Minnesota's Legacy

All Projects

Showing 1 - 39 of 39 | Export projects
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$40,000
Fund Source
There are two main goals of this Cedar Basin HSPF project, A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
Dodge
Freeborn
Mower
Steele
Recipient
Emmons & Olivier Resources Inc
2017 Fiscal Year Funding Amount
$34,959
Fund Source

This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.

Dodge
Freeborn
Mower
Recipient
Barr Engineering Co
2017 Fiscal Year Funding Amount
$48,510
Fund Source

This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.

Dodge
Freeborn
Mower
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$121,916
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Zumbro River watershed. The consultant will produce HSPF watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDLs). The consultant will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Dodge
Goodhue
Mower
Olmsted
Rice
Steele
Wabasha
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,967
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Lake of the Woods River watershed. The consultants will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultants will clearly demonstrate that the models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Lake of the Woods
Roseau
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Aqua Terra Consultants
2013 Fiscal Year Funding Amount
$36,848
Fund Source

This project will maximize the utility and usefulness of three HSPF models that have been constructed and calibrated for hydrology. The contractor will identify and reduce parameterization errors in the following three HSPF models: 1) Buffalo River Watershed, 2 ) Thief River Watershed, 3) Bois de Sioux-Mustinka Watersheds. This will result, not only in a better hydrology calibration, but will also improve each of the models’ ability to more accurately estimate sediment and pollutant loads and concentrations.

Becker
Beltrami
Big Stone
Clay
Grant
Marshall
Otter Tail
Pennington
Roseau
Stevens
Traverse
Wilkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,968
Fund Source

The goal of this project is to construct, calibrate, and validate a watershed model using Hydrologic Simulation Program FORTRAN (HSPF). The project will result in a HSPF model that can readily be used to provide information to support conventional parameter TMDLs.

Kittson
Marshall
Roseau
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$90,000
Fund Source

The goal of this project is to construct watershed models for the Grand Marais Creek and Snake River Watersheds and perform an initial hydrologic calibration using Hydrologic Simulation Program FORTRAN (HSPF).

Marshall
Pennington
Polk
Recipient
Houston Engineering
2012 Fiscal Year Funding Amount
$67,996
Fund Source

This project will continue to develop, and calibrate/validate the hydrology of an HSPF watershed model for the Thief River watershed. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$95,000
Fund Source
The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.
Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Houston Engineering
2015 Fiscal Year Funding Amount
$156,937
Fund Source

The goal of this project is to construct, calibrate, and validate two (2) watershed models using Hydrologic Simulation Program FORTRAN (HSPF).

Becker
Clay
Mahnomen
Norman
Recipient
RESPEC
2011 Fiscal Year Funding Amount
$214,963
Fund Source

This project will complete spatial and temporal revisions of 6 Hydrologic Simulation Program FORTRAN (HSPF) models, the recalibration and validation of 7 watershed HSPF models, and the revision of the drainage network and point source representation of the Pomme de Terre HSPF model.

Big Stone
Blue Earth
Brown
Carver
Cottonwood
Dakota
Douglas
Faribault
Freeborn
Grant
Hennepin
Jackson
Le Sueur
Lincoln
Lyon
Mahnomen
Martin
McLeod
Murray
Nicollet
Norman
Otter Tail
Pipestone
Polk
Ramsey
Redwood
Renville
Rice
Scott
Sibley
Steele
Stevens
Swift
Waseca
Watonwan
Yellow Medicine
Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Anoka
Carver
Dakota
Dodge
Goodhue
Hennepin
Le Sueur
McLeod
Mower
Nicollet
Olmsted
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Steele
Wabasha
Washington
Wright
Recipient
St. Croix Watershed Research Station
2019 Fiscal Year Funding Amount
$213,257
Fund Source

Previous research by the St. Croix Watershed Research Station (SCWRS) has identified lake physics (temperature and oxygen) and nutrient recycling (nitrogen and phosphorus) as key drivers of lake algal blooms. SCWRS will conduct monitoring consistent with the prior research efforts by re-deploying three moored buoys to collect data throughout the 2019 ice-free season, including surface water samples. Additionally, SCWRS will deploy an in situ flourometer to measure total algae and cyanobacteria concentrations and will collect and analyze cyanobacterial toxins.

Lake of the Woods
Roseau
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$96,888
Fund Source

This project will complete the Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategies (WRAPS) for the Lake Superior North watershed. Two segments of the Flute Reed River are impaired for aquatic life due to elevated turbidity and total suspended solids. The lower Poplar River is also listed as impaired but significant progress has occurred in the last 10 years. A TMDL and implementation plan have been completed for the lower Poplar River impairment. All other waters meet water quality standards and will be considered for protection measures.

Cook
Lake of the Woods
Recipient
LimnoTech
2013 Fiscal Year Funding Amount
$59,116
Fund Source

The MPCA has selected the Soil and Water Assessment Tool (SWAT) watershed model to simulate watershed hydrology and water quality to assess various restoration scenarios in the Little Cannon River watershed. The SWAT model is an important tool in developing an understanding of existing conditions and simulating conditions under various management scenarios to inform the development of implementation strategies and plans to restore and protect streams and lakes.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$100,000
Fund Source
The goal of this project is to construct, calibrate, and validate a watershed model using HSPF modeling.
Marshall
Recipient
Houston Engineering Inc
2017 Fiscal Year Funding Amount
$26,477
Fund Source

This project will address Minnesota Pollution Control Agency (MPCA), United States Environment Protection Agency (EPA), and public comments on draft Total Maximum Daily Load (TMDL) studies and Watershed Restoration and Protection Strategy (WRAPS) reports, preliminary draft TMDL studies, and public noticed TMDL studies and WRAPS reports for the Lower Red River Watershed and the Lake of the Woods Watershed and produce final versions of the TMDL studies and WRAPS reports for each watershed.

Kittson
Lake of the Woods
Marshall
Roseau
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$29,730
Fund Source

Refinement of the Sediment Recution Strategy through incorporation of feedback gather during 30-day comment period.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carver
Chippewa
Cottonwood
Dakota
Dodge
Douglas
Faribault
Freeborn
Goodhue
Grant
Hennepin
Hubbard
Isanti
Itasca
Jackson
Kandiyohi
Lac qui Parle
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$49,999
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program – FORTRAN (HSPF) watershed models in the Red Lake River, Thief River, Clearwater River and Red Lake watersheds.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Emmons & Olivier Resources, Inc.
2019 Fiscal Year Funding Amount
$105,777
Fund Source

The goal of this project is to development a Total Maximum Daily Load (TMDL) study that addresses all of the non-mercury-related impaired reaches along the Red River of the North (RRN). The TMDL study will provide an analytical and strategic foundation for recommending restoration strategies for impaired waters. This phase of the project will also include civic engagement efforts by providing water quality framework and stakeholder activities for civic/citizen engagement and communication.

Clay
Kittson
Marshall
Norman
Polk
Wilkin
Recipient
RESPEC
2015 Fiscal Year Funding Amount
$99,999
Fund Source

The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.

Beltrami
Kittson
Lake of the Woods
Marshall
Roseau
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$9,998
Fund Source

The goal of this project is to update the time series and calibration for the Sandhill River Hydrological Simulation Program – FORTRAN (HSPF) model.

Mahnomen
Norman
Polk
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
RESPEC
2015 Fiscal Year Funding Amount
$100,000
Fund Source
Continue and finalize watershed models using Hydrologic Simulation Program FORTRAN (HSPF) for the Grand Marais Creek and Snake River Watersheds and complete the calibration/validation process.
Marshall
Pennington
Polk
Red Lake
Recipient
RESPEC
2017 Fiscal Year Funding Amount
$24,984
Fund Source

The goal of this project is to extend, calibrate, and validate the existing Hydrological Simulation Program FORTRAN (HSPF) model for the Snake River Watershed in the Red River Basin. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Marshall
Pennington
Polk
Recipient
Pine Ridge Estates Landowners Assn.
2018 Fiscal Year Funding Amount
$10,000
Fund Source

Construct new well, seal emergency well and create and distribute education material

Roseau
Recipient
Houston Engineering
2013 Fiscal Year Funding Amount
$33,096
Fund Source

This project will finalize the Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The consultant will produce an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Beltrami
Marshall
Pennington
Roseau
Recipient
Tetra Tech Inc
2019 Fiscal Year Funding Amount
$19,943
Fund Source

The primary objective of this project is to extend the simulation period of the Two Rivers Watershed Hydrological Simulation Program FORTRAN (HSPF) model through 2017 to support future simulation and assessment of the planned Klondike impoundment.

Kittson
Marshall
Roseau
Recipient
Tetra Tech
2019 Fiscal Year Funding Amount
$58,434
Fund Source

This project is the second phase of updating the Two Rivers watershed Hydrologic Simulation Program FORTRAN (HSPF) model. This project includes calibration of the model and including a proposed impoundment in the model. An analysis of possible downstream water quality impacts will also be done.

Kittson
Marshall
Roseau
Recipient
Metropolitan Council/CDM Smith
2014 Fiscal Year Funding Amount
$54,694
2015 Fiscal Year Funding Amount
$42,006
Fund Source

The Metropolitan Council, in conjunction with CDM Smith and HKGi consultants, reorganized and expanded the water conservation tools on the water supply planning pages of the Metropolitan Council’s website. The revised toolbox was organized into an online, web-based guide format. These tools are supplemented with fact sheets and case studies that serve to educate and provide useful information to support water conservation programs and activities.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
LimnoTech
2017 Fiscal Year Funding Amount
$62,622
Fund Source

The goal of this project is to test the sensitivity of the Zumbro River Watershed Hydrological Simulation Program FORTRAN (HSPF) model management scenario results. Additional goals are to develop Total Maximum Daily Loads (TMDLs) for impaired stream reaches and Rice Lake, which will be documented in a TMDL Report. The consultant will apply the existing calibrated and validated Zumbro River Watershed HSPF model to construct load duration curves to develop TMDLs.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha
Recipient
LimnoTech
2019 Fiscal Year Funding Amount
$59,532
Fund Source

In previous phases of work, a Hydrologic Simulation Program FORTRAN (HSPF) model of the Zumbro River Watershed was developed to simulate hydrology and water quality for the 1995-2009 simulation period (Phase I), applied to evaluate various management scenarios for reducing sediment and nutrient loading (Phase II), and used to develop Total Maximum Daily Loads (TMDLs) for impaired stream segments and inform development of a nutrient TMDL for Rice Lake (Phase III).

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha