Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$32,421
Fund Source

This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
Pheasants Forever
2011 Fiscal Year Funding Amount
$3,505,000
Fund Source

Pheasants Forever (PF) and the U.S. Fish and Wildlife Service (Service) will cooperate to permanently restore and protect approximately 1397.31 acres as Waterfowl Production Areas (WPAs) in western and southern Minnesota. All lands acquired through this grant proposal will be owned and managed by the Service as part of the National Wildlife Refuge System.

Becker
Big Stone
Clay
Faribault
Freeborn
Grant
Jackson
Kandiyohi
Lincoln
Lyon
Mahnomen
Otter Tail
Swift
Recipient
Department of Natural Resources
2010 Fiscal Year Funding Amount
$1,700,000
Fund Source

The Minnesota Department of Natural Resources Accelerated Prairie Grassland Restoration and Management Program had a successful first round of funding from the Legacy Funds. The program worked through the growing pains and obstacles in getting a new program up and operational and was successful in enhancing nearly 5,800 acres of prairie and grasslands in eight of the ecological subsections of Minnesota. A contractor base has been established for this type of work statewide that needs to be evaluated and expanded on for future appropriations.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Cass
Chippewa
Clay
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Jackson
Kanabec
Kandiyohi
Lac qui Parle
Lake
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Meeker
Morrison
Mower
Murray
Nicollet
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Redwood
Renville
Rice
Scott
Sibley
St. Louis
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
DNR
2014 Fiscal Year Funding Amount
$1,790,000
Fund Source

Many of Minnesota's wetlands have been lost and the remainder degraded.  The original proposal planned for 15,000 acres of wetland/shallow lake enhancement to provide critical habitat for each life stage of waterfowl and wetland wildlife.  The six projects subsequently completed with this appropriation enhanced 13,800 acres of wetlands and shallow lakes in the Prarie and Forest/Prairie Ecosections of Minnestoa.

Aitkin
Becker
Benton
Big Stone
Freeborn
Jackson
Kittson
Lac qui Parle
Le Sueur
Lincoln
Mille Lacs
Nicollet
Polk
Roseau
Todd
Wilkin
Recipient
DNR
2015 Fiscal Year Funding Amount
$1,050,000
Fund Source

Many of Minnesota's wetlands have been lost and the remainder degraded.  Recent tiling and ditching have accelerated this situation.  Through this proposal, shallow lakes and wetlands will be designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents.

Aitkin
Benton
Freeborn
Isanti
Kittson
Lincoln
Mahnomen
Marshall
Mille Lacs
Morrison
Murray
Nobles
Pennington
Pope
Roseau
Steele
Todd
Wilkin
Wright
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$1,652,000
Fund Source

This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.

Anoka
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Clay
Cottonwood
Dodge
Faribault
Fillmore
Freeborn
Goodhue
Houston
Isanti
Jackson
Kanabec
Kandiyohi
Lac qui Parle
Lincoln
Lyon
Martin
McLeod
Meeker
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Otter Tail
Pipestone
Redwood
Renville
Sherburne
Sibley
Stearns
Swift
Todd
Wabasha
Wadena
Washington
Watonwan
Winona
Wright
Yellow Medicine
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$826,000
Fund Source

This program of on-the-ground conservation projects increased the wildlife and ecological values of forest communities on Minnesota's public forestlands. Restoration and enhancement projects in this program enhanced more than 10,000 acres of forest.

Aitkin
Becker
Beltrami
Cass
Fillmore
Goodhue
Hubbard
Itasca
Kanabec
Koochiching
Lake
Marshall
Mille Lacs
Morrison
Olmsted
Roseau
St. Louis
Stearns
Wadena
Winona
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$6,500,000
Fund Source

We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.

Becker
Beltrami
Benton
Blue Earth
Cass
Chisago
Clay
Cook
Cottonwood
Crow Wing
Dakota
Douglas
Faribault
Fillmore
Houston
Hubbard
Itasca
Kandiyohi
Lake
Morrison
Olmsted
Otter Tail
Redwood
Rice
Scott
St. Louis
Swift
Wabasha
Winona
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$1,791,000
Fund Source

This program will increase populations of a variety of game and non-game wildlife species by protecting and enhancing forest habitats on which wildlife depends. This program of on-the-ground forest conservation projects will amplify the wildlife value of forest communities on DNR administered forestlands. Our forest enhancement will treat 4,472 ac. These activities are not conducted as part of the DNR's commercial timber operations. Additionally, our program will acquire 404 acres of forestland that contributes to habitat complexes and other high priorities.

