Minnesota's Legacy

All Projects

Showing 1 - 40 of 56 | Export projects
Recipient
Pennington SWCD
2014 Fiscal Year Funding Amount
$91,300
Fund Source

The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.

Pennington
Recipient
Freeborn County
2015 Fiscal Year Funding Amount
$494,500
Fund Source

The City of Myrtle is an unsewered community in Freeborn County. Thirty-one of thirty-two properties are connected to a community straight pipe, which discharges raw sewage into Deer Creek, a tributary of the Cedar River and are classified as an imminent threat to public health (ITPHS). This project will provide cost-share assistance to 28 low income property owners, who are connected to the City of Myrtle community straight pipe, for construction of individual subsurface sewage treatment systems.

Freeborn
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$277,500
Fund Source

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.

Red Lake
Recipient
Faribault County SWCD
2015 Fiscal Year Funding Amount
$110,000
Fund Source

The Faribault Soil and Water Conservation District will provide mini-grants to conservation-conscious community organizations who voluntarily construct best management practices that provide storage and treatment of stormwater runoff at its source.

Faribault
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Red Lake
Recipient
Freeborn SWCD
2016 Fiscal Year Funding Amount
$32,500
Fund Source

County Ditch #8 (CD8) has been identified as an area of high erosion by the Freeborn County Drainage Authority and the Turtle Creek Watershed district. Project entails using conservation BMPs such as water and sediment control basins, grassed waterways, and alternative tile intakes to address gully and sheet and rill erosion concerns at the headwaters of CD8.

Freeborn
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Red Lake
Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Red Lake
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
Cedar River WD
2016 Fiscal Year Funding Amount
$598,000
Fund Source

The Cedar River Watershed District was established in 2007 to identify and fix the water quality impairments in the Cedar River. After several years of monitoring and modeling, the district has developed the requisite background data to drill down on the 25 most crucial areas for targeted treatment. In 2015, a Capitol Improvement Plan was developed to prioritize and rank the most critical projects within the priority list. The District is requesting Clean Water Funding to implement the highest ranking projects, which are shovel ready for timely construction.

Mower
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
Turtle Creek WD
2014 Fiscal Year Funding Amount
$35,625
Fund Source

In the battle to make real progress in sediment reduction to Turtle Creek, buffer strips are on the defensive front lines, holding the land at its most critical point. Grass strips along waterways have long provided a catchment area for agricultural field runoff. The Conservation Reserve Program (CRP) has developed guidance and performance standards that utilize the maximum amount of benefit when installed through that program. In recent years, the Turtle Creek Watershed residents have faced a difficult decision over whether or not to incorporate grass buffers on their farms.

Freeborn
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Cedar River Watershed District
2011 Fiscal Year Funding Amount
$163,596
Fund Source

In the summer of 2011, conservation practices were installed in the upper reaches of Dobbins Creek to stabilize eroding stream banks. We contracted with the non-profit Minnesota Conservation Corps to assist with the labor. The crew worked efficiently, the weather cooperated perfectly, and the project came together exactly as planned. The banks of Dobbins Creek were armored with native cedar trees and anchored to the banks. Once the project was complete, we cut the side slopes back to reduce future erosion in the newly protected banks.

Recipient
Dodge SWCD
2016 Fiscal Year Funding Amount
$50,625
Fund Source

Nitrogen is a serious problem in Minnesota's Mississippi River Basin and the Dodge Soil and Water Conservation District (SWCD) will address this problem through saturated buffers. Nitrates have been linked to adverse health effects, and nitrogen is the leading cause of the dead zone in the Gulf of Mexico. Agriculture drainage through the use of tile drainage systems have been identified as the number one leading source of nitrogen in the Mississippi River Basin.

Dodge
Recipient
Pennington SWCD
2017 Fiscal Year Funding Amount
$332,749
Fund Source

Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.

Pennington
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Ag Resource Strategies, LLC
2010 Fiscal Year Funding Amount
$300,000
Fund Source

LEQA is a Minnesota Department of Agriculture (MDA) program to help livestock producers address, using a non-regulatory approach, the unique water quality issues on their farms. The MDA has contracted with Ag Resource Strategies, LLC, to recruit farmers to enroll in the LEQA program. The company trains technicians to assess different areas of each farms, such as the farmstead, livestock facilities, fields and wooded areas. The technicians then develop an environmental assessment and identify financial assistance for these projects.

Recipient
Mower SWCD
2014 Fiscal Year Funding Amount
$30,000
Fund Source

Ninety percent of the land in Mower County is used for agriculture. The County ranks 10th and 13th in the State for corn and bean production, making much of the land vulnerable to erosion due to the planting of row crop. As a result, streams and ditches in the county see high sediment loads.

Mower
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Greater Blue Earth River Basin Alliance
2017 Fiscal Year Funding Amount
$301,200
Fund Source

The Greater Blue Earth River Basin Alliance (GBERBA) along with Soil and Water Conservation Districts, Counties, landowners, and drainage authorities in the ten member counties will install conservation drainage practices to improve water quality. 103E drainage systems with documented sediment or water quality issues are the focus with the goal of installing 52 practices such as improved side inlets (grade stabilization structures), alternative tile inlets, denitrifying bioreactors, saturated buffers, storage wetlands and others.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$10,800
2013 Fiscal Year Funding Amount
$11,119
Fund Source

This project will collect real-time parameter data for specific conductance, water temperature, pH, dissolved oxygen, turbidity and stream flow at the United States geological Survey (USGS) gaging stations located at Fargo, ND and Grand Forks, ND on the Red River of the North; and publish the data both on the USGS NWIS website and in the USGS Annual Report.

Beltrami
Clay
Clearwater
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Wilkin
Recipient
US Geological Survey
2019 Fiscal Year Funding Amount
$12,880
Fund Source

US Geological Survey (USGS) will perform real-time water quality monitoring at its stations located in Fargo and Grand Forks. The Minnesota Pollution Control Agency co-sponsors this work along with USGS, North Dakota Dept. of Health, the cities of Fargo, Moorhead, Grand Forks, and East Grand Forks.

Clay
Polk
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Red Lake WD
2015 Fiscal Year Funding Amount
$38,700
Fund Source

The Red Lake Watershed District will create an inspection database for 103E ditches under their drainage authority. The district will acquire a database software solution to conduct field inspections and to track ditch maintenance projects and use the software to facilitate compliance with state statutes. The project will also develop a process for completing the annual inspection and reporting requirements under Statue 103E.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Polk, West SWCD
2017 Fiscal Year Funding Amount
$103,000
Fund Source

The purpose of the project is to reduce the amount of sediment entering Burnham Creek, which is a tributary of the Red Lake River within the Red River Basin. The Red Lake River is classified as a source water protection area for the City of East Grand Forks and currently does not meet state water quality standards for sediment. The goal of this project is to install one grade stabilization structure within the channel which outlets into the Burnham Creek channel and two side water inlets with buffers.

Polk