Minnesota's Legacy

All Projects

Showing 1 - 40 of 48 | Export projects
Recipient
Zumbro Watershed Partnership Inc.
2013 Fiscal Year Funding Amount
$81,122
Fund Source

The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
Aitkin County SWCD
2013 Fiscal Year Funding Amount
$5,973
Fund Source

The goal of the project is to complete the dataset for the assessment of Aquatic Recreation Use in Cedar Lake by monitoring total phosphorus, chlorophyll-a, and secchi depth.

Aitkin
Recipient
Zumbro Watershed Partnership
2016 Fiscal Year Funding Amount
$57,975
Fund Source

The Zumbro River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Zumbro Watershed Partnership (ZWP) along with Olmsted County Environmental Services will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations of four sub-watershed sites. Approximately 50 grab samples per site (total of 200) between ice-out and October 31 of 2016 and 2017 will be collected along with field measurements and observations.

Olmsted
Wabasha
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Buffalo-Red Rivers Watershed District
2019 Fiscal Year Funding Amount
$38,835
Fund Source

This Surface Water Assessment Grant (SWAG) project is intended to supplement the 2019-2020 Intensive Watershed Monitoring (IWM) process for the Buffalo and Upper Red River of the North watersheds. Nine sites will provide water chemistry and river eutrophication data to the IWM. Monitoring sites were requested by the Buffalo - Red River Watershed District (BRRWD) and the Minnesota Pollution Control Agency (MPCA).

Becker
Clay
Wilkin
Recipient
Crow Wing Soil and Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$14,987
Fund Source

The project will include lake monitoring on three (3) lakes found in the Rum River watershed in southeastern Crow Wing County (CWC). The project will be conducted in an effort to gain sufficient data on these data-deficient lake sites. All of the proposed monitoring sites are target sites for 2013-2014. One of the goals of the CWC Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Buffalo-Red River Watershed District
2011 Fiscal Year Funding Amount
$249,968
Fund Source

The Buffalo River Watershed Pilot Project is one of two pilots in Minnesota designed to develop a watershed approach for managing Minnesota’s surface waters. The goal of this project is to develop a plan that will guide surface water quality management throughout the watershed.

Becker
Clay
Otter Tail
Wilkin
Recipient
South St. Louis County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$283,224
Fund Source

This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.

Carlton
Lake
St. Louis
Recipient
University of Minnesota
2019 Fiscal Year Funding Amount
$116,081
Fund Source

This project continues the total maximum daily load (TMDL) and watershed restoration and protection strategies (WRAPS) process for the Duluth Metropolitan Area (DMA).  The DMA is defined by water, sitting at the juncture of Lake Superior and the St. Louis River Estuary, and surrounded by semi-mountainous terrain. The project serves as a bridge into the next phase of restoration and protection identified by the Duluth Urban Stream TMDLs and WRAPS. In the first phase of community engagement, a collaborating organization was formed to define a framework for the DMA communities.

St. Louis
Recipient
Regents of the University of Minnesota
2016 Fiscal Year Funding Amount
$135,061
2018 Fiscal Year Funding Amount
$49,040
2019 Fiscal Year Funding Amount
$34,240
Fund Source

Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) requests assistance from local partners to collect samples and field data at designated stream monitoring sites for the purpose of assessing water quality and calculating annual pollutant loads.

Lake
St. Louis
Recipient
Lake County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$225,000
Fund Source

This project will gather watershed data necessary for the development of a comprehensive watershed management plan with parameter-specific thresholds that will maintain or improve water quality for the Kawishiwi Watershed.

Cook
Lake
St. Louis
Recipient
Lake County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$83,000
Fund Source
The main purpose of this project is to provide fiscal resources for Lake County Soil and Water Conservation District (Lake County SWCD) to be engaged and participate in efforts for civic engagement in the Lake Superior South (LS South) Lake Superior North (LS North) watersheds and lead and carry-out civic engagement in the early stages of the Watershed Restoration and Protection Strategies (WRAPS) process in the Cloquet River watershed.
Lake
Recipient
Lake County SWCD
2017 Fiscal Year Funding Amount
$7,500
Fund Source

This project will develop, implement, and evaluate civic engagement activities within the Rainy River Headwaters and Cloquet watersheds. In addition, Lake County will also assist in expanding water quality monitoring efforts in support of the Watershed Restoration and Protection Strategy (WRAPS) process.

Lake
St. Louis
Recipient
South St Louis Soil & Water Conservation District
2019 Fiscal Year Funding Amount
$146,000
Fund Source

The purpose of this contract is to augment data collection efforts for the St. Louis River (SLR) Watershed Restoration and Protection Strategy (WRAPS) and for four impaired Duluth beaches. For the SLR WRAPS, activities include: attaining datasets for watershed stressors and geomorphic conditions, water quality gap monitoring, and a civic engagement component. Impaired beaches activities include: collection of field observational data, field water chemistry, and water quality samples for analytical analysis.