Aitkin
Beltrami
Benton
Carlton
Cass
Chisago
Cook
Crow Wing
Dakota
Fillmore
Goodhue
Hennepin
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Marshall
Mille Lacs
Olmsted
Pine
Rice
Roseau
St. Louis
Wadena
Winona
Recipient
DNR - Fisheries & Wildlife
2011 Fiscal Year Funding Amount
$6,505,000
Fund Source

Ducks Unlimited and Minnesota DNR Section of Wildlife completed 26 project affecting 7,603 acres, including three wetland restoration projects restoring 97 acres, 18 shallow lake enhancement projects enhancing 7,154 wetland acres, and five fee-title land acquisition projects protecting 352 acres.

Anoka
Becker
Benton
Big Stone
Blue Earth
Clearwater
Cottonwood
Crow Wing
Freeborn
Kittson
Le Sueur
Lyon
Marshall
Martin
Meeker
Murray
Nobles
Polk
Pope
Roseau
Stearns
Stevens
Wright
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$3,416,000
Fund Source

Accomplishments of the appropriation include: i) protection of 3.9 miles of shoreline; ii) modification of 4 lake outlet structures to allow fish passage, benefiting 1,264 acres; iii) enhanced river and stream functions at 15 sites, benefiting over 17 river miles; and iv) enhance 4.5 miles of shoreline habitat on publicly-owned lakeshore.

Aitkin
Becker
Beltrami
Blue Earth
Carver
Cass
Chisago
Cook
Crow Wing
Dakota
Fillmore
Freeborn
Goodhue
Hennepin
Houston
Hubbard
Itasca
Jackson
Kandiyohi
Lake
Le Sueur
Martin
Meeker
Morrison
Murray
Olmsted
Otter Tail
Ramsey
Redwood
Recipient
DNR
2013 Fiscal Year Funding Amount
$3,870,000
Fund Source

This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program.  Ten thousand acres of wetlands were enhanced by these activities.

Aitkin
Benton
Carver
Cottonwood
Freeborn
Itasca
Jackson
Koochiching
Lac qui Parle
Lincoln
Lyon
Marshall
Mille Lacs
Roseau
Todd
Wilkin
Yellow Medicine
Recipient
Minnesota Geological Survey
2014 Fiscal Year Funding Amount
$615,000
2015 Fiscal Year Funding Amount
$615,000
Fund Source

This project will accelerate production of County Geologic Atlases (part A). An atlas is a set of geologic maps and associated databases for a county that facilitate informed management of natural resources, especially water and minerals.

Brown
Cass
Dodge
Hennepin
Isanti
Lake
Redwood
St. Louis
Wadena
Washington
Recipient
Farmers, Rural Landowners, and Agricultural Supply Businesses
2019 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$75,000
2017 Fiscal Year Funding Amount
$75,000
2016 Fiscal Year Funding Amount
$75,000
2015 Fiscal Year Funding Amount
$200,000
2014 Fiscal Year Funding Amount
$200,000
2013 Fiscal Year Funding Amount
$4,500,000
2012 Fiscal Year Funding Amount
$4,500,000
2011 Fiscal Year Funding Amount
$2,500,000
2010 Fiscal Year Funding Amount
$2,000,000
Fund Source

The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.

Anoka
Becker
Blue Earth
Brown
Carver
Cook
Cottonwood
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Houston
Hubbard
Jackson
Kandiyohi
Lac qui Parle
Le Sueur
Lincoln
Lyon
Martin
Morrison
Mower
Murray
Nicollet
Olmsted
Pipestone
Pope
Redwood
Renville
Rice
Rock
Scott
Sherburne
Sibley
St. Louis
Stearns
Steele
Stevens
Todd
Traverse
Wabasha
Waseca
Washington
Watonwan
Winona
Yellow Medicine
Recipient
Shell Rock River Watershed District
2015 Fiscal Year Funding Amount
$700,000
2014 Fiscal Year Funding Amount
$1,127,000
Fund Source

The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.

Freeborn
Recipient
MPCA
2010 Fiscal Year Funding Amount
$300,000

Project Overview

Cook
Lake
St. Louis
Recipient
Multiple Local Government Units
2012 Fiscal Year Funding Amount
$1,500,000
Fund Source

Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.

