Minnesota's Legacy

All Projects

Showing 1 - 40 of 65 | Export projects
Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Metropolitan Council-Environmental Services
2013 Fiscal Year Funding Amount
$405,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites.
Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek.
Minnesota River: Tributaries include Eagle Creek,Riley Creek, and Valley Creek tributary to the St. Croix River

Anoka
Benton
Carver
Chisago
Dakota
Hennepin
Isanti
Le Sueur
McLeod
Meeker
Mille Lacs
Morrison
Nicollet
Pine
Ramsey
Renville
Rice
Scott
Sherburne
Sibley
Stearns
Washington
Wright
Recipient
City of Elk River
2011 Fiscal Year Funding Amount
$285,087
Fund Source

Great River Energy (GRE) operates a power plant in the City of Elk River which generates electricity by incinerating municipal solid wastes. The plant is located proximate to the City of Elk River wastewater treatment plant (WWTP). This project will result in a corresponding reduction of groundwater use by GRE.

Sherburne
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Clearwater River Watershed District
2015 Fiscal Year Funding Amount
$72,000
Fund Source

The goal of this project is to update existing bacteria and Total Suspended Solids (TSS) source inventory through desktop survey and field reconnaissance to identify and prioritize locations to reduce sediment and bacteria loading to the Clearwater River; then, design and implement best management practices (BMPs) at prioritized locations to reduce loading.

Meeker
Stearns
Recipient
Saint Cloud, City of
2014 Fiscal Year Funding Amount
$35,507
Fund Source

The St. Cloud Waste Water Treatment Facility (SCWWTF) is currently conducting long term planning for future biosolids management. The most likely path forward includes dewatering of the digested biosolids, which will produce a supernatant stream with significant phosphorus and ammonia loads that would be returned to the liquids treatment portion of the WWTF. Returning these nutrient loads to the liquids train would result in increases to effluent concentrations, increases in power consumption, or both.

Stearns
Recipient
Crow Wing Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,315
Fund Source

This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Tetra Tech
2017 Fiscal Year Funding Amount
$80,038
Fund Source

This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.

Aitkin
Carver
Cass
Crow Wing
Douglas
Hennepin
Hubbard
Kandiyohi
McLeod
Meeker
Pope
Renville
Sibley
Stearns
Todd
Wright
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$29,872
Fund Source

This project willl complete a final TMDL document that will be submitted to EPA for approval. Document will include Lake Osakis, Clifford Lake, Faille Lake, and Smith Lake impairments. A final technical memorandum describing the elements of the model framework and any deviations from the recommended construction methodology will be also be provided with the submission of the watershed models.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$33,414
Fund Source

This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Cass County Environmental Services Department
2013 Fiscal Year Funding Amount
$30,000
Fund Source

This project will provide an important framework for civic and citizen engagement and communication, which will contribute to long-term public participation in surface water protection and restoration activities throughout the Pine River watershed. The civic engagement plans will be incorporated into the long term plans for the major watershed project.

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Southeast Minnesota Water Resources Board-Winona State University
2012 Fiscal Year Funding Amount
$80,737
Fund Source

This project will build network and the skill set of local resource professionals to do effective civic engagement work for water restoration and protection in Southeast Minnesota. The cohort will be administered through the Southeast Minnesota Water Resources Board (SE MN WRB) which is an area wide Joint Powers Board (JPB) established to help improve and protect the water resources of the area through coordinating local water planning efforts. This JPB has successfully administered water quality grants in the past that have positively impacted the water resources of this region.

Blue Earth
Dakota
Dodge
Fillmore
Freeborn
Goodhue
Houston
Le Sueur
Mower
Olmsted
Rice
Scott
Steele
Wabasha
Waseca
Washington
Winona
Recipient
Emmons & Olivier Resources
2013 Fiscal Year Funding Amount
$99,355
Fund Source

This project will complete a pollutant source identification and subwatershed information report and support the development of a Draft Restoration and Protection Plan (RAPP). It will also support the devlopment of a Implementation Plan that will identify target areas for BMP implementation for bacteria reductions.

Anoka
Benton
Carver
Crow Wing
Dakota
Douglas
Hennepin
Kandiyohi
McLeod
Meeker
Mille Lacs
Morrison
Pope
Ramsey
Sherburne
Sibley
Stearns
Todd
Washington
Wright
Recipient
Benton Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$75,000
Fund Source

This project will determine the magnitude and sources of pollutants in Little Rock Creek and will estimate the reductions in loadings that are needed in order for the stream reaches to support cold water fish assemblages and attain water quality standards.

Benton
Morrison
Recipient
Crow Wing Soil and Water Conservation District
2014 Fiscal Year Funding Amount
$20,442
Fund Source

This leadership workshop series will provide the participants (citizen leaders) with knowledge, skills, processes and tools that can help to strengthen their current efforts and nurture new ones.

Aitkin
Becker
Beltrami
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$253,710
Fund Source

The goal of this project is to construct, calibrate, and validate five Hydrologic Simulation Program FORTRAN (HSPF) watershed models. The outcome will be HSPF models that can readily be used to provide information to support conventional parameter TMDLs. These models will generate predicted output timeseries for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Wright
Todd
Stearns
St. Louis
Sherburne
Morrison
Mille Lacs
Meeker
Kanabec
Itasca
Isanti
Chisago
Cass
Carlton
Benton
Anoka
Aitkin
Recipient
Sherburne SWCD
2015 Fiscal Year Funding Amount
$28,407
Fund Source

Sherburne Soil and Water Conservation District (SWCD) will subcontract with Clearwater River Watershed District (CRWD) to cooperatively coordinate monitoring of three locations within the Mississippi River (St. Cloud) Watershed. A total of four staff (two from each district) will communicate to ensure that the locations are monitored according to the WPLMN Standard Operating Procedures (SOPs) for AIS and non AIS sites

Sherburne
Recipient
University of Minnesota
2011 Fiscal Year Funding Amount
$73,563
Fund Source

This project will study the geologic controls on nitrate transport in southeast Minnesota's karst landscape and will also provide datasets for other projects over time.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
AQUA TERRA Consultants
2011 Fiscal Year Funding Amount
$99,950
Fund Source

This project will support construction of three watershed framework models built using the Hydrologic Simulation Program FORTRAN (HSPF). These executable models will simulate hydrology at the subbasin scale. An HSPF model will be built for each of these major watersheds: Crow Wing River, Redeye River, and Long Prairie River.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
RESPEC
2013 Fiscal Year Funding Amount
$174,954
Fund Source

This project will construct, calibrate, and validate three HSPF watershed models. The consultant will produce HSPF models that can readily be used to provide information to support conventional parameter TMDLs. The consultant will clearly demonstrate that these models generate predicted output time series for hydrology, sediment, nutrients, and dissolved oxygen which are consistent with available sets of observed data.

Becker
Hubbard
Crow Wing
Aitkin
Clearwater
Cass
Itasca
Beltrami
Recipient
RESPEC
2014 Fiscal Year Funding Amount
$396,300
Fund Source

The goal of this project is to continue and finalize HSPF watershed model construction and complete the calibration/validation process.

Aitkin
Anoka
Becker
Beltrami
Benton
Carlton
Cass
Clearwater
Crow Wing
Hubbard
Isanti
Itasca
Kanabec
Meeker
Mille Lacs
Morrison
Sherburne
St. Louis
Stearns
Todd
Wright
Recipient
Aqua Terra Consultants
2012 Fiscal Year Funding Amount
$120,238
2013 Fiscal Year Funding Amount
$134,980
Fund Source

This project will continue HSPF watershed model construction beyond the initial framework development. The consultant will add representation of point source discharges to the model. The consultant will also compile flow data for the purposes of calibration and validation. Finally, an initial hydrologic calibration will be performed and submitted for approval.

Becker
Cass
Clearwater
Crow Wing
Douglas
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Oliver Resources (EOR)
2015 Fiscal Year Funding Amount
$36,993
Fund Source

Update previous draft Total Maximum Daily Load (TMDL) documents and modeling files with Environmental Protection Agency (EPA) comments and site specific standards.

Douglas
Recipient
AECOM, Inc.
2010 Fiscal Year Funding Amount
$35,000
Fund Source

Phase 4 of the Lake Winona Total Maximum Daily Load (TMDL) project will finalize the draft Lake Winona TMDL, dated November 2009, by completing additional data analysis, lake quality modeling, updating the TMDL report, and supporting the public involvement process.

Cass
Douglas
Morrison
Otter Tail
Todd
Recipient
Emmons & Olivier Resources (EOR)
2014 Fiscal Year Funding Amount
$77,128
Fund Source

The goal of this project is to develop a Total Maximum Daily Load (TMDL) for all impaired stream reaches and lakes within the Long Prairie and Red Eye Watersheds.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Emmons & Oliver Resources (EOR)
2016 Fiscal Year Funding Amount
$23,900
Fund Source

This project is to finalize the Total Maximum Daily Loads (TMDLs) and Watershed Restoration & Protection Strategies (WRAPS) for the Red Eye and Long Prairie Watersheds.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Douglas Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$78,450
Fund Source

This project will gather watershed data to support the development of a Watershed Restoration and Protection Strategy with parameter-specific targets that will maintain or improve water quality for the Long Prairie River Watershed. This project will also provide an important framework for civic and citizen engagement and communication, contributing to long-term public participation in surface water protection and restoration activities throughout the watershed.

Douglas
Morrison
Otter Tail
Todd
Wadena
Recipient
Metropolitan Council
2010 Fiscal Year Funding Amount
$326,500
Fund Source

This project will provide condition monitoring and problem investigation monitoring at the following sites. Mississippi River: Tributaries include Bassett Creek, Cannon River, Crow River, and Minnehaha Creek. Minnesota River: Tributaries include Eagle Creek, Riley Creek, and Willow Creek. St. Croix River: Tributary includes Valley Creek.

Wright
Washington
Stearns
Sibley
Sherburne
Scott
Rice
Renville
Pine
Nicollet
Morrison
Mille Lacs
Meeker
McLeod
Le Sueur
Isanti
Hennepin
Dakota
Chisago
Carver
Benton
Anoka
Recipient
Sherburne SWCD
2016 Fiscal Year Funding Amount
$41,903
2019 Fiscal Year Funding Amount
$9,684
Fund Source

The project goal is to conduct water chemistry monitoring at three subwatershed sites in 2016-2019 and ongoing as needed in 2020 based on flow conditions, targeting runoff events using protocols defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Sherburne
Wright
Recipient
Mississippi Headwaters Board
2016 Fiscal Year Funding Amount
$49,712
2018 Fiscal Year Funding Amount
$45,469
Fund Source

The project goal is to conduct water chemistry monitoring at four subwatershed sites and one basin site in 2016, 2017, 2018 and 2019. Water chemistry monitoring will be conducted at a wide range of flow conditions with emphasis of collecting samples during periods of moderate and high flows after runoff events, as defined in the Watershed Pollutant Load Monitoring Network (WPLMN) Standard Operating Procedures and Guidance. The data collected will be submitted to the Minnesota Pollution Control Agency (MPCA) and used in the FLUX32 model for calculating pollutant loads.

Benton
Morrison
Todd
Recipient
Mower Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$37,591
Fund Source

This purpose of this project is to evaluate the conditions of eight streams in the Cedar River Watershed and one site on the Wapsipinicon River. Monitoring will take place for two years. Mower Soil and Water Conservation District staff will collect samples following Minnesota Pollution Control Agency (MPCA) Intensive Watershed Monitoring (IWM) sample collection protocols and will organize and review all field and laboratory data, along with field notes and photos.

Dodge
Mower
Recipient
Minnesota Pollution Control Agency
2011 Fiscal Year Funding Amount
$3,521,699
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Becker
Beltrami
Blue Earth
Carlton
Dakota
Dodge
Douglas
Freeborn
Goodhue
Jackson
Lake
Le Sueur
Lincoln
Mahnomen
Marshall
Morrison
Murray
Nobles
Norman
Otter Tail
Pennington
Pine
Pipestone
Polk
Rice
Rock
Roseau
Scott
St. Louis
Steele
Todd
Wadena
Waseca
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Minnesota Erosion Control Association
2017 Fiscal Year Funding Amount
$4,405
Fund Source

Minnesota Erosion Control Association (MECA) will offer three one-day training session intended to educate permittees on the requirements of the Municipal Separate Storm Sewer System (MS4) permit. The focus of these workshops will be on conducting inspections and various hot topics.

Blue Earth
Kandiyohi
Wright
Recipient
Olmsted County SWCD
2018 Fiscal Year Funding Amount
$80,376
Fund Source

Olmsted SWCD will work in coordination with Fillmore SWCD and Root River (Houston) SWCD to collect water quality and chemistry parameters on 14 Minnesota Pollution Control Agency approved sites within the Root River watershed during the 2018-2019 sampling season.
Parameters to be tested include:TSS, TP, Chloride, CaCO3 (hardness), E. Coli, Chlorophyll A, Specific Conductance, Temp, pH, DO, NO2/NO3.

Fillmore
Houston
Olmsted
Winona
Recipient
Crow Wing County Soil & Water Conservation District (SWCD)
2013 Fiscal Year Funding Amount
$69,999
Fund Source

Phase II of this project will focus on source assessment, running watershed scenarios, Kego Lake TMDL, lake protection planning, Stressor identification and the continuation of the Civic Engagement components of the project. Information gathered in Phase II will be utilized in developing the WRAP report which will be developed in the future Phase III of the project.

Aitkin
Cass
Crow Wing
Hubbard