Minnesota's Legacy

All Projects

Showing 1 - 40 of 119 | Export projects
Recipient
Chisago SWCD
2015 Fiscal Year Funding Amount
$30,000
Fund Source

The Chisago Soil and Water Conservation District has been successful in implementing Best Management Practices in certain targeted locations within the county, including the prioritized and assessed areas of Chisago City, Lindstrom, and Center City. However, there are many areas that want to implement conservation projects but aren't within targeted areas. This award will empower community partners, especially lake associations, to award grants for rain gardens, shoreline buffers, and other worthwhile projects to improve water quality.

Chisago
Recipient
Chisago SWCD
2016 Fiscal Year Funding Amount
$220,500
Fund Source

The Chisago Soil and Water Conservation District (SWCD) has had such great success implementing gully stabilization projects along the St. Croix River escarpment that all of the current grant funding has been encumbered towards projects. Two large gully projects, one in the City of Taylors Falls and a second nearby in Interstate State Park, are lined up and ready to go as soon as funding is secured. Both of these gullies are large and have been actively eroding for many years, depositing large loads of sediment and phosphorus directly into the St. Croix River.

Chisago
Recipient
Widseth Smtih Nolting
2014 Fiscal Year Funding Amount
$116,042
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Statewide
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Widseth Smtih Nolting
2015 Fiscal Year Funding Amount
$74,429
Fund Source

Widseth Smith Nolting (WSN) will evaluate and recommend to Minnesota Pollution Control Agency (MPCA) groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration.

Statewide
Recipient
Minnesota Department of Agriclture and MN.IT Services
2015 Fiscal Year Funding Amount
$82,400
Fund Source

The Application Risk Advisory System is web‑based and provides alerts when conditions are favorable for nutrient loss to water, based on soil conditions and National Weather Service forecast models. This system enables farmers and commercial applicators to avoid applications of fertilizer and manure during conditions when the potential for loss to surface water is high.

Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$109,878
Fund Source

The goal of this project is to develop statewide biological criteria for managing the state’s water resources, in keeping with the federal Clean Water Act. The MPCA is using the Biological Condition Gradient (BCG) for this development. The BCG is a conceptual model that describes changes in aquatic ecosystems on a gradient of increasing anthropogenic stress.

Statewide
Recipient
Rhithron Associates
2015 Fiscal Year Funding Amount
$155,860
Fund Source

The purpose of this project is to provide stream and large river macro invertebrate sample processing and identification for the Minnesota Pollution Control agency (MPCA) Biological Monitoring Unit.

The final product will consist of; data submitted electronically to the MPCA, project reference specification, return of all identified specimens, and an external and internal QA/QC report.

Statewide
Recipient
Comfort Lake-Forest Lake WD
2014 Fiscal Year Funding Amount
$360,750
Fund Source

This project will focus, on a sub-regional scale, on water quality improvements targeted at concentrated runoff flows generated from upstream, developed portions of the City of Forest Lake. This project will work to modify an existing wetland complex located in publicly owned Bixby Park of Forest Lake to increase water quality treatment potential and storage capacity. The project will also incorporate an innovative iron-enhanced sand filter which will remove dissolved phosphorus, resulting in a 206 pound/year reduction of phosphorous and a 27 tons/year removal of sediment.

Washington
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$14,142
Fund Source

This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Washington Conservation District
2010 Fiscal Year Funding Amount
$103,598
Fund Source

Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Ramsey-Washington Metro WD
2014 Fiscal Year Funding Amount
$200,000
Fund Source

Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.

Ramsey
Recipient
Cass County Environmental Services Department
2010 Fiscal Year Funding Amount
$198,971
Fund Source

This monitoring project includes lake and stream monitoring and encompasses all of Cass County, and surrounding counties. The project will obtain water quality data for streams; in 2009, lakeshed assessments indicated that many surface waters throughout the county were data deficient. This project will address the need for sufficient data on a county-wide basis and fulfill the State’s intensive watershed monitoring program goals by obtaining water quality data at targeted lake and stream sites.

Aitkin
Becker
Beltrami
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Itasca
Morrison
Otter Tail
St. Louis
Todd
Wadena
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Chisago SWCD
2014 Fiscal Year Funding Amount
$250,000
Fund Source

In 2010, Legislation allocated Clean Water Fund (CWF) dollars to the Anoka Conservation District to initiate an 11 county metro subwatershed assessment program. The purpose of subwatershed assessments is to improve water quality, increase groundwater recharge and reduce runoff volumes. These goals are achieved by identifying opportunities in the subwatersheds most contributing to the degradation of the high priority water bodies and developing designs for Best Management Practices (BMPs) that treat stormwater runoff.

Chisago
Recipient
Axys Analytical Services, Ltd.
2015 Fiscal Year Funding Amount
$140,535
Fund Source

This study will test groundwater and drain tile waters at concentrated animal feedlot opperations (CAFOs) to evaluate the presence of intibiotics and hormones. Samples will be collected from monitoring wells, tile drain sumps, and tile line discharges.

Water samples will be sent to Axys Analytical Services as they are colleced from each monitoring site. A total of 18 samples will be generated in the field by pumping ultrapure water through the sampling system.

Statewide
Recipient
University of Minnesota Office of Sponsored Projects Administration (SPA)
2015 Fiscal Year Funding Amount
$145,000
2014 Fiscal Year Funding Amount
$145,000
Fund Source

The goal of this project is to develop a core team of wastewater professionals and academics engaged in understanding and solving wastewater-related problems in Minnesota, with national relevance. The team will promote the use of new technology, designs and practices to address existing and emerging wastewater treatement challenges, including the treatement of wastewater for reuse and the emergence of new and unregulated contaminants.

Statewide
Recipient
Anoka CD
2014 Fiscal Year Funding Amount
$42,987
Fund Source

This project will install new stormwater treatment practices in neighborhoods directly draining to Coon Lake. The objective is to remove phosphorus, which fuels algae growth, before the water is discharged into the lake. Seventeen potential project sites have been identified and ranked and include curb-cut rain gardens, swales, stabilizing stormwater discharge points, and a basin outlet modification.

Anoka
Recipient
Minnesota Department of Health (MDH)
2012 Fiscal Year Funding Amount
$303,000
2013 Fiscal Year Funding Amount
$365,000
2014 Fiscal Year Funding Amount
$390,000
2015 Fiscal Year Funding Amount
$390,000
Fund Source

The County Well Index (CWI) contains well and boring records wells within Minnesota; over 400,000 records. It is the principal source of well construction information and geologic interpretations of well records and also contains soil boring records, mineral exploration test hole records, and scientific/research test hole records.

Statewide
Recipient
Chisago SWCD
2014 Fiscal Year Funding Amount
$117,000
Fund Source

In 2011, the Chisago Soil and Water Conservation District (SWCD) received a Clean Water Fund (CWF) grant to inventory active gully erosion sites along the St. Croix River from the Wild River State Park entrance south to the Chisago/Washington county line. This inventory is now being used to contact landowners with active and severe gully erosion to begin the process of developing a plan correct the problems using Best Management Practices (BMPs).

Chisago
Recipient
Randy S. Ferrin
2011 Fiscal Year Funding Amount
$4,997
Fund Source

The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Chisago County
2012 Fiscal Year Funding Amount
$5,651
Fund Source

Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$94,683
Fund Source

This project will complete a Watershed Restoration and Protection Plan for the Lower St. Croix River that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, and that are understood and adoptable by local units of government and other stakeholders.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Chisago County Soil & Water Conservation District
2013 Fiscal Year Funding Amount
$38,853
Fund Source

This project will support the development of whole farm conservation plans for ten (10) agricultural producers within the Sunrise River Watershed. The conservation plans will be used by the farmer and the Chisago SWCD to develop an action plan to address the resource concerns identified as part of the AgEQA program. The overall goal of the program is to prioritize conservation practices that will improve the overall water quality of the Sunrise River.

Anoka
Chisago
Isanti
Washington
Recipient
St. Croix Watershed Research Station (Science Museum of MN)
2013 Fiscal Year Funding Amount
$425,000
Fund Source

This project will improve our understanding of the sources of sediment (turbidity), and the processes which deliver sediment to river channels. This project will address a suite of emerging questions regarding contributions and causes of non-field sediment, thereby providing watershed managers with a better understanding of how to manage these sediment sources.