Big Stone
Cass
Dodge
Douglas
Lincoln
Marshall
McLeod
Mille Lacs
Pennington
Pipestone
Rock
St. Louis
Stearns
Recipient
Cass SWCD
2011 Fiscal Year Funding Amount
$77,862
Fund Source

This 3-part project is developing and installing shoreline buffer projects on Ten Mile Lake, and the Roosevelt, Lawrence, Leavitt Lake area (RALALA).An additional part will correct roadway erosion contributing to sedimentation and water quality degradation on Buxton Road between McKeowen and Mann Lakes. Woodrow Township will work with Cass County SWCD/ESD and adjacent landowners to construct sedimentation basins and rain gardens and restructure the roadbed by reducing the slope to eliminate erosion and sedimentation.

Cass
Recipient
Mower County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$99,929
Fund Source

This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.

Dodge
Freeborn
Mower
Steele
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$75,000
2013 Fiscal Year Funding Amount
$75,000

PROJECT OVERVIEW

Cook
Lake
St. Louis
Recipient
MN Trout Unlimited
2012 Fiscal Year Funding Amount
$1,533,000
Fund Source

Minnesota Trout Unlimited enhanced in-stream and riparian fish and wildlife habitat in and along coldwater streams located on public lands and Aquatic Management Areas. We completed all 9 projects originally proposed and three additional. Contracting efficiencies and leveraging of other funding allowed us to add two habitat enhancement projects in southeast Minnesota and another segment on the Sucker River in northeast Minnesota. We enhanced 10 more acres of habitat than originally proposed and increased leverage by $121,700 (67%).

Goodhue
Lake
Nicollet
Olmsted
St. Louis
Wabasha
Winona
Recipient
MN Trout Unlimited
2013 Fiscal Year Funding Amount
$2,120,000
Fund Source

Minnesota Trout Unlimited enhanced in-stream and riparian fish and wildlife habitat in and along coldwater streams and lakes located on public lands and Aquatic Management Areas.  We originally proposed 11 projects, yet completed 13 projects. Contracting efficiencies and leveraging of other funding allowed us to add three more habitat enhancement projects in northeast Minnesota and to lengthen others.  One small budget project was dropped when a partner changed the scope from 144 acres to less than 15 and proposed costs outweighed the potential benefit.

Cook
Fillmore
Goodhue
Lake
Olmsted
Wabasha
Winona
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Emmons & Olivier Resources (EOR)
2013 Fiscal Year Funding Amount
$51,477
Fund Source

This project will develop a TMDL for all impaired lakes within the Crow Wing Watershed by furthering data collection in the watershed, analysis of data, allocation calculations, and introducing outreach and stakeholder participation activities.

Wadena
Crow Wing
Clearwater
Todd
Cass
Otter Tail
Becker
Morrison
Hubbard
Recipient
Emmons & Olivier Resources
2012 Fiscal Year Funding Amount
$15,041
Fund Source

This first year of the project will collect available data relevant to the TMDL development, determine the data sets best suited for the TMDL development. Gain a better understanding of the watershed and impaired lakes, and assessment of all potential sources (internal and external) of the causes of lake impairment. EOR will also review the data produced by the MPCA for the impairment assessment for each of the lakes during year 1 of the project.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Mower County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$182,020
Fund Source

This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.

Dodge
Freeborn
Mower
Steele
Recipient
South St. Louis County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$283,224
Fund Source

This project will provide fiscal resources for South St. Louis County Soil and Water Conservation District (SSLCSWCD) to participate and lead efforts to attain geomorphic data sets, dissolved oxygen assessments, culvert inventory, and civic engagement activities in three major watersheds, Nemadji River, South Lake Superior and St. Louis River. This work is currently being worked on as a part of the MPCA’s Watershed Restoration and Protection Planning efforts.

Carlton
Lake
St. Louis
Recipient
Hubbard Soil & Water Conservation District (SWCD)
2012 Fiscal Year Funding Amount
$69,990
Fund Source

This project covers activities necessary to complete the major watershed restoration and projection project. The major objectives this project covers include contract administration, watershed coordination, stressor ID activities, identifying priority management zones, engage watershed citizens, and the creation of watershed restoration and protection plans.

Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$49,996
Fund Source

This project will finalize HSPF watershed model construction by incorporating internal phosphorus loading in modeled lakes, run a suite of implementation scenarios and generate a GenScn project containing model output. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will deliver all modeling files for baseline and implementation scenarios and provide a GenScn project containing model output.

Becker
Carver
Cass
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Morrison
Otter Tail
Pope
Renville
Sibley
Stearns
Todd
Wadena
Wright
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$70,000
Fund Source

This project will complete spatial and temporal revisions , recalibration and validation of 7 watershed HSPF models. These fully functioning calibrated validated executable models will simulate hydrology, sediment (sand, silt, and clay), temperature, phosphorus, nitrogen, dissolved oxygen, biochemical oxygen demand, and algae at the 12-digit HUC subbasin scale (or finer).

