Minnesota's Legacy

All Projects

Showing 1 - 40 of 131 | Export projects
Recipient
Middle-Snake-Tamarac Rivers WD
2018 Fiscal Year Funding Amount
$144,000
Fund Source
Polk
Recipient
International Water Institute
2013 Fiscal Year Funding Amount
$56,031
Fund Source

The goal of this project is to collect data, water chemistry and field parameters, which will be paired with biological data collected by the MPCA to assess water quality conditions at seven sites along targeted reaches within the Snake River Watershed and five sites in the Two River Watershed.

Kittson
Marshall
Pennington
Polk
Roseau
Recipient
Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Kanabec County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$112,265
2013 Fiscal Year Funding Amount
$2,000
2012 Fiscal Year Funding Amount
$3,000
Fund Source

This project will be a complete TMDL report for the Biota and Bacteria (E. coli) impairments for the Ann River Watershed. The water bodies associated with these impairments will then be removed from the MPCA’s impaired waters list, and implementation activities to restore the water bodies will begin.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
West Polk SWCD
2013 Fiscal Year Funding Amount
$208,610
Fund Source

The Red Lake River is impaired for turbidity. It is also the drinking water source for residents living in East Grand Forks. Burnham Creek is a tributary to the Red Lake River and its watershed is well known for its intensive agriculture, flat topography and frequent flooding. Over the last 20 years, head cutting of the bottom of the channel has led to bank failures, flow restrictions, sedimentation and constriction of fish passage. Soil loss from this is approximately 117 tons per year.

Polk
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Science Museum of Minnesota
2015 Fiscal Year Funding Amount
$36,927
Fund Source

The data collected in this workplan is the foundation for an accurate TMDL allocation and accurate implementation strategy design. Current and historic phosphorus inputs will be calculated and evaluated as to source. Nutrient and algal history and trends in sedimentation will be reconstructed to identify ecological changes that have occurred in the lakes both recently and historically.

Carlton
Pine
Recipient
Carlton County Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$130,055
Fund Source

The goal of this project is to develop and complete the Watershed Restoration and Protection (WRAP) process and report, while also enlarging and sustaining a public participation process that encourages local ownership of water quality problems and solutions (civic engagement).

Carlton
Pine
St. Louis
Recipient
Washington Conservation District
2012 Fiscal Year Funding Amount
$14,142
Fund Source

This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Washington Conservation District
2010 Fiscal Year Funding Amount
$103,598
Fund Source

Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Pine SWCD
2013 Fiscal Year Funding Amount
$115,000
Fund Source

Pine Soil and Water Conservation District is partnering with the City of Sturgeon Lake to seal over 50% of the unused wells in the city limits. The City of Sturgeon Lake recently installed a municipal water supply system, and completed a Minnesota Department of Health approved Wellhead Protection Plan. Residents have connected to the new public water supply system and need to seal their unused wells.

Pine
Recipient
Red Lake Watershed District
2014 Fiscal Year Funding Amount
$185,473
2016 Fiscal Year Funding Amount
$100,000
Fund Source

The overall goal is to develop a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study that will address water quality impairments and maintain or improve water quality throughout the Clearwater River watershed. The study will identify sources of pollutants to the streams and lakes, allocate pollution reduction goals, and prioritize and identify implementation strategies to maintain or improve water quality in key lakes and streams in the watershed.

Beltrami
Clearwater
Mahnomen
Pennington
Polk
Red Lake
Recipient
Metropolitan Council/Environmental Financial Group Inc.
2010 Fiscal Year Funding Amount
$11,785
2011 Fiscal Year Funding Amount
$36,754
Fund Source

On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.