Statewide
Recipient
Kanabec Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$31,398
Fund Source

This project will develop and organize a first- stage civic infrastructure pilot in Kanabec County, within the membership of the PICKM (Pine, Isanti, Chisago, Kanabec, and Mille-Lacs) Alliance, and with other organizations in the St. Croix Basin. The work will be grounded in the need for sustainable citizen engagement in water quality management. Civic leaders participating in this project will build their own skills for organizing people and working in partnership with Kanabec County SWCD staff and the St. Croix Basin Team to achieve water quality goals.

Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Stantec Consulting Services, Inc.
2013 Fiscal Year Funding Amount
$33,396
Fund Source

This project will provide a shared working definition and principles for civic engagement, that enable state agencies to more effectively, strategically and collaboratively manage the social dimension of Minnesota’s water resource management efforts . The agencies included in the project are BWSR, MDNR, MDA, MDH and MPCA. The consultant and project participants will develop recommendations that will better enable policy and decision makers, CWF teams, the Clean Water Council and others to make informed decisions surrounding civic engagement efforts.

Statewide
Recipient
University of Minnesota
2013 Fiscal Year Funding Amount
$2,500
Fund Source

This project provides funding for the 2013 Watershed Research Symposium. The outcome will be a set of research foci for Clean Water Fund projects developed by the scientific community.

Statewide
Recipient
Chisago Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$196,600
Fund Source

TMDL project in the Chisago Lakes Lake Improvement District that will develop a watershed based plan and provide strategies for water quality and aquatic ecosystem management, restoration, and protection within Sunrise River Watershed. This project will also aid in understanding the Phosphorus loading to Lake St. Croix.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Kanabec Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$201,992
Fund Source

This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.

Anoka
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Washington
Recipient
Carnelian-Marine-St. Croix Watershed District
2013 Fiscal Year Funding Amount
$132,000
Fund Source

Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
US Geological Survey
2016 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The Minnesota Pollution Control Agency (MPCA) has identified streamflow alteration as a key stressor on aquatic life, but the characteristics of streamflow alteration acting as stressors have not been identified in the MPCA Watershed Restoration and Protection Strategy (WRAPS) process. Without indices that characterize streamflow alteration, the MPCA cannot quantitatively associate metrics of aquatic life condition to streamflow alteration. The lack of quantifiable indices limits the ability of the MPCA to assess environmental streamflow needs for streams and rivers throughout Minnesota.

Statewide
Recipient
Tech Sales Co.
2015 Fiscal Year Funding Amount
$2,000
Fund Source
This training will be for State employees who have purchased this new type of discharge measuring equipment. This training is needed to ensure that accurate and complete discharge measurements are made which is supplied to Minnesota Department of Natural Resources (DNR), Consulting firms, Local units of government, federal government and Minnesota Pollution Control Agency (MPCA) modelers.
Statewide
Recipient
United States Geological Survey (USGS)
2012 Fiscal Year Funding Amount
$55,157
2013 Fiscal Year Funding Amount
$380,930
2014 Fiscal Year Funding Amount
$18,060
Fund Source

This project will determine the magnitude and frequency of contamination from endocrine active compounds (EAC's) and other contaminants of emerging concern in shallow groundwater in non-agricultural areas of Minnesota. EACs and other contaminants of emerging concern in this study include compounds typically found in waste water, including, pharmaceutical compounds, antibiotics, and hormones. This project supports the third phase, including laboratory analysis of samples for an additional 80 wells to be sampled by MPCA staff.

Statewide
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,981
Fund Source

The contractor will add more functionality to HSPEXP+ Hydrological Simulation Program FORTRAN (HSPF) tool and conduct 2016 HSPF Modeling Contractors Meeting

Statewide
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$42,152
Fund Source

The goal of this project is to enhance the current version of the Enhanced Expert System for Calibration of HSPF (HSPEXP+) so that it can more easily and quickly be used for hydrology calibration, water quality calibration, generate reports and graphs.

Statewide
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$99,955
Fund Source

The primary goal of this project is to enhance the current version of the Expert System for Calibration of HSPF (HSPEXP+) so that it can better support hydrology calibration, water quality calibration, report and graph generation. A secondary goal of this project is to modify the Hydrological Simulation Program FORTRAN (HSPF) program so that precipitation additions to streams and lakes contain dissolved oxygen.

Statewide
Recipient
Crow Wing Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$20,442
Fund Source

This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.

Aitkin
Becker
Beltrami
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena