The goal of the project is the development of an overall strategy for reduction of turbidity/TSS, with sets of sediment reduction initiatives and actions for various sources, to address the Minnesota River Turbidity TMDL and the South Metro Mississippi River TSS TMDL.
MSU-Mankato Water Resources Center in the Mankato area will provide conventional pollutant monitoring at the following sites: Beauford Ditch, Big Cobb River, Blue Earth River, Le Sueur River (3), Little Cobb River, Minnesota River (2), Watonwan River.
This project will support the monitoring of two sites on the Cannon River throughout the field seasons of 2013 and 2014 during storm events and baseflow conditions to capture 25 samples per year at each site according to the WPLMN objectives. The information gathered from these samples and site visits will be compiled for reporting purposes and for use in calculating pollutant loading using the FLUX32 model.
The MPCA has identified 13 stream sites in the watershed to characterize watershed water quality. This project will supplement and complement the identification of the top 50 sites in the watershed that are contributing to water impairment and also help in identification of priority watersheds in the re-write of the watershed comprehensive plan. Water samples and field measurements will be collected at each monitoring location ranging from baseline events to high flow events.
The overall goal of this project is to perform water quality monitoring duties to accomplish MPCA’s SWAG monitoring efforts at the four sites listed in Section IV of this application for the Middle Minnesota River stream sites selected in Renville, Redwood and Brown counties and allow for the assessment of aquatic life and aquatic recreation use for those reaches of the minor streams.
The primary goal of this project is to accurately collect surface water quality data to help support the MPCA’s Intensive Watershed Monitoring efforts in the Lake Superior North Watershed.
Pheasants Forever (PF) and the U.S. Fish and Wildlife Service (Service) will cooperate to permanently restore and protect approximately 1397.31 acres as Waterfowl Production Areas (WPAs) in western and southern Minnesota. All lands acquired through this grant proposal will be owned and managed by the Service as part of the National Wildlife Refuge System.
The Minnesota Department of Natural Resources Accelerated Prairie Grassland Restoration and Management Program had a successful first round of funding from the Legacy Funds. The program worked through the growing pains and obstacles in getting a new program up and operational and was successful in enhancing nearly 5,800 acres of prairie and grasslands in eight of the ecological subsections of Minnesota. A contractor base has been established for this type of work statewide that needs to be evaluated and expanded on for future appropriations.
Many of Minnesota's wetlands have been lost and the remainder degraded. The original proposal planned for 15,000 acres of wetland/shallow lake enhancement to provide critical habitat for each life stage of waterfowl and wetland wildlife. The six projects subsequently completed with this appropriation enhanced 13,800 acres of wetlands and shallow lakes in the Prarie and Forest/Prairie Ecosections of Minnestoa.
Many of Minnesota's wetlands have been lost and the remainder degraded. Recent tiling and ditching have accelerated this situation. Through this proposal, shallow lakes and wetlands will be designed, constructed, and intensively managed to benefit wetland wildlife and Minnesota residents.
This appropriation funded 283 projects totaling 21,953 acres. The two largest types of enhancement were 112 woody removal projects totaling 10,160 acres and 134 prescribed burns totaling 10,082 acres. Additionally, we seeded 30 sites totaling 1386 acres, put in infrastructure for conservation grazing of 236 acres on 3 sites, conducted 3 oak savanna enhancements totaling 42 acres, and treated 47 acres of invasive species on 2 sites.
This program of on-the-ground conservation projects increased the wildlife and ecological values of forest communities on Minnesota's public forestlands. Restoration and enhancement projects in this program enhanced more than 10,000 acres of forest.
We protected 22.3 miles of trout streams and 1.3 miles of lakeshore via easements (585 acres in total), and 7.4 miles (504 acres) of lakeshore through fee-title purchase. We enhanced shoreline habitat on 524 acres of riparian land, and instream habitat on 3.1 miles of trout streams and 0.5 miles of warmwater rivers.
This proposal will address a backlog of shallow lake and wetland habitat work that will otherwise go unfunded. These projects will address work called for in the Minnesota Prairie Conservation Plan, Long Range Duck Recovery Plan, and Shallow Lakes plan.
We propose restoration and enhancement of prairie and savanna on WMA’s, SNA’s, and Native Prairie Banks in Minnesota and restoration and enhancement of bluff prairies on State Forest Land in southeast Minnesota.
With these funds we were able to restore, protect, and enhance 24,611 acres of native and restored grassland in Minnesota. Much of this work was done through the DNR Roving Crews, a new program funded with these dollars that has significantly increased the state's habitat management capabilities. In addition to these enhancement activities we were able to enroll acres in the DNR's Native Prairie Bank Easement Program as well as acquire acres for the SNA program.
This program will increase populations of a variety of game and non-game wildlife species by protecting and enhancing forest habitats on which wildlife depends. This program of on-the-ground forest conservation projects will amplify the wildlife value of forest communities on DNR administered forestlands. Our forest enhancement will treat 4,472 ac. These activities are not conducted as part of the DNR's commercial timber operations. Additionally, our program will acquire 404 acres of forestland that contributes to habitat complexes and other high priorities.
