Minnesota's Legacy

All Projects

Showing 1 - 40 of 49 | Export projects
Recipient
Aitkin County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$25,526
Fund Source

The Aitkin County Soil and Water Conservation District will partner with the Minnesota Pollution Control Agency and local volunteers to conduct water quality monitoring in high priority areas of the Upper Mississippi River (Brainerd) Watershed. Four lakes will be sampled, including Sheriff, Rabbit, French, and Section Twelve. Four stream/river sites will be monitored including the Rice River (2 sites), Ripple River, and Sissabagama Creek. Through this effort we will obtain information that will be useful in assessing the health of this watershed.

Aitkin
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Crow Wing SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

The Crow Wing Soil and Water Conservation District (SWCD) will engage citizen and nonprofit groups to enhance, improve, and protect Crow Wing County (CWC) lakes and rivers. To do this, the SWCD will partner with the University of Minnesota Extension, MN DNR, CWC, nonprofits, and lake associations to implement a mini grant program and provide grant funds to 20 community groups.

Crow Wing
Recipient
Ramsey-Washington Metro WD
2014 Fiscal Year Funding Amount
$200,000
Fund Source

Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.

Ramsey
Recipient
City of Roseville
2013 Fiscal Year Funding Amount
$100,000
Fund Source

The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Saint Cloud, City of
2014 Fiscal Year Funding Amount
$35,507
Fund Source

The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.

Stearns
Recipient
Shingle Creek WMC
2014 Fiscal Year Funding Amount
$200,000
Fund Source

This project is the ecological restoration of 1,400 feet of Shingle Creek, an Impaired Water for low dissolved oxygen and impaired biota, in Brooklyn Center and Brooklyn Park. The Shingle Creek Impaired Biota and Dissolved Oxygen Total Maximum Daily Load requires sediment oxygen demand load reductions and establishes restoration design standards to enhance habitat that will be incorporated into this project.

Hennepin
Recipient
Minnehaha Creek WD
2014 Fiscal Year Funding Amount
$483,000
Fund Source

The Cottageville Park Water Quality Protection and Stream Restoration Project was developed to meet the goals of the Minnehaha Creek Watershed District and the City of Hopkins, including; water resource management, channel stabilization, stream enhancement, riparian corridor improvements, open space creation, park development, and revitalization. The project achieves these goals through implementation of the following:

Hennepin
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Crow Wing County SWCD
2016 Fiscal Year Funding Amount
$48,450
2017 Fiscal Year Funding Amount
$6,326
Fund Source

The project will include lake monitoring on seventeen lakes found in the Mississippi River - Brainerd watershed in East Central Crow Wing County (CWC). The project will be conducted in an effort to gain data on these data-deficient lakes. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP). Surface water assessment monitoring will enable state 303(d) and 305(b) assessments and provide a better understanding of these lakes.

Aitkin
Crow Wing
Recipient
Science Museum of Minnesota-St. Croix Watershed Research Station
2012 Fiscal Year Funding Amount
$149,996
Fund Source

This project will directly inform the Lake of the Woods (LoW )TMDL process by identifying nutrient reduction targets, a timeline of phosphorus loadings to the lake, and measures of historical in-lake variability (e.g., nutrients, biological communities). Results will complement and build on ongoing research efforts on internal loading and sediment core analysis.

Lake of the Woods
Roseau
Recipient
Lake of the Woods Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$31,714
Fund Source

This project will support the collection and analysis of sediment core samples, from each of the five bays ( Little Traverse, Big Traverse, Muskeg, Sabaskong and 4-Mile Bays), to ensure adequate characterization of the P fluxes from deposited sediment and equilibrium P fluxes from re-suspended sediment.

Lake of the Woods
Roseau
Recipient
Lower Mississippi River Watershed Management Organization (LMRWMO)
2012 Fiscal Year Funding Amount
$189,999
2013 Fiscal Year Funding Amount
$29,995
Fund Source

This project will complete a comprehensive study, following a rational, step-wise process of data analysis, response modeling and comparison to the water quality standards, followed by impairment diagnosis, modeling of improvement and protection options, and development of a WRAP Report and Implementation Plan for Sunfish lake, Thompson lake, Pickerel lake, and Rogers lake.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Vadnais Lake Area Watershed Management Organization (VLAWMO)
2010 Fiscal Year Funding Amount
$40,000
Fund Source

The VLAWMO watershed covers approximately 25 square miles in the northeast metropolitan area in northern Ramsey County and a small portion of Anoka County, Minnesota. It encompasses the City of North Oaks and portions of the Cities of White Bear Lake, Gem Lake, Vadnais Heights, Lino Lakes, and White Bear Township. This project will gather and organize existing data, support the continuation of modeling and TMDL allocations along with an additional stakeholder meeting. It will also provide the completion of a draft and final TMDL report.

Anoka
Ramsey
Recipient
Rice Creek Watershed District
2011 Fiscal Year Funding Amount
$86,210
Fund Source

This project will support the design and construction of three rain gardens to intercept and infiltrate stormwater runoff near the Fridley Middle School.

