Minnesota's Legacy

All Projects

Showing 1 - 27 of 27 | Export projects
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$89,967
Fund Source

This project will construct, calibrate, and validate an HSPF watershed model for the Lake of the Woods River watershed. The consultants will produce HSPF watershed models that can readily be used to provide information to support conventional parameter TMDLs. The consultants will clearly demonstrate that the models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen that are consistent with available sets of observed data.

Lake of the Woods
Roseau
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$249,932
Fund Source

This project will construct, calibrate, a set of HSPF watershed models covering the entire area of the Lake of the Woods drainage, including the Rainy River watershed. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output timeseries for hydrology which are consistent with available sets of observed data.

Koochiching
Lake of the Woods
Roseau
St. Louis
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$86,020
Fund Source

Deer Creek has been identified as an impaired water body. This project will quantify the reductions in pollutant loading that would be necessary to bring water quality in the creek to an acceptable level. The project also includes collection of any additional data needed for stream channel modeling scenarios.

Carlton
Pine
St. Louis
Recipient
Carlton County Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$244,435
Fund Source

This project will result in the development of a Total Maximum Daily Load (TMDL) for turbidity for Deer Creek and the Nemadji River, and will also define which reaches of the Nemadji basin may be meeting standards for turbidity. It will also allow the Carlton County Soil & Water Conservation District (SWCD) to become a full and active partner in this TMDL study and implementation project as well as future restoration and protection projects.

Carlton
Pine
Recipient
Tetra Tech
2016 Fiscal Year Funding Amount
$93,637
Fund Source

The goal of this project is to construct, calibrate, and validate one fine-scale Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Duluth Watershed Restoration and Protection Strategy (WRAPS) project area for the simulation period 1995–2012. In addition, an existing condition (post-2012 flood) model scenario will be developed for use in WRAPS development. The contractor will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs.

Carlton
St. Louis
Recipient
University of Minnesota
2012 Fiscal Year Funding Amount
$175,000
2013 Fiscal Year Funding Amount
$175,000

PROJECT OVERVIEW

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Cook
Crow Wing
Hubbard
Itasca
Koochiching
Lake
Lake of the Woods
Mahnomen
Marshall
Morrison
Otter Tail
Pennington
Pine
Polk
Red Lake
Roseau
St. Louis
Todd
Wadena
Recipient
Carlton County Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$70,055
Fund Source

This project will support Minnesota's condition monitoring strategy through the collection of water quality data on streams and rivers in the Nemadji River watershed. The Nemadji River watershed is located in southeastern Carlton County and northeastern Pine County. Water quality samples will be collected primarily during weather-related events that affect stream flow such as snowmelt and rainfalls.

Carlton
Pine
St. Louis
Recipient
Tetra Tech
2013 Fiscal Year Funding Amount
$174,990
Fund Source

The goal of this project is to construct, calibrate, and validate three HSPF watershed models. The project will result in HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The models are expected to generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

St. Louis
Pine
Lake
Itasca
Carlton
Aitkin
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The goal of this project is to complete the calibration/validation process of Hydrologic Simulation FORTRAN (HSPF) watershed models for the Lake of the Woods/Rainy River Basin.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
Tetra Tech
2014 Fiscal Year Funding Amount
$90,000
Fund Source

The goal of this project is to finalize HSPF watershed models for the St. Louis, Cloquet, and Nemadji Rivers.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
Tetra Tech
2015 Fiscal Year Funding Amount
$110,000
Fund Source

Construct, calibrate and validate 3 Hydrologic Simulation Program FORTRAN (HSPF) watershed models for the St Louis, Cloquet, and Nemadji River Watersheds.

Aitkin
Carlton
Itasca
Pine
St. Louis
Recipient
AQUA TERRA Consultants
2015 Fiscal Year Funding Amount
$199,999
Fund Source
Construct, calibrate, and validate three Hydrologic Simulation Program FORTRAN (HSPF) watershed models that can readily be used to provide information to support conventional parameter Total Maximum Daily Loads (TMDLs).
Aitkin
Carlton
Chisago
Isanti
Kanabec
Mille Lacs
Pine
Recipient
Wenck Associates, Inc.
2019 Fiscal Year Funding Amount
$187,625
Fund Source

The purpose of this work is to develop Total Maximum Daily Loads (TMDLs; a federal clean Water Act requirement) for streams and lakes in the Kettle River and Upper St. Croix watersheds. This and other technical information will be used to develop a separate report called a Watershed Restoration and Protection Strategy (WRAPS) report.

Aitkin
Carlton
Kanabec
Pine
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$96,888
Fund Source

This project will complete the Total Maximum Daily Load (TMDL) study and Watershed Restoration and Protection Strategies (WRAPS) for the Lake Superior North watershed. Two segments of the Flute Reed River are impaired for aquatic life due to elevated turbidity and total suspended solids. The lower Poplar River is also listed as impaired but significant progress has occurred in the last 10 years. A TMDL and implementation plan have been completed for the lower Poplar River impairment. All other waters meet water quality standards and will be considered for protection measures.

