Minnesota's Legacy

All Projects

Showing 1 - 40 of 54 | Export projects
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$54,696
Fund Source

The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
McLeod
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Stevens
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Minnesota State University-Mankato
2010 Fiscal Year Funding Amount
$260,000
Fund Source

MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Steele
Waseca
Watonwan
Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Chippewa River Watershed Project
2013 Fiscal Year Funding Amount
$136,325
Fund Source

This project will work with the MPCA to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed . The Chippewa River Watershed Project (CRWP) team will also aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. The goal is to collect quality data and complete load calculations for the five sites using the MPCA's established protocols.

Big Stone
Chippewa
Douglas
Grant
Kandiyohi
Otter Tail
Pope
Stearns
Stevens
Swift
Recipient
Redwood-Cottonwood Rivers Control Area Joint Powers Board
2013 Fiscal Year Funding Amount
$17,714
Fund Source

The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.

Blue Earth
Brown
Cottonwood
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Redwood Cottonwood Rivers Control Area
2014 Fiscal Year Funding Amount
$138,033
Fund Source
The goal of this project is to perform water quality monitoring and load calculation duties to accomplish MPCA's Watershed Pollutant Load Monitoring Network monitoring efforts at seven sites for the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton.
Brown
Lyon
Redwood
Recipient
Braun Intertec
2017 Fiscal Year Funding Amount
$80,687
2018 Fiscal Year Funding Amount
$17,828
Fund Source

This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.

Anoka
Hennepin
Ramsey
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
Brown County
2010 Fiscal Year Funding Amount
$33,065
Fund Source

This project will work in cooperation with individual volunteers to perform grab samples and visual assessments of four waterbody sites in Brown County. The data collected will be an educational tool to inform the County’s citizens about water quality concerns. Using volunteers to collect the water quality samples and visual assessments will result in the volunteers taking personal pride and stewardship in clean water throughout the County.

Brown
Recipient
Chippewa River Watershed Project
2016 Fiscal Year Funding Amount
$100,429
2018 Fiscal Year Funding Amount
$40,197
2019 Fiscal Year Funding Amount
$28,066
Fund Source

The Chippewa River Watershed Project (CRWP) will work with the Minnesot Pollution Control Agency (MPCA) to conduct watershed pollutant load monitoring at four sites in the Chippewa River watershed and one site in the neighboring Pomme de Terre River watershed to aid the MPCA in measuring and comparing regional differences and long-term trends in water quality. Our goal is to collect quality data and complete load calculations for five sites using the MPCA's Watershed Pollutant Load Monitoring Network (WPLMN) established protocols.

Chippewa
Stevens
Swift
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Coon Creek Watershed District
2013 Fiscal Year Funding Amount
$252,200
Fund Source

This project will provide the MPCA, CCWD, and all other stakeholders the information and tools necessary to improve the water quality within Coon Creek Watershed District. The improvements will take place using targeted activities throughout the watershed to reduce the primary biological and chemical stressors. In turn, the reduction of these stressors will help to reduce overall loadings of sediment, turbidity, total phosphorus, and E. coli bacteria.

Anoka
Carver
Dakota
Hennepin
Ramsey
Sherburne
Washington
Wright
Recipient
Vadnais Lake Area Watershed Management Organization (VLAWMO)
2010 Fiscal Year Funding Amount
$40,000
Fund Source

The VLAWMO watershed covers approximately 25 square miles in the northeast metropolitan area in northern Ramsey County and a small portion of Anoka County, Minnesota. It encompasses the City of North Oaks and portions of the Cities of White Bear Lake, Gem Lake, Vadnais Heights, Lino Lakes, and White Bear Township. This project will gather and organize existing data, support the continuation of modeling and TMDL allocations along with an additional stakeholder meeting. It will also provide the completion of a draft and final TMDL report.

Anoka
Ramsey
Recipient
Redwood-Cottonwood Rivers Control Area JPO
2013 Fiscal Year Funding Amount
$9,000
Fund Source

This project will continue the offering of low-interest loans to citizens, some of whom may not be able to acquire funding otherwise, for upgrading 50 septic systems to ensure compliance with state rules. Grant funds will be used to administer the low-interest loan program.

Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Hennepin
Kandiyohi
Le Sueur
Lincoln
Lyon
Nicollet
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Swift
Traverse
Watonwan
Yellow Medicine
Recipient
Carnelian-Marine-St. Croix Watershed District
2013 Fiscal Year Funding Amount
$132,000
Fund Source

Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Minnesota State University-Mankato
2011 Fiscal Year Funding Amount
$17,949
Fund Source

This project will quantify and qualify the effectiveness of herbicide treatments and native plant re-establishment at Duck Lake through systematic vegetative surveys pre and post herbicide application and following mid-summer die-off of curly-leaf pondweed. The data and analysis will ultimately be used in the development of TMDLs, implementation and protection strategies for other lakes in the Middle Minnesota Major Watershed.

Blue Earth
Brown
Le Sueur
Nicollet
Recipient
Chippewa River Watershed Project
2011 Fiscal Year Funding Amount
$247,000

PROJECT OVERVIEW

Chippewa
Swift
Recipient
Center for Energy and Environment
2010 Fiscal Year Funding Amount
$2,000,000

Increasing energy conservation and efficiency in residences can play a significant role in Minnesota's goals for energy savings and carbon emissions reductions. The Center for Energy and Environment (CEE), a Minneapolis-based nonprofit organization, is using this appropriation to develop and implement innovative residential energy efficiency programs. Programs will be demonstrated in eight cities: Apple Valley, Austin, Duluth, Minneapolis, Owatonna, Park Rapids, Rochester, and St. Paul.

Dakota
Hennepin
Mower
Olmsted
Ramsey
Steele
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Fillmore
Goodhue
Wabasha
Winona
Carlton
Houston
Koochiching
Lake of the Woods
Mahnomen
Olmsted
Otter Tail
Pine
Roseau
Stearns
Todd
Wadena
Aitkin
Anoka
Becker
Beltrami
Benton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Lake
Mille Lacs
Morrison
Sherburne
St. Louis
Recipient
Redwood-Cottonwood Rivers Control Area (RCRCA)
2016 Fiscal Year Funding Amount
$142,257
2018 Fiscal Year Funding Amount
$40,405
2019 Fiscal Year Funding Amount
$28,078
Fund Source

The overall goal of this project is to perform water quality monitoring and load calculation duties to accomplish Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) monitoring efforts at the seven sites within the Redwood and Cottonwood River watersheds as well as the Minnesota River site near Morton. To accomplish this goal the requested funds will provide for technician’s time, mileage, lab costs, supplies, as well as equipment calibration and upkeep.

Brown
Lyon
Redwood
Recipient
National Eagle Center
2012 Fiscal Year Funding Amount
$30,000
2013 Fiscal Year Funding Amount
$30,000

PROJECT OVERVIEW

Dakota
Fillmore
Goodhue
Houston
Olmsted
Rice
Wabasha
Winona
Recipient
Lac qui Parle County Envrionmental Office
2015 Fiscal Year Funding Amount
$101,916
Fund Source

Lac qui Parle-Yellow Bank Watershed District will collect water chemistry samples from the three lakes and twenty-nine stream sites in the Lac qui Parle and Minnesota Headwaters watersheds following the MPCA’s Intensive Watershed Monitoring (IWM) plan for lakes and streams. Eleven samples will be collected at each lake from May through September during 2015 and 2016. Eleven samples will be collected at each of the twenty-nine stream sites in 2015. In addition, sixteen samples at each stream site will be collected in 2015 and 2016 following the E.

Big Stone
Lac qui Parle
Swift
Yellow Medicine
Recipient
Capitol Region Watershed District
2012 Fiscal Year Funding Amount
$275,000
Fund Source

This project will compile and review previously conducted studies and will prioritize best management practices (BMPs) based on a cost-benefit analysis of their pollutant load reductions and life cycle costs. It will also support the design and construction of BMPs, such as rain gardens and infiltration practices, within the Villa Park subwatershed of the Lake McCarrons watershed.

Ramsey
Recipient
Limnotech
2011 Fiscal Year Funding Amount
$49,980
Fund Source

This project will develop an Implementation Plan for restoring Lake St. Croix and impaired waters within the contributing watershed, and protect waters currently attaining water quality standards.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Stevens Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$13,986
Fund Source

This project will complete data collection on 11 lakes over a 2 year period in the Pomme de Terre Watershed. The data collected will be be used in the Major Watershed Project proposed for this watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Minnesota Land Trust
2010 Fiscal Year Funding Amount
$250,000

Project Outcome and Results

Anoka
Carver
Chisago
Dakota
Goodhue
Hennepin
Isanti
Le Sueur
Nicollet
Ramsey
Rice
Scott
Sherburne
Sibley
Washington
Wright
Recipient
Minnesota Land Trust
2012 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$200,000

With this appropriation, the Minnesota Land Trust plans to protect 150 acres of high quality forest, prairie, or wetland habitat by securing permanent conservation easements and dedicating funds for their perpetual monitoring, management, and enforcement. Lands being considered for permanent protection in this round of funding are located in Anoka, Carver, Goodhue, Hennepin, Isanti, Washington, and Wright counties.

Anoka
Carver
Chisago
Dakota
Goodhue
Hennepin
Isanti
Le Sueur
Nicollet
Ramsey
Scott
Sherburne
Sibley
Washington
Wright
2019 Fiscal Year Funding Amount
$0
2018 Fiscal Year Funding Amount
$0
2017 Fiscal Year Funding Amount
$0
2016 Fiscal Year Funding Amount
$0
2015 Fiscal Year Funding Amount
$0
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$0
2012 Fiscal Year Funding Amount
$1,000,000
2011 Fiscal Year Funding Amount
$4,000,000
Fund Source

This project will establish a groundwater monitoring network in the 11 county metropolitan area. The network will provide information about aquifer characteristics and natural water trends by monitoring healthy aquifers (non-stressed systems). The project will also develop an automated system that captures groundwater level and water use data. This system will enhance evaluation of changes in aquifers that are stressed by pumping from existing wells.

Anoka
Carver
Chisago
Dakota
Hennepin
Isanti
Ramsey
Scott
Washington
Wright
Sherburne
Recipient
Itasca County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$64,701
Fund Source

The goal of this project is complete a dataset necessary for assessment of 6 stream sites and 11 lakes within the Mississippi Headwaters Watershed to determine the overall health of its water resources, to identify impaired waters, and to identify those waters in need of additional protection to prevent future impairments.

Big Stone
Chippewa
Lac qui Parle
Stevens
Swift
Traverse
Recipient
Minnesota Pollution Control Agency
2010 Fiscal Year Funding Amount
$4,432,804
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Anoka
Becker
Beltrami
Big Stone
Carver
Cass
Chippewa
Clearwater
Crow Wing
Dakota
Grant
Hennepin
Hubbard
Itasca
Kandiyohi
Koochiching
Lac qui Parle
Lincoln
Lyon
Morrison
Olmsted
Otter Tail
Ramsey
Redwood
Renville
Sherburne
Stevens
Todd
Traverse
Wabasha
Wadena
Washington
Wilkin
Wright
Yellow Medicine
Recipient
Minnesota Pollution Control Agency
2013 Fiscal Year Funding Amount
$5,265,335
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Anoka
Benton
Big Stone
Blue Earth
Brown
Chippewa
Chisago
Cook
Cottonwood
Crow Wing
Faribault
Freeborn
Isanti
Jackson
Kanabec
Kittson
Lac qui Parle
Lake
Le Sueur
Marshall
Martin
Mille Lacs
Morrison
Nicollet
Pennington
Pine
Polk
Redwood
Renville
Roseau
Sibley
Stevens
Swift
Traverse
Watonwan
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Great River Greening/Nicollet County SWCD
2013 Fiscal Year Funding Amount
$39,280
Fund Source

This grant will allow Nicollet SWCD and partners the means to establish local and regional volunteer monitors for this and future monitoring activities in the Middle Minnesota River Watershed Basin. It also enhances past water quality studies by providing present data for water quality assessment in the Seven Mile Creek Watershed, which has and is receiving support by numerous entities to increase the water quality of that watershed.

Blue Earth
Brown
Cottonwood
Le Sueur
Nicollet
Redwood
Renville
Sibley
Watonwan
Recipient
Olmsted County SWCD
2018 Fiscal Year Funding Amount
$80,376
Fund Source

Olmsted SWCD will work in coordination with Fillmore SWCD and Root River (Houston) SWCD to collect water quality and chemistry parameters on 14 Minnesota Pollution Control Agency approved sites within the Root River watershed during the 2018-2019 sampling season.
Parameters to be tested include:TSS, TP, Chloride, CaCO3 (hardness), E. Coli, Chlorophyll A, Specific Conductance, Temp, pH, DO, NO2/NO3.

Fillmore
Houston
Olmsted
Winona
Recipient
Pomme de Tere River Association
2017 Fiscal Year Funding Amount
$46,133
Fund Source

The Pomme de Terre River Association will partner with the Minnesota Pollution Control Agency to conduct water quality monitoring in the Pomme de Terre River Watershed. The purpose will be to determine if waters meet the states non-point source pollution standards. The data collected will be utilized to produce the cycle two Watershed Restoration and Protection Strategy (WRAPS) report and supporting documents for the watershed. Through the utilization of this funding a total of 11 lakes and 7 stream reaches will be assessed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Pomme de Terre River Association
2017 Fiscal Year Funding Amount
$52,000
Fund Source

This project will establish a framework with the Pomme de Terre River Association (PDTRA), county staff, Soil and Water Conservation District staff, and state agencies that will outline their involvement throughout the development of the Watershed Restoration and Protection Strategy (WRAPS) for the Pomme de Terre River watershed. This work will form the basis to establish restoration and protection strategies that local governments and watershed organizations can use to make decisions that will lead to protecting and restoring the waters in the watershed.

Big Stone
Douglas
Grant
Otter Tail
Stevens
Swift
Recipient
Redwood-Cottonwood Rivers Control Area
2017 Fiscal Year Funding Amount
$75,605
Fund Source

In 2017 and 2018, Redwood-Cottonwood Rivers Control Area (RCRCA) will collect water chemistry samples from the 10 lakes and 24 stream sites identified in the Redwood and Cottonwood River watersheds. Six samples will be collected at 10 lakes from May through September in 2017; five samples will be collected at 5 lakes in 2018 from May through September. Eleven samples will be collected at each of the 24 stream sites following the Basic Regime in 2017. Sixteen samples at each stream site will be collected in 2017 and 2018 following the E.coli monitoring regime.

Brown
Cottonwood
Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
Fillmore County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$319,700
Fund Source

TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Minnesota State University- Mankato
2011 Fiscal Year Funding Amount
$34,345
Fund Source

The Seven Mile Creek Condition Monitoring project will maintain and build on the continuous flow and water quality data base at three stream sites and one county tile in the Seven Mile Creek watershed through the collection of approximately eighty five water samples per monitoring season in preparation for the Middle Minnesota Intensive Watershed Monitoring scheduled to begin in 2013.

Blue Earth
Brown
Cottonwood
Le Sueur
Nicollet
Redwood
Renville
Sibley
Watonwan