Aitkin
Anoka
Becker
Beltrami
Benton
Big Stone
Blue Earth
Brown
Carlton
Carver
Cass
Chippewa
Chisago
Clay
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Faribault
Fillmore
Freeborn
Goodhue
Grant
Hennepin
Houston
Hubbard
Isanti
Itasca
Jackson
Kanabec
Kandiyohi
Kittson
Koochiching
Lac qui Parle
Lake
Lake of the Woods
Le Sueur
Lincoln
Lyon
Mahnomen
Marshall
Martin
McLeod
Meeker
Mille Lacs
Morrison
Mower
Murray
Nicollet
Nobles
Norman
Olmsted
Otter Tail
Pennington
Pine
Pipestone
Polk
Pope
Ramsey
Red Lake
Redwood
Renville
Rice
Rock
Roseau
Scott
Sherburne
Sibley
St. Louis
Statewide
Stearns
Steele
Stevens
Swift
Todd
Traverse
Wabasha
Wadena
Waseca
Washington
Watonwan
Wilkin
Winona
Wright
Yellow Medicine
Recipient
Pine SWCD
2015 Fiscal Year Funding Amount
$63,400
Fund Source

This project will address impairments in the St. Croix, Kettle and Snake River Watersheds by reducing sediment and phosphorus delivery by encouraging private forest landowners within the St. Croix River Watershed in Pine County to re-establish riparian forest buffers, maintain existing riparian buffers and plant de-forested areas. It will develop a forest stewardship program and write forest stewardship plans in watersheds with the highest risk of impacts on water quality as listed by the Minnesota Forest Resources Council. This project will implement measures to achieve the St.

Pine
Recipient
Pine SWCD
2015 Fiscal Year Funding Amount
$48,800
Fund Source

This project will improve water quality, reducing phosphorus annually by 1,842 in the St. Croix, Kettle and Snake River Watersheds in Pine County by establishing cover crops to reduce erosion and phosphorus/fertilizer applications, increase soil fertility, permeability, and microbe activity. A no-till drill will be purchased for use by agricultural producers for installing cover crops as a means of decreasing soil erosion, reducing phosphorus and fertilizer applications and increasing soil health.

Pine
Recipient
Pine Soil and Water
2013 Fiscal Year Funding Amount
$35,000
Fund Source

These projects will improve water quality by reducing the sediment and phosphorus delivery to the Kettle and St. Croix River Watersheds and engage and educate municipalities and the public regarding the water quality benefits of shoreline buffers and rain gardens. Phosphorus and sediment delivery to the Kettle River from stormwater runoff at Robinson Park in the City of Sandstone will be reduced by the establishment of a native buffer and repair of the river bank by installing soil wraps implanted with deep rooted native species.

Pine
Recipient
Randy S. Ferrin
2011 Fiscal Year Funding Amount
$4,997
Fund Source

The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Chisago County
2012 Fiscal Year Funding Amount
$5,651
Fund Source

Chisago County will coordinate up to three community dialogue meetings to inform its water planning decisions. The goal of the meetings will be to provide safe, productive and effective venues for citizens to become authentically engaged in the water planning process. The outcome of this Civic engagement work with Chisago County and their county water planning process will be a more engaged public in the County Water Planning Process.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Chisago Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$196,079
Fund Source

This project will support the necessary activities for improving the water quality and biological community by reducing nutrients, sediment levels and managing in-stream habitat within the Goose Creek 10-digit HUC Watershed. This restoration and protection plan will identify pollutant load reduction estimates and management strategies that will be used to obtain the TMDL goals outlined in the plan.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
RESPEC
2012 Fiscal Year Funding Amount
$67,972
Fund Source

This project will construct three watershed framework models built using the Hydrologic Simulation Program FORTRAN. These executable models will simulate hydrology at the 12-digit HUC subbasin scale. An HSPF model will be built for each of the following 8-HUC watersheds: Red Lake River (09020303) and the Clearwater River (09020305).

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$94,683
Fund Source

This project will complete a Watershed Restoration and Protection Plan for the Lower St. Croix River that provides quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for all impairments within the watershed, and that are understood and adoptable by local units of government and other stakeholders.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Kanabec Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$31,398
Fund Source

This project will develop and organize a first- stage civic infrastructure pilot in Kanabec County, within the membership of the PICKM (Pine, Isanti, Chisago, Kanabec, and Mille-Lacs) Alliance, and with other organizations in the St. Croix Basin. The work will be grounded in the need for sustainable citizen engagement in water quality management. Civic leaders participating in this project will build their own skills for organizing people and working in partnership with Kanabec County SWCD staff and the St. Croix Basin Team to achieve water quality goals.

Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Red Lake Watershed District (RLWD)
2011 Fiscal Year Funding Amount
$150,000
2013 Fiscal Year Funding Amount
$109,900
Fund Source

This project Phase will collect data, background information, and watershed characteristics within the Red Lake River watershed. This information will be documented within the framework of early draft TMDL Reports (with background information, but no load calculations) for impaired reaches within this watershed and early draft protection plans for the areas in the watershed that are not currently impaired.

Beltrami
Clearwater
Marshall
Pennington
Polk
Red Lake
Recipient
Sand Hill River Watershed District
2011 Fiscal Year Funding Amount
$178,139
Fund Source

This first phase of project will define the existing watershed conditions; identify gaps in existing data; design and implement a plan to address data gaps; incorporate gap data into watershed description; guide development of the HSPF model; establish citizen advisory, technical advisory and locally-based focus groups; research and design an education and outreach strategy; and design and deploy the tools and methods to employ the strategy.

Mahnomen
Norman
Polk
Recipient
Chisago Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$196,600
Fund Source

TMDL project in the Chisago Lakes Lake Improvement District that will develop a watershed based plan and provide strategies for water quality and aquatic ecosystem management, restoration, and protection within Sunrise River Watershed. This project will also aid in understanding the Phosphorus loading to Lake St. Croix.

Anoka
Chisago
Isanti
Pine
Washington
Recipient
Snake River Watershed Management Board
2010 Fiscal Year Funding Amount
$171,766
Fund Source

The Snake River Watershed Management Board (SRWMB), working in concert with other local governmental units in within the watershed, will assist the MPCA, the project consultant, and other members of the Snake River Watershed Total Maximum Daily Load (TMDL) technical team in the completion of tasks associated with this TMDL project. SRWMB, with assistance from members of the technical team (Kanabec Soil and Water Conservation District (SWCD), Pine SWCD, Aitkin SWCD, and Mille Lacs SWCD) will provide the services to complete this TMDL project.

Aitkin
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Kanabec Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$201,992
Fund Source

This project will provide baseline data through water monitoring, recording and analyzing the results of six unassessed rivers/tributaries, three unassessed lakes and five storm water outlets in the city of Mora which drain to the Snake River; promote and implement approved BMP’s.

Anoka
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Washington
Recipient
Carnelian-Marine-St. Croix Watershed District
2013 Fiscal Year Funding Amount
$132,000
Fund Source

Implementation activities proposed as a part of this project include water quality monitoring, biotic surveys, sediment core sampling, mechanical treatment of curly-leaf pondweed (in accordance with regulations and permitting), an iron-enhanced sand filter, with a high capacity multi-stage outlet weir and 40,000 pounds of iron filings and stakeholder involvement in the design process and educational presentations.

Anoka
Chisago
Isanti
Pine
Ramsey
Washington
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$86,020
Fund Source

Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.

Carlton
Pine
St. Louis
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$36,342
Fund Source

This project will complete a TMDL equation and report and an implementation plan for Deer Creek. The TMDL report will describe turbidity impacts to aquatic life uses of Deer Creek, correlate turbidity to other pollutants (sediment, suspended solids, etc.), describe and quantify unique turbidity/sediment stressors which include groundwater influences, legacy impacts of the watershed and stream channel, significant in-stream and near stream sources (slumps, bank erosion, etc.) and upland contributions.

Carlton
Pine
St. Louis
Recipient
Carlton County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$244,435
Fund Source

This project will result in the development of a Total Maximum Daily Load (TMDL) for turbidity for Deer Creek and the Nemadji River, and will also define which reaches of the Nemadji basin may be meeting standards for turbidity. It will also allow the Carlton County Soil & Water Conservation District (SWCD) to become a full and active partner in this TMDL study and implementation project as well as future restoration and protection projects.

Carlton
Pine
Recipient
Carlton County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$70,055
Fund Source

This project will support Minnesota's condition monitoring strategy through the collection of water quality data on streams and rivers in the Nemadji River watershed. The Nemadji River watershed is located in southeastern Carlton County and northeastern Pine County. Water quality samples will be collected primarily during weather-related events that affect stream flow such as snowmelt and rainfalls.

Carlton
Pine
St. Louis
2019 Fiscal Year Funding Amount
$250,000
2018 Fiscal Year Funding Amount
$250,000
2017 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Minnesota DNR and the Minnesota Forest Resources Council work with forest landowners, managers and loggers to implement a set of voluntary sustainable forest management guidelines that include water quality best management practices (BMPs) to ensure sustainable habitat, clean water, and productive forest soils, all contributing to healthy watersheds. This project will monitor the implementation of these forest management guidelines and BMPs on forested watersheds in MN.

Fillmore
Goodhue
Wabasha
Winona
Carlton
Houston
Koochiching
Lake of the Woods
Mahnomen
Olmsted
Otter Tail
Pine
Roseau
Stearns
Todd
Wadena
Aitkin
Anoka
Becker
Beltrami
Benton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Lake
Mille Lacs
Morrison
Sherburne
St. Louis
Recipient
Fosston, City of
2012 Fiscal Year Funding Amount
$75,362
Fund Source

Construct wastewater treatment improvements to meet phosphorus discharge requirements

Polk
Recipient
Board of Water & Soil Resources
2012 Fiscal Year Funding Amount
$600,000
2013 Fiscal Year Funding Amount
$397,580
Fund Source

BWSR will administer funding to eligible County projects that provide funds and other assistance to low income property owners to upgrade or replace Noncompliant Septic Systems. BWSR will also manage annual reporting completed by each County.

Aitkin
Beltrami
Big Stone
Carlton
Carver
Cass
Chippewa
Chisago
Clearwater
Cook
Cottonwood
Crow Wing
Dakota
Dodge
Douglas
Hubbard
Isanti
Jackson
Kandiyohi
Koochiching
Lac qui Parle
Lake of the Woods
Lincoln
Marshall
McLeod
Morrison
Norman
Olmsted
Pennington
Pine
Pipestone
Polk
Pope
Red Lake
Roseau
Scott
Sibley
St. Louis
Stearns
Steele
Todd
Traverse
Wadena
Waseca
Washington
Wilkin
Winona
Yellow Medicine
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$49,986
Fund Source

The goal of this project is to continue and finalize Hydrologic Simulation Program FORTRAN (HSPF) watershed model construction and complete the calibration/validation process. The project will add representation of point source discharges to the model, compile flow and water quality data for the purposes of calibration and validation. The end result will be an HSPF watershed model that can readily be used to provide information to support conventional parameter TMDLs.

Mahnomen
Norman
Polk
Recipient
Barr Engineering
2013 Fiscal Year Funding Amount
$39,121
Fund Source

The goal of this project is to supplement and refine the Deer Creek Watershed TMDL Report and Implementation Plan project with detailed determinations of critical source areas and prioritization of the associated management practices, facilitated by additional meetings with local resource managers and validated with a field survey. Completed work will more fully inform the TMDL report and TMDL implementation plan on critical source areas of sediment and quantify those sources.

Carlton
Pine
St. Louis
Recipient
Red Lake Watershed District
2013 Fiscal Year Funding Amount
$123,400
Fund Source

This phase of the project will complete the analysis of existing and newly collected water quality data in the Red River of the North-Grand Marais Creek watershed and also verify the impairments on the currently listed reaches and determine the status of the remaining river reaches as being either impaired or currently meeting standards. Stakeholder involvement and public participation will be a primary focus throughout the project.

Marshall
Pennington
Polk
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$99,986
Fund Source

This project will finalize HSPF watershed model construction and complete the calibration/validation process. The consultant will add representation of point source discharges to the model. The consultant will compile flow data for the purposes of calibration and validation. An initial hydrologic calibration will be performed and submitted for approval.

Beltrami
Clearwater
Mahnomen
Marshall
Pennington
Polk
Red Lake