Cook
Lake of the Woods
Recipient
Science Museum of Minnesota - St. Paul
2014 Fiscal Year Funding Amount
$150,026
Fund Source
The purpose of this project is to gain an understanding of modern and historical nutrient and thermal dynamics in Lake of the Woods using modeling, monitoring, sediment core analysis, and whole basin techniques.
Lake of the Woods
Recipient
Lake of the Woods SWCD
2015 Fiscal Year Funding Amount
$305,620
2016 Fiscal Year Funding Amount
$66,412
2017 Fiscal Year Funding Amount
$47,202
Fund Source

The Lake of the Woods (LOW) Total Maximum Daily Load (TMDL) study will: (1) identify water quality goals for the Minnesota portions of the LOW/Rainy River Watershed; (2) recommend nutrient allocations to achieve TMDLs where waters do not meet standards; and (3) provide opportunities for stakeholders to engage in the process of watershed-management planning to adopt protection and restoration strategies. The project will include existing in-lake and watershed model updates, TMDL component development, restoration plan development, and public participation.

Lake of the Woods
2014 Fiscal Year Funding Amount
$0
2013 Fiscal Year Funding Amount
$1,350,000
2012 Fiscal Year Funding Amount
$1,350,000
2011 Fiscal Year Funding Amount
$2,800,000
2010 Fiscal Year Funding Amount
$2,800,000
Fund Source

This project will create a high accuracy elevation dataset - critical for effectively planning and implementing water quality projects - for the state of Minnesota using LiDAR (Light Detection and Ranging) and geospatial mapping technologies. Although some areas of the state have been mapped previously, many counties remain unmapped or have insufficient or inadequate data. This multi-year project, to be completed in 2012, is a collaborative effort of Minnesota's Digital Elevation Committee and partners with county surveyors to ensure accuracy with ground-truthing.

Anoka
Benton
Carlton
Carver
Cook
Dakota
Goodhue
Hennepin
Isanti
Kanabec
Lake
Meeker
Mille Lacs
Morrison
Ramsey
Scott
Sherburne
St. Louis
Washington
Recipient
MN DNR
2012 Fiscal Year Funding Amount
$100,000
2013 Fiscal Year Funding Amount
$100,000

PROJECT OVERVIEW

Lake of the Woods
Recipient
RESPEC
2015 Fiscal Year Funding Amount
$99,999
Fund Source

The goal of this project is to construct, calibrate and validate a watershed model using Hydologic Simulation Program FORTRAN (HSPF) for the Roseau River Watershed.

Beltrami
Kittson
Lake of the Woods
Marshall
Roseau
Recipient
U.S. Army Corps of Engineers (USACE) & U.S. Environmental Protection Agency (USEPA)
2010 Fiscal Year Funding Amount
$750,000
Fund Source

This project will provide technical, planning and engineering assistance to the MPCA for the development and implementation of the St. Louis River Remedial Action Plan (RAP). USACE and USEPA in partnership with the MPCA will administer work plans to complete a sediment assessment for Minnesota areas within Superior Bay, St. Louis Bay, Lower St. Louis River and the Upper St. Louis River, encompassing approximately 5,349 acres of the St. Louis River and Estuary.

Carlton
Lake
St. Louis
Recipient
U.S. Army Corps of Engineers (USACE)
2012 Fiscal Year Funding Amount
$163,100
Fund Source

This project will provide a protocol for prioritizing sites in the St. Louis Area of Concern (AOC ) for restoration based on site-specific bioavailability considerations. Despite large data collection efforts focused on sediment chemistry, the extent to which sediment with moderate levels of contamination is available for uptake into biota and therefore contributing to Beneficial Use Impairments (BUI)s is still largely unknown.

St. Louis
Lake
Carlton
Recipient
Carlton County Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$11,770
Fund Source

The goal of this project is to collect updated lake water quality data for the lakes in the Tamarack River chain to feed Hydrologic Simulation Program FORTRAN (HSPF) modeling during the MPCA Watershed Monitoring program scheduled for 2015, and allow for better targeting of issues and lakes for implementation of clean water practices.

Carlton
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$68,505
Fund Source

This project will extend the simulation period for the Hydrological Simulation Program - FORTRAN (HSPF) models for the Grand Rapids, Brainerd, Crow Wing, Redeye, Long Prairie, Sartell, Sauk, St. Cloud, and Crow watersheds, and review and comment on the calibration.

Aitkin
Becker
Benton
Carlton
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Itasca
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Otter Tail
Pope
Sherburne
St. Louis
Stearns
Todd
Wadena
Wright
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$134,960
Fund Source

The primary goal of this project is to examine the calibration and validation of recently extended Hydrological Simulation Program – FORTRAN (HSPF) watershed models for the Mississippi River-Headwaters, Mississippi River-Grand Rapids, Mississippi River-Brainerd, Mississippi River-Sartell, Mississippi River-St. Cloud, Leech Lake, Pine River, Crow Wing River, Long Prairie River, and Redeye River watersheds and revise the calibration.

Aitkin
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Itasca
Mille Lacs
Morrison
Otter Tail
Pine
Sherburne
St. Louis
Stearns
Todd
Wadena
Recipient
RESPEC
2016 Fiscal Year Funding Amount
$79,972
Fund Source

The goal of this project is to calibrate, and validate three watershed models using the Hydrological Simulation Program FORTRAN (HSPF) model. The contractor will produce HSPF watershed models that can be further developed to provide information to support conventional parameter TMDLs. The contractor will clearly demonstrate that the models generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Aitkin
Carlton
Itasca
Kanabec
Mille Lacs
Pine