Blue Earth
Brown
Carver
Cottonwood
Dakota
Faribault
Freeborn
Jackson
Le Sueur
Lincoln
Lyon
Martin
McLeod
Murray
Nicollet
Pipestone
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Waseca
Watonwan
Yellow Medicine
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$300,000
2013 Fiscal Year Funding Amount
$300,000

PROJECT OVERVIEW

Cook
Lake
St. Louis
Recipient
DNR
2019 Fiscal Year Funding Amount
$2,834,000
Fund Source

Good habitat is critical to sustaining quality fish populations in both lakes and rivers. DNR proposes to restore or enhance aquatic habitat under two programs: stream restoration, and Aquatic Management Area (AMA) enhancement. Stream restoration includes major channel restorations and fish passage projects such as dam removals intended to improve or provide access to critical aquatic habitats.

Aitkin
Anoka
Becker
Becker
Beltrami
Benton
Big Stone
Brown
Carlton
Carver
Cass
Chisago
Clay
Cook
Crow Wing
Dakota
Douglas
Fillmore
Goodhue
Houston
Houston
Itasca
Kandiyohi
Kandiyohi
Lake
Lake of the Woods
Le Sueur
Marshall
McLeod
Meeker
Mille Lacs
Morrison
Mower
Nicollet
Otter Tail
Pine
Pope
Redwood
Renville
Rice
Scott
St. Louis
St. Louis
St. Louis
Todd
Wabasha
Waseca
Winona
Wright
Recipient
DNR
2019 Fiscal Year Funding Amount
$4,007,000
Fund Source

This programmatic request will build on the DNR’s previous efforts to enhance and restore grasslands, prairies, and savannas. We will use the Prairie Conservation Plan and Pheasant Summit Action Plan to guide these efforts in a strategic and targeted manner. This proposal will work on a number of types of permanently protected habitats, most of which are open to public hunting, including; DNR WMAs, SNAs, AMAs, Prairie Bank Easements, State Forests, as well as USFWS WPAs and Refuges.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carver
Cass
Chippewa
Clay
Clearwater
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Jackson
Kandiyohi
Kittson
Lac qui Parle
Lac qui Parle
Lincoln
Lyon
Mahnomen
Marshall
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Norman
Olmsted
Otter Tail
Pipestone
Polk
Pope
Red Lake
Redwood
Renville
Rice
Roseau
Scott
Sherburne
Sherburne
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Washington
Wilkin
Winona
Wright
Yellow Medicine
Recipient
DNR
2017 Fiscal Year Funding Amount
$2,074,000
Fund Source

The Minnesota Department of Natural Resources will restore or enhance habitat to facilitate fish passage, restore degraded streams, and enhance habitat critical to fish and other aquatic life. Projects are prioritized based on ecological benefit, urgency, feasibility, and stakeholder support.

Becker
Cass
Clay
Crow Wing
Dakota
Nobles
Otter Tail
Pine
Redwood
St. Louis
Swift
Wabasha
Winona
Recipient
Minnesota Historical Society
2016 Fiscal Year Funding Amount
$66,213
Partners: Northland Schools, Remer, and Washington Technology Magnet School, St. Paul Improving the educational achievement of Minnesota's students is a strategic priority for MNHS. The Educational Achievement initiative allows MNHS to create partnerships with two school districts
Ramsey
Cass
Recipient
USGS
2010 Fiscal Year Funding Amount
$125,000

Ballast water - water carried in tanks on ships to help provide stability and aid steering - is likely the single greatest source for introduction of non-native and invasive aquatic species. Ballast water is collected in one body of water and discharged into another body of water, usually large distances apart. At least one new invasive species is found in the Great Lakes every year, with Lake Superior being particularly at risk. Scientists from the U.S.

Cook
Lake
St. Louis
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
Shell Rock River Watershed District
2010 Fiscal Year Funding Amount
$655,000
Fund Source

As a result of the installation of the two fish barriers, one on Wedge Creek and one on White Lake, we have kept Common Carp from migrating from Fountain Lake into the shallow upstream basins. This has helped improve the water clarity and water quality in the upstream areas which are now excluded from Common Carp. Since these upstream areas are interconnected to Fountain Lake, water quality in Fountain Lake has also improved. Secchi disk readings on Fountain Lake were the best on record in 2010, averaging 2.7 feet of water clarity.

Freeborn