Minnesota's Legacy

All Projects

Showing 1 - 11 of 11 | Export projects
Recipient
St Louis, North SWCD
2016 Fiscal Year Funding Amount
$78,000
Fund Source

The North St. Louis Soil & Water Conservation District will work with lake and resort associations, chambers of commerce, and various community groups to identify 3-6 projects with maximum public benefit. Potential projects include community rain gardens, native vegetative buffers and shoreline restorations that improve water quality by reducing stormwater runoff, cleaning stormwater before it is released to the lakes and retaining water on the land longer.

St. Louis
Recipient
St. Louis County
2016 Fiscal Year Funding Amount
$200,000
Fund Source

St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.

St. Louis
Recipient
Science Museum of Minnesota
2018 Fiscal Year Funding Amount
$52,536
Fund Source

Myrtle Lake experiences frequent nuisance algae blooms and does not meet Minnesota state standards for total phosphorus and chlorophyll-a. This has led to questions whether the productivity and condition of the lake has changed over time, what the natural or historical condition of the lake was, what the current trajectory of the lake is, and how to set effective management goals.

St. Louis
Recipient
Minnesota Department of Natural Resources
2011 Fiscal Year Funding Amount
$140,000
Fund Source

The Minnesota Department of Natural Resources will coordinate the collection of high-resolution elevation data for northeastern portion of Minnesota using Light Detection and Ranging (LIDAR) systems. The geographic area of the work includes Minnesota counties of Carlton, Cook, Lake, and St. Louis Counties and that portion of Koochiching County that comprises Voyageurs National Park.

Carlton
Cook
Koochiching
Lake
St. Louis
Recipient
Koochiching County SWCD
2019 Fiscal Year Funding Amount
$323,695
Fund Source

Koochiching County has seven major watersheds in the county, this contract is for work in five of them: Big Fork, Little Fork, Rapid River, Lower Rainy River, and Rainy River Headwaters. The local Koochiching County Soil and Water Conservation District (SWCD) is positioned to assist in several elements of the Watershed Restoration and Protection Strategies (WRAPS) process. This includes gap monitoring for water chemistry, sediment work, Total Maximum Daily Load (TMDL) development, modeling scenarios, and WRAPS development.

Itasca
Koochiching
St. Louis
Recipient
Koochiching County SWCD
2017 Fiscal Year Funding Amount
$99,930
Fund Source

This project will provide an important framework for civic and citizen engagement and communication in the International Rainy River-Lake of the Woods Watershed, which will contribute to long-term public participation in surface water protection and restoration activities.

Cook
Itasca
Koochiching
Lake
Lake of the Woods
St. Louis
Recipient
Koochiching Soil & Water Conservation District
2016 Fiscal Year Funding Amount
$75,000
2018 Fiscal Year Funding Amount
$51,212
2019 Fiscal Year Funding Amount
$35,756
Fund Source

The goal of this project is to conduct water chemistry monitoring at four subwatershed sites and two basin sites in 2016 and 2017; and six subwatershed sites and three basin sites in 2018-2019 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Koochiching
St. Louis
Recipient
North St. Louis County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$135,994
Fund Source
The goal of this project is the development of the Rainy River Headwaters, Vermilion River and St. Louis River Watersheds Local Civic Engagement and Watershed Restoration and Protection Strategy.
St. Louis
Recipient
Vermilion Community College
2014 Fiscal Year Funding Amount
$149,015
Fund Source

Five locations will be monitored in support of the combined Vermilion Community College and Rainy River Community College 2014 – 2015 MPCA Watershed Pollutant Load Monitoring Network (WPLMN) Sampling Grant. Water samples, field measurements, field images / pictures, and other measurements and observations will be obtained at each location during each sampling event.

Carlton
St. Louis
Recipient
Vermillion Community College
2016 Fiscal Year Funding Amount
$158,108
Fund Source

Five locations will be monitored in support of the combined Vermilion Community College and Rainy River Community College 2016 – 2017 Minnesota Pollution Control Agency (MPCA) Watershed Pollutant Load Monitoring Network (WPLMN) Sampling Agreement. Water samples, field measurements, field images, and other observations will be obtained at each location during each sampling event.

Carlton
St. Louis
Recipient
Vermilion Community College
2017 Fiscal Year Funding Amount
$135,634
Fund Source
Vermilion Community College will assist the Minnesota Pollution Control Agency (MPCA) with meeting the Watershed Restoration and Protection Strategies (WRAPS) development objectives of collecting data and completing watershed assessments for the Rainy River Headwaters, Vermilion River, and Little Fork River watersheds. Services will include providing support for field water monitoring, other field sampling and measurements and related field data management, analysis, and assessments in these watersheds.
Cook
Itasca
Koochiching
Lake
St. Louis