Minnesota's Legacy

All Projects

Showing 1 - 40 of 51 | Export projects
Recipient
Redwood-Cottonwood Rivers Control Area Joint Powers Board
2013 Fiscal Year Funding Amount
$17,714
Fund Source

The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.

Blue Earth
Brown
Cottonwood
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Redwood Cottonwood Rivers Control Area
2014 Fiscal Year Funding Amount
$138,033
Fund Source
The goal of this project is to perform water quality monitoring and load calculation duties to accomplish MPCA's Watershed Pollutant Load Monitoring Network monitoring efforts at seven sites for the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton.
Brown
Lyon
Redwood
Recipient
Pennington SWCD
2014 Fiscal Year Funding Amount
$91,300
Fund Source

The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.

Pennington
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$277,500
Fund Source

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.

Red Lake
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Red Lake
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Red Lake
Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Red Lake
Recipient
Area 6 - South Central Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

South Central Technical Service Area (SCTSA) will use this Clean Water Fund grant to provide Soil and Water Conservation Districts and other local organizations in its eleven-county area with a Geographic Information System (GIS) Technician to assist in using available GIS information to target specific locations where Best Management Practices (BMPs) can be installed to help improve water quality.

Blue Earth
Brown
Faribault
Le Sueur
Martin
McLeod
Nicollet
Renville
Sibley
Waseca
Watonwan
Recipient
Blue Earth County
2014 Fiscal Year Funding Amount
$69,000
Fund Source

With limited funds and limited staff time available for targeting critical service areas and implementing Best Management Practices (BMPs), Geographic Information System (GIS)-based tools that pinpoint locations where BMPs will have the highest effectiveness are increasingly important. The Blue Earth County/SWCD Watershed Implementation Targeting project will utilize LiDAR topographic data to determine areas of high importance for BMP implementation. The county is located in the Blue Earth, LeSueur, Watonwan and Middle Minnesota watersheds where there is a high density of impaired waters.

Blue Earth
Recipient
Blue Earth County
2015 Fiscal Year Funding Amount
$95,000
Fund Source

This project will conduct Inventory and Inspection of four drainage ditches in Blue Earth County: JD116, CD5, CD86 and CD56. The inventory of these drainage ditches is important in order to identify where erosion, sediment and/or nutrients contribute substantially to water quality degradation. The project will also prioritize sites for future side inlet control, buffer strip implementation, and/or storage and treatment implementation.

Blue Earth
Recipient
Brown County
2015 Fiscal Year Funding Amount
$34,200
Fund Source

Currently, over 235 miles of open ditch are under the jurisdiction of the Brown County Ditch Authority. A majority of Brown County public ditches drain into large, impaired rivers including the Minnesota River (Turbidity), Cottonwood River (Turbidity/Fecal Coliform), Little Cottonwood River (Turbidity/Fecal Coliform) and Watonwan River (Turbidity/Fecal Coliform). Thus far the Brown County Drainage Authority has been inventorying ditches as requested for repair by residents in the ditch system.

Brown
Recipient
Brown County
2010 Fiscal Year Funding Amount
$33,065
Fund Source

This project will work in cooperation with individual volunteers to perform grab samples and visual assessments of four waterbody sites in Brown County. The data collected will be an educational tool to inform the County’s citizens about water quality concerns. Using volunteers to collect the water quality samples and visual assessments will result in the volunteers taking personal pride and stewardship in clean water throughout the County.

Brown
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
City of Mankato
2015 Fiscal Year Funding Amount
$111,000
Fund Source

The goal of this project is to determine how ferric chloride application points and dosage can lower phosphorus levels.

Blue Earth
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
Scott Watershed Management Organization
2013 Fiscal Year Funding Amount
$225,000
Fund Source

This project will promote land and water treatment practices, including wetland restoration, riparian vegetation management, geomorphic (stream stabilization and grade control), livestock exclusion, native grasses, and rain gardens. Also included are three specific geomorphic (stream/grade) stabilization projects in the Hidden Hills Park area of Savage, a wetland restoration in Savage, and finishing the Ponds Park Storm Water Reuse Project.

Scott
Recipient
Scott Watershed Management Organization
2013 Fiscal Year Funding Amount
$225,000
Fund Source

This project will promote land and water treatment practices, including wetland restoration, riparian vegetation management, geomorphic (stream stabilization and grade control), livestock exclusion, native grasses, and rain gardens. Also included are three specific geomorphic (stream/grade) stabilization projects in the Hidden Hills Park area of Savage, a wetland restoration in Savage, and finishing the Ponds Park Storm Water Reuse Project.

Scott
Recipient
Scott Watershed Management Organization
2013 Fiscal Year Funding Amount
$225,000
Fund Source

This project will promote land and water treatment practices, including wetland restoration, riparian vegetation management, geomorphic (stream stabilization and grade control), livestock exclusion, native grasses, and rain gardens. Also included are three specific geomorphic (stream/grade) stabilization projects in the Hidden Hills Park area of Savage, a wetland restoration in Savage, and finishing the Ponds Park Storm Water Reuse Project.

Scott
Recipient
Blue Earth County SWCD
2016 Fiscal Year Funding Amount
$374,500
Fund Source

The purpose of this project is to reduce phosphorus loading to Crystal Lake transported primarily through County Ditch 56. Crystal Lake is listed on MPCA's 303d listing for phosphorus impairment. Increased phosphorus levels have caused toxic algal blooms, reducing its appeal to recreationalists and economic draw for the City of Lake Crystal. This project will directly address phosphorus sources from agricultural land.

