blue Earth
Brown
Carver
Chisago
Dakota
Dodge
Faribault
Fillmore
Freeborn
Goodhue
Hennepin
Houston
Isanti
Itasca
Le Sueur
Lyon
McLeod
Meeker
Morrison
Mower
Murray
Nicollet
Olmsted
Otter Tail
Pine
Ramsey
Rice
St. Louis
Scott
Sherburne
Steele
Wabasha
Washington
Winona
Wright
Recipient
City of Rochester Music Department AKA Riverside Concerts
2012 Fiscal Year Funding Amount
$27,732
Operating Support
Olmsted
Dodge
Fillmore
Freeborn
Goodhue
Houston
Mower
Rice
Steele
Wabasha
Winona
Anoka
Blue Earth
Carver
Crow Wing
Dakota
Faribault
Goodhue
Hennepin
Isanti
Kandiyohi
Le Sueur
Martin
Morrison
Nicollet
Nobles
Ramsey
Scott
Sherburne
Sibley
St. Louis
Stearns
Todd
Waseca
Washington
Wright
Recipient
Mississippi Headwaters Board
2012 Fiscal Year Funding Amount
$100,000
Fund Source

The 400-mile stretch of the Mississippi River from its headwaters at Lake Itasca to Morrison County near Little Falls is the focus of this project. Working in cooperation with the eight member counties, this project will develop implementation plans and strategies geared specifically for the Mississippi River and incorporate them into the individual County Comprehensive Local Water Plans. These recommendations will be for specific strategies, often crossing county boundaries for implementation.

Aitkin
Beltrami
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$194,490
Fund Source

This project will provide land and water managers in the Red River Basin with data and online tools to prioritize actions on the landscape that achieve water quality objectives identified in local and state plans. This will help identify strategically important locations for implementing erosion control and water management practices. Standardized watershed-based data products will be integrated into a web-based planning tool which will be added to the Red River Basin Decision Information Network (RRBDIN) being developed as part of the Red River Watershed Feasibility Study.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
City of Bayport
2012 Fiscal Year Funding Amount
$9,002
Fund Source
Collect and analyze data upgradient from the Bayport wellhead protection area and determine the potential impacts to Bayport's water supply; Feasibility study to evaluate options for an overlay district, potential additional TCE water treatment, sentry mo
Washington
Recipient
City of Hugo
2012 Fiscal Year Funding Amount
$7,000
Fund Source
Equipment for long term monitoring of water levels and installation
Washington
Recipient
City of St. Paul Park
2012 Fiscal Year Funding Amount
$4,500
Fund Source
Update list of properties with undocumented, unused or cross-connected wells; Educate property owners of best management practices and options to seals the wells on their property
Washington
Recipient
Metropolitan Council/Short Elliott Hendrickson Inc.
2011 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$21,932
2016 Fiscal Year Funding Amount
$99,767
Fund Source

The goal of this project is to evaluate projected water demand, groundwater contamination and potential natural resource impacts in southern Washington County to ensure water supplies are developed sustainably. An important part of this project involves working with stakeholders to identify common goals and objectives, as well as ways to enhance coordination amongst water suppliers and water resource managers.

Washington
Recipient
Rice Creek Watershed District and City of Hugo
2012 Fiscal Year Funding Amount
$497,100
Fund Source

Bald Eagle Lake is a popular recreational lake known for its fishery on the Metropolitan Council's Priority Lakes List. The lake is negatively impacted by excess nutrients and restoring its water quality is a local priority.
This project will collect stormwater runoff from an approximately 900 acre area and re-use it to irrigate an existing golf course. This innovative project will provide a multitude of environmental benefits for Bald Eagle Lake including significant runoff volume reduction, groundwater recharge and phosphorus load reduction.

Anoka
Ramsey
Washington
Recipient
Red Lake Watershed District
2012 Fiscal Year Funding Amount
$86,514
Fund Source

A partnership of local agencies and organizations will monitor water quality at eighteen carefully chosen sites within the Red Lake River and Grand Marais Creek watersheds. Fourteen monitoring sites have been chosen within the Red Lake River watershed. Four sites have been chosen in the Grand Marais Creek watershed. Each of these sites will provide a representative assessment of the water quality conditions within one or more minor subwatersheds at the 12-digit hydrologic unit code (HUC12) level.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
South Washington Watershed District
2012 Fiscal Year Funding Amount
$82,510
Fund Source

This project will help restore and protect two unique resources in southern Washington County - Trout Brook and Lake St. Croix. Previous assessments identified the 100 sites in southern Washington County that contribute the most to the existing excess nutrient problem and declining water quality of Lake St. Croix. Twenty-two of those sites are in the Trout Brook watershed and also contribute to sediment and turbidity that are degrading habitat in this cold-water stream.

Washington
Recipient
Metropolitan Council/Barr Engineering Company
2012 Fiscal Year Funding Amount
$20,789
2013 Fiscal Year Funding Amount
$135,416
2014 Fiscal Year Funding Amount
$66,495
2015 Fiscal Year Funding Amount
$5,662
Fund Source

State law charges the Metropolitan Council (Council) with developing and maintaining a base of technical information needed for sound water supply decisions (Minnesota Statutes 473.1565). The Council’s primary tool to provide this information is the Metro Model 2, a regional groundwater model capable of predicting the impacts of planned water demand on aquifers and connected lakes and streams. The Metro Model 2 is a modern and comprehensive groundwater model of the Twin Cities area, but it is currently out-of-date.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Metropolitan Council
2012 Fiscal Year Funding Amount
$16,549
2013 Fiscal Year Funding Amount
$73,308
Fund Source

Regional recharge modeling with the Twin Cities daily soil water balance (SWB) model has been a fundamental part of the Metropolitan Council’s groundwater flow modeling effort and supports the Metropolitan Area Master Water Supply Plan. The SWB model is used to evaluate the impact of planned and potential land use and climate on recharge in the eleven-county metropolitan area, and supports the ongoing update of the regional groundwater flow model.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Sherburne
Washington
Wright
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$150,000
Fund Source

A large amount of effort has gone in to identifying phosphorous loading and other nutrient sources in West Washington County. Installing stormwater retrofit projects at local church campuses represents a major opportunity for water quality improvement. In partnership, three watershed organizations will install conservation practices, targeting impervious surfaces on the campuses. This project will provide funding to install raingardens, pervious pavement and rainwater harvesting methods to capture and improve water quality to downstream water resources.

Washington