Ducks Unlimited and Minnesota DNR Section of Wildlife completed 26 project affecting 7,603 acres, including three wetland restoration projects restoring 97 acres, 18 shallow lake enhancement projects enhancing 7,154 wetland acres, and five fee-title land acquisition projects protecting 352 acres.
Accomplishments of the appropriation include: i) protection of 3.9 miles of shoreline; ii) modification of 4 lake outlet structures to allow fish passage, benefiting 1,264 acres; iii) enhanced river and stream functions at 15 sites, benefiting over 17 river miles; and iv) enhance 4.5 miles of shoreline habitat on publicly-owned lakeshore.
This proposal impacts shallow lakes and wetlands in Minnesota through the design and construction of projects, enhancement work done by DNR roving habitat crews, and shallow lakes work identified and initiated through the DNR Shallow Lakes program. Ten thousand acres of wetlands were enhanced by these activities.
The AgBMP Loan Program provides needed funding for local implementation of clean water practices at an extremely low cost, is unique in its structure and is not duplicated by any other source of funding.The AgBMP loan program provides 3% loans through local lenders to farmers, rural landowners, and agriculture supply businesses.
At 410 acres, Lake Owasso is the largest lake in the Grass Lake Water Management Organization (GLWMO) and one of the most pristine. Maintaining the lakes water quality is a priority for the GLWMO. A long urbanized area along Aladdin Street in Roseville currently lacks stormwater features to remove pollutants and reduce water volume. The rainwater from this area drains directly to a wetland which is hydrologically connected to Lake Owasso. Adjacent to the residential area is a 0.5 acre parking lot which drains into a ditch which eventually enters the same wetland.
The Albert Lea Lake Management project replaced the previous Albert Lea Lake fix-crest dam with a 3-in-1 structure that included a rock riffle dam, a lake level management structure, and an electric fish barrier. The benefits from this project include improved aquatic and waterfowl habitat, invasive species management, and improved desirable fish populations.
This project will complete the installation of four nested wells to the Ambient Groundwater Monitoring Network and relocated one well in the City of Saint Paul. Braun Intertec will coordinate site access and oversee the well installation by a state drilling contractor.
A direct appropriation of $400,000 in FY 2010 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area (the law also provides $600,000 for this purpose in FY2011).
A direct appropriation of $400,000 in FY 2010 and $600,000 in FY2011 for the Anoka Conservation District (ACD) is for the metropolitan landscape restoration program for water quality and improvement projects in the seven-county metro area.
This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River
The Cannon River Watershed is a diverse watershed from the standpoint of topography, land use, and land cover, but a central issue of concern is increased sedimentation and turbidity within the river. One of the best ways to keep sediment from entering the Cannon River is to install vegetative buffers on the smaller tributaries in the upper reaches of the watershed. This project is important as it aims to help identify strategic locations where buffers are needed and to assist landowners to install buffers that will directly help reduce sedimentation within the watershed.
Complete section 3 of Watershed Restoration and Protection Strategy (WRAPS) document for the Cannon and Zumbro Watersheds and provide input to sections 1 and 2.
The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.
This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.
This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.
Lambert Creek discharges into Vadnais Lake, the final impoundment reservoir containing the potable water supply for the city of St. Paul and eight nearby suburbs. Monitoring data indicates high nutrient levels and the creek is listed by the State as having high bacterial levels. In-stream work along Lambert Creek has been maximized with restoration improvements achieving nutrient load reduction. The next step to further improve water quality is to concentrate on restoration efforts on a subwatershed level.
The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.
Minnesota Trout Unlimited enhanced in-stream and riparian fish and wildlife habitat in and along coldwater streams located on public lands and Aquatic Management Areas. We completed all 9 projects originally proposed and three additional. Contracting efficiencies and leveraging of other funding allowed us to add two habitat enhancement projects in southeast Minnesota and another segment on the Sucker River in northeast Minnesota. We enhanced 10 more acres of habitat than originally proposed and increased leverage by $121,700 (67%).
Minnesota Trout Unlimited enhanced in-stream and riparian fish and wildlife habitat in and along coldwater streams and lakes located on public lands and Aquatic Management Areas. We originally proposed 11 projects, yet completed 13 projects. Contracting efficiencies and leveraging of other funding allowed us to add three more habitat enhancement projects in northeast Minnesota and to lengthen others. One small budget project was dropped when a partner changed the scope from 144 acres to less than 15 and proposed costs outweighed the potential benefit.
Lambert Creek is wholly within the Vadnais Lake Area Water Management Area. Vadnais Lake is the drinking water reservoir for the City of St. Paul and surrounding communities. Lambert Creek has elevated bacteria and nutrient levels and water quality in Vadnais Lake will not improve unless there is a reduction in the phosphorus loading from Lambert Creek.
This project will build upon existing planning and implementation efforts already taken on in the project area. The collection of existing information will be used to complement water information in support of a more successful and sustainable water quality improvement and protection implementation program. This will be achieved by active civic engagement activities throughout Phase I of this project.