Blue Earth
Recipient
Minnesota River Board
2012 Fiscal Year Funding Amount
$91,691
Fund Source

This project will support a civic engagement cohort that will be offered in southwest Minnesota to foster partnering and build capacity of local government, organizations, and residents for effective civic engagement in water protection and restoration. This project will also build networks and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection. The cohort will be administered through the Minnesota River Board (MRB), established in 1995 with a goal of focusing water management efforts on the local level.

Big Stone
Blue Earth
Brown
Chippewa
Cottonwood
Douglas
Faribault
Grant
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Nobles
Otter Tail
Pipestone
Pope
Redwood
Renville
Rock
Sibley
Stevens
Swift
Traverse
Waseca
Watonwan
Yellow Medicine
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Redwood-Cottonwood Rivers Control Area JPO
2013 Fiscal Year Funding Amount
$9,000
Fund Source

This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Pennington SWCD
2017 Fiscal Year Funding Amount
$332,749
Fund Source

Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.

Pennington
Recipient
Nicollet SWCD
2017 Fiscal Year Funding Amount
$90,400
Fund Source

This project will layer hydrologic, hydraulic, geomorphic, and pollutant loading analysis with existing countywide PTMApp outputs to identify the four highest priority areas for BMP implementation in an eastern Nicollet County ravine system experiencing dramatic mass wasting events. Three alternatives for each priority site will be presented, including an evaluation of water quality benefit, construction costs, and a cost-benefit summary.

Nicollet
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2016 Fiscal Year Funding Amount
$142,257
2018 Fiscal Year Funding Amount
$40,405
2019 Fiscal Year Funding Amount
$28,078
Fund Source

The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.

Brown
Lyon
Redwood
Recipient
Hawk Creek Watershed Project
2015 Fiscal Year Funding Amount
$26,000
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy (WRAPS) report to maintain and improve water quality for the Hawk Creek Watershed.

Renville
Sibley
Recipient
Lac qui Parle County Envrionmental Office
2015 Fiscal Year Funding Amount
$101,916
Fund Source

Lac qui Parle-Yellow Bank Watershed District will collect water chemistry samples from the three lakes and twenty-nine stream sites in the Lac qui Parle and Minnesota Headwaters watersheds following the MPCA’s Intensive Watershed Monitoring (IWM) plan for lakes and streams. Eleven samples will be collected at each lake from May through September during 2015 and 2016. Eleven samples will be collected at each of the twenty-nine stream sites in 2015. In addition, sixteen samples at each stream site will be collected in 2015 and 2016 following the E.

Big Stone
Lac qui Parle
Swift
Yellow Medicine
Recipient
Brown Soil and water Conservation District
2015 Fiscal Year Funding Amount
$87,030
Fund Source

This project is to create a contact strategy for community/landowner opportunities, obstacles, and opinions on land management and water quality that will result in the identification of restoration and protection strategies for the Minnesota River Mankato watershed in Redwood, Blue Earth, Brown, Cottonwood and LeSueur Counties.

Blue Earth
Brown
Le Sueur
Redwood
Recipient
Nicollet County
2015 Fiscal Year Funding Amount
$51,000
Fund Source

The Minnesota Pollution Control Agency (MPCA) is using a watershed approach to protect and restore waters of the state. This approach encompasses all of the 80 major watersheds over a ten year period. The process includes intensive biological and chemical monitoring followed by an assessment report. The assessment results determine which lakes and stream reaches are in need of restoration and which are in need of protection.

Nicollet
Recipient
Blue Earth County
2014 Fiscal Year Funding Amount
$33,000
Fund Source

The primary goal of this project is to develop a Minnesota Pollution Control Agency (MPCA) lead comprehensive Watershed Restoration and Protection Strategies (WRAPS) report to be used on the local level. Achieving this goal will require sound working relationships between local units of government, citizens, and state government. The Lakes Engagement Team will gather input from these groups and contribute towards the creation of a Watershed Restoration and Protection Strategy (WRAPS) report that can be utilized by local decision-makers.

Blue Earth
Renville
Recipient
Greater Blue Earth River Basin Alliance
2017 Fiscal Year Funding Amount
$301,200
Fund Source

The Greater Blue Earth River Basin Alliance (GBERBA) along with Soil and Water Conservation Districts, Counties, landowners, and drainage authorities in the ten member counties will install conservation drainage practices to improve water quality. 103E drainage systems with documented sediment or water quality issues are the focus with the goal of installing 52 practices such as improved side inlets (grade stabilization structures), alternative tile inlets, denitrifying bioreactors, saturated buffers, storage wetlands and others.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
Recipient
Great River Greening/Nicollet County SWCD
2013 Fiscal Year Funding Amount
$39,280
Fund Source

This grant will allow Nicollet SWCD and partners the means to establish local and regional volunteer monitors for this and future monitoring activities in the Middle Minnesota River Watershed Basin. It also enhances past water quality studies by providing present data for water quality assessment in the Seven Mile Creek Watershed, which has and is receiving support by numerous entities to increase the water quality of that watershed.

Blue Earth
Brown
Cottonwood
Le Sueur
Nicollet
Redwood
Renville
Sibley
Watonwan
Recipient
Nicollet County
2016 Fiscal Year Funding Amount
$84,152
Fund Source

Nicollet County is located in south central Minnesota and is bordered on two sides by the Minnesota River. A line of forested bluffs separate the river valley from land that is relatively flat and historically used for agricultural purposes. Approximately 245,000 acres of the County are actively farmed. The 2012 impaired waters list for water bodies located in Nicollet County include the Minnesota River, Seven Mile Creek, Rogers Creek and tributaries to the Rush River.

Nicollet
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Red Lake WD
2015 Fiscal Year Funding Amount
$38,700
Fund Source

The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin