Minnesota's Legacy

All Projects

Showing 1 - 25 of 25 | Export projects
Recipient
Benton SWCD
2017 Fiscal Year Funding Amount
$200,000
Fund Source

This project targets nutrient reductions within the Mayhew and Big Elk Lake watersheds. The Benton Soil and Water Conservation District will work with farmers in implementing a variety of conservation practices including, but not limited to cropland erosion control projects, riparian pasture management, and nutrient management and feedlot pollution control systems. These strategies were identified through Total Daily Maximum Load Studies.

Benton
Sherburne
Recipient
Elk River Watershed Association
2017 Fiscal Year Funding Amount
$182,500
Fund Source

A completed Total Maximum Daily Load (TMDL) study has identified mid to late summer phosphorus loading as a significant stressor to lakes and streams within the Big Elk Lake watershed. While this comprehensive study serves its role as the unifying document that identifies pollutants and sources, further work is required in order to develop site-specific Best Management Practices, design these practices, and oversee their implementation in order to reach clean water goals.

Benton
Sherburne
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Sherburne SWCD
2016 Fiscal Year Funding Amount
$70,005
Fund Source

The funds requested will provide Big Lake Township with the technical and financial assistance necessary to retrofit up to six locations for stormwater treatment practices within the direct drainage area of Birch Lake, an impaired water body which is very close to meeting state standards. The projects have been identified as high priority in several water quality plans including a TMDL, a subwatershed assessment, the County Water Plan and the Mississippi River (St. Cloud) WRAPS.

Sherburne
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$86,250
Fund Source

The Briggs Lake Chain Association (BLCA) is one of Sherburne County's most proactive lake associations. This sub-grant will provide for approximately 20-30 stormwater reduction best management practices on strategically targeted parcels previously identified as contributing to degraded water quality through Total Maximum Daily Loads, aerial lakeshore analysis and site-reviews conducted by the BLCA.

Sherburne
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$60,000
Fund Source

The Elk River Watershed Association Joint Powers Board, via the Sherburne Soil and Water Conservation District, will utilize project funds to implement a pasture and manure management program which will provide technical and financial assistance to large animal/hobby farm owners. Staff will work with identified landowners to implement bacteria reduction best practices such as pasture renovation/management, riparian buffer strips, clean water diversions, vegetated buffer strips, and manure management including composting structures.

Sherburne
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
Sherburne SWCD
2015 Fiscal Year Funding Amount
$28,407
Fund Source

Sherburne Soil and Water Conservation District (SWCD) will subcontract with Clearwater River Watershed District (CRWD) to cooperatively coordinate monitoring of three locations within the Mississippi River (St. Cloud) Watershed. A total of four staff (two from each district) will communicate to ensure that the locations are monitored according to the WPLMN Standard Operating Procedures (SOPs) for AIS and non AIS sites

Sherburne
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
Sherburne SWCD
2018 Fiscal Year Funding Amount
$106,800
Fund Source
Sherburne
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Sherburne SWCD
2016 Fiscal Year Funding Amount
$41,903
2019 Fiscal Year Funding Amount
$9,684
Fund Source

The project goal is to conduct water chemistry monitoring at three subwatershed sites in 2016-2019 and ongoing as needed in 2020 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Sherburne
Wright
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Sherburne SWCD
2014 Fiscal Year Funding Amount
$150,400
Fund Source

This project combines the use of automated soil moisture probes for irrigation scheduling with diverse cover crop planting to reduce or eliminate leaching of nitrogen and other nutrients on cropland with an early season harvested crop in the rotation. The more efficient use of irrigation waters provides a secondary benefit: less withdrawal from the aquifers that provide recharge for the Mt. Simon-Hinckley aquifer.

Sherburne
Recipient
Multiple public water systems
2013 Fiscal Year Funding Amount
$250,000
2015 Fiscal Year Funding Amount
$250,000
2016 Fiscal Year Funding Amount
$113,000
2018 Fiscal Year Funding Amount
$250,000
Fund Source

Approximately 70 percent of all Minnesotans rely on groundwater as their primary source of drinking water. Wells used for drinking water must be properly sealed when removed from service to protect both public health and Minnesota’s invaluable groundwater resources. The Minnesota Department of Health protects both public health and groundwater by assuring the proper sealing of unused wells.
Clean Water funds are being provided to well owners as a 50% cost-share assistance for sealing unused public water-supply wells.

Anoka
Beltrami
Benton
Big Stone
Blue Earth
Cook
Crow Wing
Dakota
Dodge
Faribault
Fillmore
Hennepin
Lyon
McLeod
Morrison
Mower
Olmsted
Rice
Sherburne
Sibley
St. Louis
Stearns
Steele
Swift
Todd
Waseca
Washington
Watonwan
Winona
Wright
Recipient
Sherburne Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$79,062
Fund Source

This project will conduct the second round of Intensive Watershed Monitoring (IWM) for the Mississippi River St. Cloud watershed. Partnering organizations intend to complete sampling of lakes and streams following the protocols and guidance set forth by the Minnesota Pollution Control Agency (MPCA). Watershed partners include Benton Soil and Water Conservation District (SWCD), Clearwater Watershed District, Sherburne SWCD, Stearns SWCD, Stearns County staff, and Wright SWCD.

Benton
Sherburne
Stearns
Wright
Recipient
LimnoTech
2012 Fiscal Year Funding Amount
$3,810
2011 Fiscal Year Funding Amount
$46,430
Fund Source

This project will complete a chloride management plan which will lay out a strategy for addressing chloride impacts to our surface waters for the 7-county metropolitan area. This chloride management plan will satisfy EPA requirements for impaired waters, address waters not yet listed, and develop a strategy to protect waters that are currently meeting the water quality standards.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Fortin Consulting
2011 Fiscal Year Funding Amount
$63,946
2013 Fiscal Year Funding Amount
$42,000
2014 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide the MPCA and all local partners in the Twin Cities Metropolitan Area (TCMA) the information and tools necessary to improve and/or maintain water quality with respect to chloride for the 7-county metropolitan area during the winter maintenace period.

Anoka
Carver
Dakota
Hennepin
Ramsey
Scott
Washington
Recipient
Minnesota Department of Natural Resources
2013 Fiscal Year Funding Amount
$450,000
Fund Source

The goal of this project is to assess groundwater sustainability in the I-94 corridor between the Twin Cities and St. Cloud due to the corridor's significant expected growth, the inerent natural limits of groundwater, and the vulnerability of groundwater to contamination.

Benton
Carver
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Sherburne
Stearns
Wright
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$53,000
Fund Source

This project will provide the monitoring of reaches where there are data gaps, incorporate new data and analyze relevant data, identify pollutant sources, hold a stakeholder meeting, and gather information towards the future development of a Draft Restoration (TMDL) and Protection Plan.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Carver
Cass
Chisago
Clearwater
Crow Wing
Douglas
Hennepin
Hubbard
Isanti
Itasca
Kanabec
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Otter Tail
Pope
Renville
Sherburne
Sibley
Stearns
Todd
Wadena
Wright
Recipient
Emmons and Olivier Resources, Inc.
2011 Fiscal Year Funding Amount
$95,999
Fund Source

This project will support the monitoring of reaches where there are data gaps, incorporate new data and relevant data, continue identification of pollutant sources, complete load duration curves, coordinate and encourage participation in stakeholder meetings. The information gathered during Phase IIB will be utilized towards the development of a Draft Restoration (TMDL) and Protection Plan (Plan).

Aitkin
Anoka
Benton
Carver
Chisago
Crow Wing
Dakota
Douglas
Hennepin
Isanti
Kanabec
Kandiyohi
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pope
Ramsey
Renville
Scott
Sherburne
Sibley
Stearns
Todd
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Itasca
Mille Lacs
Morrison
Otter Tail
Pine
Sherburne
St. Louis
Stearns
Todd
Wadena