Anoka
Recipient
Laq qui Parle-Yellow Bank Watershed District
2011 Fiscal Year Funding Amount
$141,850
Fund Source

This project will Install buffer strips along 25 miles of ditches in the watershed, replace 50 open tile intakes, and hold workshops in the watershed to increase conservation tillage, nutrient and pesticide management, conservation drainage and restoring wetlands.

Lac qui Parle
Recipient
Coon Creek Watershed District
2011 Fiscal Year Funding Amount
$83,650
Fund Source

This project will reduce nutrient loadings to Sand Creek from the neighborhoods which are the greatest contributors. Project activities include the installation of a new stormwater pond and a network of 10 strategically-placed curb-cut rain gardens.

Anoka
Recipient
Ramsey-Washington Metro WD
2016 Fiscal Year Funding Amount
$150,000
Fund Source

The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary. Permit and voluntary cost share programs serve to slowly redevelop the watershed to the benefit of these water bodies. However, additional projects are needed- not only to implement green infrastructure in areas that need extra restoration and protection, but also to foster new relationships between citizens and the RWMWD to rally together in a common goal to the benefit of their water resources.

Ramsey
Washington
Recipient
City of White Bear Lake
2011 Fiscal Year Funding Amount
$100,000
Fund Source

Varney Lake is owned and maintained by the City of white Bear Lake as part of its stormwater collection system. The City will excavate approximately 10,000 cubic yards of polycyclic aromatic hydrocarbons (PAH) contaminated sediment from Varney Lake (which is located in a residential portion of the City) and manage the sediments on site by encapsulating the sediment in a berm covered with clean top soil. The encapsulated sediment will be managed as a solid waste in what the MPCA refers to as a limited use solid waste landfill (Facility).

Ramsey
Recipient
City of Circle Pines
2011 Fiscal Year Funding Amount
$54,916
Fund Source

This project will remove accumulated sediment from two Stormwater Treatment Ponds in Circle Pines that were constructed in the 1970’s. Recent testing of the sediments indicates that Tier 2 and 3 PAH compounds were found in the sediment. The most recent estimate for the volume of material that will be removed is 2,400 Cubic Yards.

Anoka
Recipient
City of Golden Valley
2011 Fiscal Year Funding Amount
$61,577
Fund Source

The GVCC Pond Excavation Project will remove approximately 2,500 cubic yards of accumulated polycyclic aromatic hydrocarbons (PAH) Level/Tier 3 contaminated sediment from the Golden Valley Country Club stormwater treatment pond.

Hennepin
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$88,590
Fund Source

This project will install an iron enhanced sand filter (IESF) to restore water quality in Golden Lake. Golden Lake is within a fully developed area of the Twin Cities, surrounded by residential land use, and the focal point of a city park. The IESF will achieve 11% of the phosphorus reduction (21 lbs/yr) required for Golden Lake to meet State water quality standards, as identified in the approved Total Maximum Daily Load (TMDL).

Anoka
Recipient
Washington Conservation District
2014 Fiscal Year Funding Amount
$50,000
Fund Source

The Washington Conservation District (WCD) will use this program to engage homeowner associations (HOAs) within Washington County. The project will identify methods and opportunities for HOAs to commit to clean water management practices and prioritize stormwater retrofit projects within partnering HOAs. Project goals include engaging at least 20 HOAs within the county and conducting 2-3 focus group sessions with property management companies and HOAs to identify opportunities for and barriers to adoption of clean water practices.

Washington
Recipient
Lake of the Woods Water Sustainability Foundation
2012 Fiscal Year Funding Amount
$500
2013 Fiscal Year Funding Amount
$500
Fund Source

Co-sponsorship and assistance with a portion of the financial support for the 9th & 10th Annual International Lake of the Woods Water Quality Forum (Forum) to be held on March 7-8, 2012 and March 13-14, 2013 at the Rainy River Community College in International Falls, Minnesota. The Forum will feature the latest information on research conducted by Canadian and U.S. researchers regarding the International Lake of the Woods waters.

Lake of the Woods
Roseau
Recipient
Capitol Region Watershed District
2012 Fiscal Year Funding Amount
$275,000
Fund Source

This project will compile and review previously conducted studies and will prioritize best management practices (BMPs) based on a cost-benefit analysis of their pollutant load reductions and life cycle costs. It will also support the design and construction of BMPs, such as rain gardens and infiltration practices, within the Villa Park subwatershed of the Lake McCarrons watershed.

Ramsey
Recipient
Lake of the Woods Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$47,085
Fund Source
The goal of this project is to determine: 1) temperature and seasonal variations in sediment chemical-textural characteristics (upper 10-cm sediment layer) and rates of P release from sediments; and 2) vertical variations in mobile P concentrations in the sediment column of Big Traverse Bay in order to better understand the role of internal P loading to the P economy of LOW and for the development of the LOW TMDL.
Lake of the Woods
Recipient
Lake of the Woods Water Sustainability Foundation
2015 Fiscal Year Funding Amount
$500
2016 Fiscal Year Funding Amount
$500
2017 Fiscal Year Funding Amount
$500
2018 Fiscal Year Funding Amount
$500
Fund Source

The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
Lake of the Woods Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$39,134
Fund Source

This project will provide monitoring of four of the major watersheds (8-digit Hydrologic Unit Codes) in the western part of the Rainy River Basin. Staff from the Lake of the Woods SWCD will conduct water quality sampling, review, manage and provide collected data to the Minnesota Pollution Control Agency (MPCA).

Beltrami
Itasca
Koochiching
Lake of the Woods
Roseau
Recipient
Rice Creek Watershed District
2010 Fiscal Year Funding Amount
$110,200
Fund Source

This project will repair and upgrade the water control structure and provide water quality enhancement measures on Oasis Pond in Roseville, Minnesota. This project will also protect the quality of downstream receiving waters; specifically Lake Johanna, by reducing phosphorus pollutant loads.

Anoka
Ramsey
Recipient
Ramsey Conservation District
2015 Fiscal Year Funding Amount
$59,766
Fund Source

Past and current monitoring data has shown Ramsey County's Lambert Creek has high levels of total phosphorus (TP), anywhere from 0.14 mg/L to 0.30 mg/L, which is above the proposed State standard of 0.10 mg/L for streams in the Central Region.

Ramsey
Recipient
Crow Wing County
2015 Fiscal Year Funding Amount
$67,300
Fund Source

This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.

Crow Wing
Itasca
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Minneapolis, City of
2015 Fiscal Year Funding Amount
$399,425
Fund Source

This project engages private property owners in a neighborhood scale effort to install up to 180 stormwater Best Management Practice (BMPs) to protect Lake Nokomis, a water body in Minneapolis impaired for excess nutrients. An analysis of the Lake Nokomis subwatershed identified priority areas for BMP installations based on drainage pattern, land uses and presence of previously-constructed BMPs. The project will install 160-180 BMPs adjacent to alleyways to disconnect residential backyards, rooftops and driveways on 15 residential blocks.

Hennepin
Recipient
Bassett Creek WMC
2016 Fiscal Year Funding Amount
$400,000
Fund Source

The Northwood Lake Improvement Project will treat storm water runoff from over 110 acres of currently untreated urban land through a variety of practices at two different locations adjacent to the lake. Northwood Lake is an impoundment of the North Branch of Bassett Creek located in the City of New Hope within the Bassett Creek Watershed Management Commission (BCWMC). Northwood Lake is a shallow lake with a fully developed watershed of 1,341 acres that provides very little stormwater treatment.

Hennepin
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$517,780
Fund Source

This Oak Glen Creek stormwater pond expansion and enhancement using an iron enhanced sand filter (IESF) is a partnership between the Anoka Conservation District (ACD) and a private company to protect a downstream corridor stabilization and improve the quality of stormwater discharged to the Mississippi River. Very little stormwater infrastructure currently exists in the 573 acre Oak Glen Creek subwatershed, and it discharges 147,519 pounds of sediment and 353 pounds of phosphorus to the Mississippi River annually.

Anoka
Recipient
Ramsey Conservation District
2014 Fiscal Year Funding Amount
$150,000
Fund Source

Ramsey County has 3,500+ acres tied to 358 faith organizations and 304 schools. On average, these properties contribute 1 billion gallons of stormwater runoff, 3,000 lbs of phosphorus, and 1,000 tons of sediment to our local water bodies. The Ramsey Conservation District (RCD), working with community partners and Watershed Districts/Water Management Organizations, will install 6-12 stormwater best management projects that will help protect and improve water quality of surrounding lakes.

Ramsey
Recipient
Ramsey-Washington Metro Watershed District
2011 Fiscal Year Funding Amount
$121,000
2012 Fiscal Year Funding Amount
$224,860
Fund Source

This project will provide the Minnesota Pollution Control Agency and Ramsey-Washington Metro Watershed District the information and tools necessary to improve water quality in Battle Creek Lake, Beaver Lake, Carver Lake, Keller Lake and Wakefield Lake through targeted phosphorus reduction activities in the watershed.

Ramsey
Recipient
Ramsey-Washington Metro Watershed District
2015 Fiscal Year Funding Amount
$47,668
Fund Source

The goal of the project is to create a complete Watershed Restoration and Protection Strategy (WRAPS) report for the Ramsey-Washington Metro Watershed District for inclusion into an updated Watershed Management Plan, including completion of a watershed-wide Total Maximum Daily Load (TMDL) report sufficient for EPA approval.

Ramsey
Washington
Recipient
Capitol Region WD
2014 Fiscal Year Funding Amount
$360,000
Fund Source

Capitol Region Watershed District (CRWD), in partnership with the City of Roseville, will construct a volume reduction/capture-reuse irrigation facility below the Upper Villa Park Softball field in the City of Roseville. This project will protect Lake McCarrons and the Villa Park Wetland System (VPWS) by reducing runoff volumes and the pollutants associated with urban stormwater such as Total Phosphorus (TP), Total Suspended Solids (TSS), heavy metals, and petroleum products among others.

Ramsey