Minnesota's Legacy

All Projects

Showing 1 - 6 of 6 | Export projects
Recipient
Emmons and Olivier Resources, Inc
2018 Fiscal Year Funding Amount
$17,448
Fund Source

Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.

Koochiching
Recipient
St. Croix Watershed Research Station
2015 Fiscal Year Funding Amount
$38,795
2017 Fiscal Year Funding Amount
$4,647
Fund Source

The primary goal of this project is to analyze of dated sediment cores to reconstruct changes in the lake condition over the last 150 years. This will be done using multiple lines of evidence including biogeochemistry, sediment accumulation, and diatom and algal remains as biological indicators.

Koochiching
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$99,991
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using the Hydrological Simulation Program FORTRAN (HSPF) model for the Upper/Lower Red Lake Watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Beltrami
Clearwater
Itasca
Koochiching
Recipient
Red River Watershed Management Board
2010 Fiscal Year Funding Amount
$346,000
Fund Source

This project will develop an effective transferable model to engage and educate watershed residents, stakeholders and others to better understand and protect watershed ecostystems through environmental monitoring, training, and formal and informal education programs in their local watershed. The project will build on the foundation of the existing Red River Basin River Watch program by strengthening three main activity areas: 1) curriculum integration and teacher training, 2) youth leadership and civic engagement, and 3) applied research collaboration and watershed science skills building.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Itasca
Kittson
Koochiching
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red Lake DNR
2018 Fiscal Year Funding Amount
$49,967
Fund Source

The purpose of this project is to gather data specific to developing a site-specific standard for phosphorus for Upper and Lower Red Lakes. These are large shallow lakes that are located in an area where no shallow lake standard exists. Because of these lakes' unique characteristics, it is believed that a site-specific standard is more appropriate than the deep lake standards that currently exist. This project will include additional chemistry and flow monitoring of tributaries to the lakes, as well as outflow of Lower Red Lake to the Red Lake River.

Beltrami
Koochiching
Recipient
Red Lake Department of Natural Resources
2015 Fiscal Year Funding Amount
$121,943
2017 Fiscal Year Funding Amount
$184,960
Fund Source

The goal of this project is to gather and collect necessary watershed data for the development of a Watershed Restoration and Protection Strategy (WRAPS) for the Upper/Lower Red Lakes Watershed that includes impairments, their causes, and plans for restoration. Implementation of the WRAPS will maintain or improve water quality for the watershed.

Beltrami
Clearwater
Itasca
Koochiching