Minnesota's Legacy

All Projects

Showing 1 - 35 of 35 | Export projects
Recipient
Minnesota Pollution Control Agency
2018 Fiscal Year Funding Amount
$700,000
Hennepin
Ramsey
Recipient
Emmons and Olivier Resources, Inc
2018 Fiscal Year Funding Amount
$17,448
Fund Source

Bartlett Lake in Koochiching County is impaired for eutrophication and has already undergone a paleolimnological study. This project will utilize the data and results of paleolimnological study to develop in-lake management strategies that, if implemented, could significantly improve the water quality of Bartlett Lake.

Koochiching
Recipient
Blue Earth County SWCD
2018 Fiscal Year Funding Amount
$29,929
Fund Source

The Blue Earth SWCD will be monitoring 7 stream sites located in the Le Sueur River Watershed.  The stream sites will be monitored at the road crossing locations via bridge, culvert or shore.  Onsite conditions will be recorded, water sample readings will be taken for Secchi tube, specific conductance, temperature, pH, DO, and photos taken.  

Blue Earth
Waseca
Recipient
Tetra Tech
2018 Fiscal Year Funding Amount
$49,925
Fund Source
Becker
Clay
Otter Tail
Wilkin
Recipient
Cook County SWCD
2018 Fiscal Year Funding Amount
$120,000
Fund Source

This project is for Watershed Restoration and Protection Strategy (WRAPS) development in the Rainy River Headwaters watershed. The recipient will provide support for outreach and engagement in Rainy River Headwaters and Lake Superior North watersheds. They will also support watershed gap monitoring and Minnesota Pollution Control Agency (MPCA) gage monitoring.

Cook
Recipient
Redwood-Cottonwood Rivers Control Area
2018 Fiscal Year Funding Amount
$100,000
Fund Source

The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.

Lincoln
Lyon
Murray
Pipestone
Redwood
Yellow Medicine
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$99,955
Fund Source

The primary goal of this project is to enhance the current version of the Expert System for Calibration of HSPF (HSPEXP+) so that it can better support hydrology calibration, water quality calibration, report and graph generation. A secondary goal of this project is to modify the Hydrological Simulation Program FORTRAN (HSPF) program so that precipitation additions to streams and lakes contain dissolved oxygen.

Statewide
Recipient
Goodhue County SWCD
2018 Fiscal Year Funding Amount
$21,873
Fund Source

This monitoring effort will focus on collecting chemistry and field data information from six sample locations on Hay Creek, Wells Creek, Bullard Creek and Gilbert Creek in Goodhue County and Miller Creek in Wabasha County within the Mississippi River-Lake Pepin Watershed (MRLP). These streams are typically cold water streams which outlet directly to the Mississippi River or Lake Pepin. This monitoring effort is to assist with the 10-year watershed-monitoring schedule that the Minnesota Pollution Control Agency has placed on major watersheds across the State.

Goodhue
Wabasha
Recipient
Red Lake Watershed District
2018 Fiscal Year Funding Amount
$7,492
Fund Source

The purpose of this project is to prepare a Watershed Restoration and Protection Strategy (WRAPS) Report and Total Maximum Daily Load (TMDL) Study for public notice. This project will include addressing and incorporating Minnesota Pollution Control (MPCA) review comments in both documents. The TMDL Study has been submitted to the United States Environmental Protection Agency (USEPA) for preliminary review. USEPA comments will be addressed prior to public notice.

Marshall
Pennington
Polk
Recipient
Minnesota Pollution Control Agency
2018 Fiscal Year Funding Amount
$400,000
Statewide
Recipient
United States Geological Survey
2018 Fiscal Year Funding Amount
$149,999
Fund Source

The Minnesota Pollution Control Agency (MPCA) has identified streamflow alteration as a key stressor on aquatic life, but the characteristics of streamflow alteration acting as a stressor has not been identified in the MPCA Watershed Restoration and Protection Strategy (WRAPS) process. Without indices that characterize streamflow alteration, the MPCA cannot quantitatively associate metrics of aquatic life condition to streamflow alteration. The lack of quantifiable indices limits the ability of the MPCA to assess environmental streamflow needs for streams and rivers throughout Minnesota.

Statewide
Recipient
Lake of the Woods Water Sustainability Foundation
2015 Fiscal Year Funding Amount
$500
2016 Fiscal Year Funding Amount
$500
2017 Fiscal Year Funding Amount
$500
2018 Fiscal Year Funding Amount
$500
Fund Source

The Minnesota Pollution Control Agency (MPCA) is a co-sponsor and assists with a portion of the financial support for the International Rainy River-Lake of the Woods Watershed Forum.

Cook
Koochiching
Lake
Lake of the Woods
Roseau
St. Louis
Recipient
LimnoTech
2018 Fiscal Year Funding Amount
$75,630
Fund Source

The consultant LimnoTech will support response to Total Maximum Daily Load (TMDL) comments the peer review process, United States Environmental Protection Agency and public notice. They will then revise the TMDL document as needed and attend internal and external project meetings.

Anoka
Carver
Dakota
Dodge
Goodhue
Hennepin
Le Sueur
McLeod
Mower
Nicollet
Olmsted
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Steele
Wabasha
Washington
Wright
Recipient
Koochiching SWCD
2018 Fiscal Year Funding Amount
$81,391
Fund Source

The Little Fork River Watershed Assessment will include the waters of the Rice River, Little Fork River, Flint Creek, Nett Lake River, Beaver Brook, Valley River, Willow River, Sturgeon River, Bear River, Dark River, and the Lost River. This Assessment will also include Little Bear Lake, Bear Lake, Thistledew Lake, Little Moose Lake, Raddison Lake, Napoleon Lake, Owen Lake, Dark Lake, Clear Lake, Long (Main) Lake, Dewey Lake, and Long (North) Lake. These lakes and streams are found throughout the Little Fork River Watershed, which spans parts of Koochiching, St. Louis and Itasca Counties.

Itasca
Koochiching
St. Louis
Recipient
Wild Rice Watershed District
2018 Fiscal Year Funding Amount
$99,994
Fund Source

Phase 2 of the Marsh River Watershed Restoration and Protection Strategy (WRAPS) project includes: continued civic engagement; production of the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; and production of the WRAPS report, which identifies implementation strategies that will maintain or improve water quality in many lakes and streams throughout the watershed.

Clay
Norman
Recipient
Tetra Tech Inc
2018 Fiscal Year Funding Amount
$74,986
Fund Source

This project addresses twelve lakes that have aquatic recreation impairments as identified by eutrophication indicators and 53 impairments on 45 stream reaches in the Minnesota River Mankato and Watonwan River watersheds. The project will develop Total Maximum Daily Loads (TMDLs) addressing impaired lakes and streams in the Minnesota River–Mankato and Watonwan River watersheds. A TMDL establishes the maximum amount of a pollutant allowed in a waterbody and serves as the starting point or planning tool for restoring water quality.

Blue Earth
Brown
Cottonwood
Jackson
Le Sueur
Martin
Nicollet
Redwood
Renville
Sibley
Watonwan
Recipient
Aitkin County SWCD
2018 Fiscal Year Funding Amount
$249,945
Fund Source

Phase 2 of the Mississippi River - Brainerd Watershed Restoration and Protection Strategy (WRAPS) project will: develop the WRAPS report and the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; implement a civic engagement plan; and develop watershed modeling scenarios to help understand implementation needs in the watershed.

Aitkin
Crow Wing
Morrison
Todd
Recipient
Morrison Soil Water Conservation District
2018 Fiscal Year Funding Amount
$225,000
Fund Source

This project will develop a Watershed Restoration and Protection Strategy (WRAPS) report as well as Total Maximum Daily Load (TMDL) studies where needed. The TMDLs will provide the quantitative pollutant load reduction estimates and a set of pollutant reduction and watershed management strategies to achieve water quality standards for the impairments within the watershed. Strategies for protecting the unimpaired waters within the watershed will also be included.

Benton
Crow Wing
Morrison
Stearns
Todd
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$33,940
2015 Fiscal Year Funding Amount
$39,346
2016 Fiscal Year Funding Amount
$47,631
2017 Fiscal Year Funding Amount
$46,084
2018 Fiscal Year Funding Amount
$50,000
Fund Source

The Clean Water Council was created through the Clean Water Legacy Act (Minn. Stat. Ch 114D) which was signed into law June 2, 2006. The council’s role is to advise on the administration and implementation of the Clean Water Legacy Act. See the Council’s FY18-19 Clean Water Fund and Policy Recommendations Report (December 1, 2016). The 28-member Clean Water Council (Council) represents organizations with a major role in achieving clean water, enabling consensus building and coordination on a wide array of issues critical to the people of Minnesota.

Statewide
Recipient
Science Museum of Minnesota
2018 Fiscal Year Funding Amount
$52,536
Fund Source

Myrtle Lake experiences frequent nuisance algae blooms and does not meet Minnesota state standards for total phosphorus and chlorophyll-a. This has led to questions whether the productivity and condition of the lake has changed over time, what the natural or historical condition of the lake was, what the current trajectory of the lake is, and how to set effective management goals.

St. Louis
Recipient
Olmsted County SWCD
2018 Fiscal Year Funding Amount
$80,376
Fund Source

Olmsted SWCD will work in coordination with Fillmore SWCD and Root River (Houston) SWCD to collect water quality and chemistry parameters on 14 Minnesota Pollution Control Agency approved sites within the Root River watershed during the 2018-2019 sampling season.
Parameters to be tested include:TSS, TP, Chloride, CaCO3 (hardness), E. Coli, Chlorophyll A, Specific Conductance, Temp, pH, DO, NO2/NO3.

Fillmore
Houston
Olmsted
Winona
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$1,500,000
2015 Fiscal Year Funding Amount
$1,500,000
2016 Fiscal Year Funding Amount
$940,000
2017 Fiscal Year Funding Amount
$1,060,000
2018 Fiscal Year Funding Amount
$50,000
Fund Source

This will fund a competitive grant program for sewer projects that will help protect or restore the water quality of waters in national parks located within Minnesota.

Statewide
Recipient
University of Minnesota Center for Changing Landscapes
2018 Fiscal Year Funding Amount
$15,490
Fund Source

This project seeks assistance from University of Minnesota in developing effective interview questions for community watershed assessments and will assist in understanding the data collected through community interviews.

Itasca
Koochiching
Lake of the Woods
Recipient
Redwood-Cottonwood Rivers Control Area
2018 Fiscal Year Funding Amount
$100,000
Fund Source

The Redwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.

Brown
Cottonwood
Lyon
Murray
Pipestone
Redwood
Recipient
Sauk River Watershed District
2018 Fiscal Year Funding Amount
$54,996
Fund Source

The Sauk River Watershed District (SRWD) shall conduct water quality sampling for the Sauk River and tributary sites, as well as several lakes, for Cycle 2 of the Intensive Watershed Monitoring (IWM) during 2018 and 2019. Field monitoring will be completed at 14 stream locations and 9 lakes designated by the Minnesota Pollution Control Agency.
Data management will also be completed by the SRWD, including entering and submitting all data to Canvas and compiling all photos, calibration logs and other documents as requested.

Stearns
Todd
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$146,901
Fund Source

The goal of this work order is to make additions and enhancements to the Scenario Analysis Manager (SAM) tool best management practice (BMP) database and the methodologies used for the application of the BMPs.

Statewide
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$99,998
Fund Source

The goal of this work order is to enhance the Scenario Analysis Manager (SAM) support tool in order to represent best management practices in a more physically based manner, improve point scenario representation and analysis, and support MPCA with training in the application of the enhanced functionality.

Statewide
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$119,995
Fund Source

RESPEC will use the Processing Application Tool for HSPF (PATH) to construct the remaining 22 Scenario Application Manager (SAM) projects. SAM assists in understanding watershed conditions, and identifying priority areas and BMPs that will provide the greatest water-quality benefits for each dollar invested. The value of the tool is in its simplification of complex hydrologic and water quality model applications into transparent estimates of the significant pollutant sources in watershed.

Statewide
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$99,999
Fund Source
The goal of this project is to provide three training sessions for the Scenario Analysis Manager (SAM) software and one training session for the Processing Application Tool for the Hydrologic Simulation Program FORTRAN (HSPF) model.
Statewide
Recipient
USGS
2018 Fiscal Year Funding Amount
$99,999
Fund Source

This project will conduct ongoing sampling and lab analysis for suspended sediment concentration at select sites. It will also develop real-time continuous suspended sediment concentration measurements using turbidity and Acoustic Doppler Velocity Meter sensors, data analysis and draft United States Geological Survey (USGS) Scientific Investigations Report, and comparison of sampling and laboratory methods for total suspended solids and suspended sediment concentrations.

Statewide
Recipient
RESPEC
2018 Fiscal Year Funding Amount
$15,098
Fund Source

A contractor with knowledge of Site Specific Standard development will respond to U.S. Environmental Protection Agency (EPA) questions and concerns regarding attainability of standards based on the BATHTUB model data. In addition, they will review technical memorandums developed by Minnesota Pollution Control Agency (MPCA) on aquatic life and aquatic recreational standard attainability.

Douglas
Meeker
Morrison
Pope
Stearns
Todd
Recipient
Red Lake DNR
2018 Fiscal Year Funding Amount
$49,967
Fund Source

The purpose of this project is to gather data specific to developing a site-specific standard for phosphorus for Upper and Lower Red Lakes. These are large shallow lakes that are located in an area where no shallow lake standard exists. Because of these lakes' unique characteristics, it is believed that a site-specific standard is more appropriate than the deep lake standards that currently exist. This project will include additional chemistry and flow monitoring of tributaries to the lakes, as well as outflow of Lower Red Lake to the Red Lake River.

Beltrami
Koochiching
Recipient
Minnesota Humanities Center
2018 Fiscal Year Funding Amount
$150,000
Fund Source

The goal of this project is to use the We Are Water MN exhibit and their technical knowledge in relationship-building and storytelling to increase community capacity for sustainable watershed management in the Cannon River, Cedar River, Mississippi-Headwaters, Mississippi-Grand Rapids, Mississippi-Twin Cities, Red Lake River, Rum River and St. Louis River watersheds.

Benton
Carlton
Dakota
Hennepin
Itasca
Mille Lacs
Mower
Polk
Recipient
Wild Rice Watershed District
2018 Fiscal Year Funding Amount
$99,997
Fund Source

Phase 2 of the Wild Rice River Watershed Restoration and Protection Strategy (WRAPS) project includes: continued civic engagement; production of the Total Maximum Daily Load (TMDL) study, which allocates pollutant load reductions for impaired waters; and production of the WRAPS report, which identifies implementation strategies that will maintain or improve water quality in many lakes and streams throughout the watershed.

Becker
Clay
Clearwater
Mahnomen
Norman
Recipient
Zumbro Watershed Partnership Inc
2018 Fiscal Year Funding Amount
$10,600
Fund Source

This project will build upon the outreach and education efforts of the Zumbro Watershed Restoration and Protection Strategy (WRAPS). The targeted area will be residents of the Zumbro River Watershed, specifically individuals and organizations that are not professionally involved in managing natural resources. This project will provide necessary outreach and education during the interim between the Zumbro WRAPS and beginning the One Watershed, One Plan process.

Dodge
Goodhue
Olmsted
Rice
Steele
Wabasha