St. Louis
Recipient
U.S. Army Corps of Engineers (USACE)
2012 Fiscal Year Funding Amount
$163,100
Fund Source

This project will provide a protocol for prioritizing sites in the St. Louis Area of Concern (AOC ) for restoration based on site-specific bioavailability considerations. Despite large data collection efforts focused on sediment chemistry, the extent to which sediment with moderate levels of contamination is available for uptake into biota and therefore contributing to Beneficial Use Impairments (BUI)s is still largely unknown.

St. Louis
Lake
Carlton
Recipient
U.S. Environmental Protection Agency, Great Lakes Restoration Initiative (USEPA-GLRI)
2013 Fiscal Year Funding Amount
$219,668
Fund Source

The St. Louis River Area of Concern (SLRAOC) conservation partners are focused on removing Beneficial Use Impairments (BUI) in the estuary and eventually delisting the SLRAOC. Cooperative efforts between multiple resource agencies and regional stakeholders have identified a host of restoration objectives, developed project support activities, and partially secured funding that includes a state commitment through the Minnesota Clean Water Fund.

Carlton
Lake
St. Louis
Recipient
U.S. Environmental Protection Agency, Great Lakes Restoration Initiative (USEPA-GLRI)
2013 Fiscal Year Funding Amount
$1,112,252
Fund Source

The St. Louis River Area of Concern (SLRAOC) conservation partners are focused on removing Beneficial Use Impairments (BUI) in the estuary and eventually delisting the SLRAOC. Cooperative efforts between multiple resource agencies and regional stakeholders have identified a host of restoration objectives, developed project support activities, and partially secured funding that includes a state commitment through the Minnesota Clean Water Fund.

Carlton
Lake
St. Louis
Recipient
Metropolitan Council Environmental Services
2018 Fiscal Year Funding Amount
$176,657
2019 Fiscal Year Funding Amount
$123,343
Fund Source

The Minnesota Pollution Control Agency’s (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) forms the core of a long-term program designed to measure and compare regional differences and trends in pollutant loadings from Minnesota’s mainstem rivers and the outlets of major watersheds and subwatersheds draining to these rivers.

Hennepin
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
North St. Louis County Soil and Water Conservation District
2015 Fiscal Year Funding Amount
$129,551
Fund Source

This project will collect water quality data for 31 sites (22 lakes and 9 stream sites) within the Rainy River Headwaters, Cloquet, and Vermilion major watersheds as part of the 10-year cycle for monitoring Minnesota's waters. Due to the large number and geographic extent of monitoring sites, North St. Louis SWCD (NSLSWCD) is subcontracting with Lake County SWCD and Koochiching County SWCD. An intern from the Vermilion Community College (VCC) Water Resources Program will be hired to conduct monitoring of 4 stream sites and 3 lake sites located between Ely and Virginia.

St. Louis
Recipient
North St. Louis River Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$83,141
Fund Source

This St. Louis River Watershed assessment will include the waters of Dempsey Creek, West Two River, St. Louis River, Mud Hen Creek, Embarrass River, West Swan River, Partridge River, Barber Creek, East Swan River, Helen Lake, Pine Lake, Cadotte Lake, Colby Lake, Loon Lake, St. James Pit, Strand Lake, Nichols Lake, Ely Lake, Silver Lake, Elbow Lake, Mashkenode Lake, Carey Lake and Island Lake. These lakes and streams are found throughout the St. Louis River Watershed, which spans parts of St. Louis and Itasca Counties.

Itasca
St. Louis
Recipient
University of Minnesota Natural Resources Research Institute
2014 Fiscal Year Funding Amount
$298,787
Fund Source

Minnesota Clean Water Funds will be used to complete a paleolimological study of the St. Louis River Estuary for the purpose of providing information critical to removing Beneficial Use Impairments in the St. Louis River Area of Concern.  This project will reconstruct the biological (algal load and composition), geochemical (organic and inorganic), sediment, and mercury chronology to identify historical temporal and spatial variations in the St. Louis River Estuary in order to better understand the natural and anthropogenic drivers related to beneficial use impairments for the St.

St. Louis
Recipient
Lake County Soil and Water Conservation District
2016 Fiscal Year Funding Amount
$195,000
Fund Source

This project will meet the following goals: develop, implement, and evaluate the impacts civic engagement outcomes for the Rainy River Headwaters and the Cloquet watersheds; create a citizen understanding of the Watershed Restoration & Protection Strategy (WRAPS) process and the role that citizens, lake associations, institutions of higher education, and other stakeholders can play in attaining water quality restoration and protection; provide opportunities for citizens and stakeholders to assist local partners and state agencies in developing priorities for projects to accomplish resto

Cook
Lake
St. Louis
Recipient
US Geological Survey
2019 Fiscal Year Funding Amount
$12,880
Fund Source

US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.

Clay
Polk
Recipient
Red River Watershed Management Board
2014 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2015 Fiscal Year Funding Amount
$100,000
Fund Source

The goal of this project is to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Buffalo-Red River Watershed District
2016 Fiscal Year Funding Amount
$19,860
Fund Source

The purpose of this project is to improve understanding of primary productivity in the Red River and the diversity and population structure of the algal communities occurring along the river system. This will be accomplished through taxonomic identification of periphyton and phytoplankton assemblages necessary for characterizing responses to nutrient gradients along the Red River of the North.

Becker
Beltrami
Clay
Clearwater
Douglas
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Pope
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
US Geological Survey
2017 Fiscal Year Funding Amount
$12,520
Fund Source

The goal of this project is to collect real-time, parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity, and stream flow at the United States Geological Survey (USGS) gaging stations located at Fargo and Grand Forks, ND on the Red River of the North. The data will be published on the USGS National Water Information System (NWIS) website.

Clay
Polk
Recipient
International Water Institute
2012 Fiscal Year Funding Amount
$272,267
2014 Fiscal Year Funding Amount
$359,367
Fund Source

International Water Institute (IWI) staff will monitor 24 sites in the Bois de Sioux, Mustinka (2 sites), Buffalo (8 sites), Red Lake (4 sites), Sandhill (3 sites), Thief (2 sites), and Tamarac River (3 sites) Watersheds intensively over a 2 year period in an attempt to collect 25 samples per year at each site. If conditions allow for the collection of all planned samples, 1200 stream samples will be collected over the time period. Monitoring will include field measurements, observations, and at least three photographs during each site visit.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Red River Watershed Management Board
2012 Fiscal Year Funding Amount
$200,000
Fund Source

MN Legislative Clean Water Fund funding to engage citizens in local watershed monitoring, work with regional partners to promote understanding and protection of watersheds, and organize and facilitate gathering of scientific data all for the benefit of water quality in the Red River Basin.

Becker
Beltrami
Big Stone
Clay
Clearwater
Grant
Kittson
Lake of the Woods
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Stevens
Traverse
Wilkin
Recipient
Anoka Conservation District
2013 Fiscal Year Funding Amount
$280,000
Fund Source

This project will gather watershed data necessary for the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality in the Rum River Watershed. Local Partners will lead various portions of this project and a hired onsultant will be subcontracted to write selected TMDL protection plans.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Anoka Conservation District
2016 Fiscal Year Funding Amount
$75,000
Fund Source

This project will focus on Watershed Restoration and Protetion Strategy (WRAPS) and Total Maximum Daily Load (TMDL) report development for the Rum River Watershed, which includes Mille Lacs Lake (the second largest lake in Minnesota) and the Rum River of which Mille Lacs Lake is the headwaters. The project will produce a plan that partners and citizens will be able to implement, a framework for citizen engagement, and a set of watershed management activities that will achieve water quality standards for all impairments within the watershed.

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Mille Lacs Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$18,283
Fund Source

The Mille Lacs Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations at two sites in the Rum River Watershed. Approximately 20-25 grab samples per site between ice-out and October 31, 2019 will be collected along with field measurements and observations. Samples will be collected using procedures described in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance (SOPG).

Mille Lacs
Recipient
Mille Lacs Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$111,111
Fund Source

The purpose of the project is to collect data to represent the ambient condition of the lakes and streams of the Rum River Watershed within Mille Lacs, Isanti and Sherburne Counties that is needed to determine if thresholds set to protect designeated uses, such as aquatic recreation and aquatic life, are being met .

Aitkin
Anoka
Benton
Chisago
Crow Wing
Isanti
Kanabec
Mille Lacs
Morrison
Sherburne
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$170,601
Fund Source

The objective of this sampling plan is to quantify the inputs and outputs of methyl-mercury in the St. Louis River. Mercury can be bound to organic carbon or suspended solids; therefore, it is necessary to determine loadings of them as well. To get loadings, this sampling plan includes event and base flow monitoring at key tributaries to the St. Louis River and at stations within the St. Louis River.

Aitkin
Carlton
Lake
St. Louis
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$3,903
2014 Fiscal Year Funding Amount
$4,846
Fund Source

The goal of this project is to provide drilling services for the Sentinel Lakes Groundwater/Surface Water Interaction Network. The three new wells will be used for monitoring the interaction between groundwater and surface water in Lakes Shaokatan and Bear Head. Groundwater/lake water interactions are not well understood, and in order to produce accurate and useful Total Maximum Daily Load watershed investigations and impairment remediations, the MPCA must understand how groundwater affects lake water quality.

Lincoln
St. Louis