Minnesota's Legacy

All Projects

Showing 1 - 15 of 15 | Export projects
Recipient
Fillmore Soil and Water Conservation District
2013 Fiscal Year Funding Amount
$92,464
Fund Source

This project will obtain spatial and long-term pollutant load information from the Root River watershed in Southeast Minnesota. To accomplish this, the Fillmore Soil and Water Conservation District (SWCD) will assist the MPCA with water quality monitoring and annual pollutant loading calculations. Approximately 25 grab samples will be collected/site/year at 5 sites within the Root River watershed (totaling 125 grab samples/year). Annual load calculations for each site will be determined using the FLUX32 model.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Peer Engineering
2014 Fiscal Year Funding Amount
$115,910
Fund Source

Peer Engineering, Inc. (Peer) will evaluate and recommend to MPCA groundwater monitoring staff prospective sites/locations for the installation of groundwater monitoring wells to evaluate contaminant/pollutant concentrations from various sources. Peer will oversee the installation of monitoring wells by retaining a state drilling contractor or preparing bid documents to retain well driller through the Department of Administration. Superfund staff will assist in the project by providing oversight of contractual requirements and provide technical assistance as needed.

Dakota
Hennepin
Mower
Rice
Washington
Recipient
Cass County (Environmental Services Department)
2012 Fiscal Year Funding Amount
$82,696
Fund Source

This project will include lake and stream monitoring on 23 lakes and 4 streams found within the Leech Lake River and Pine River watersheds in Cass County. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites located in the targeted watersheds for 2012. Cass ESD is partnering with Hubbard SWCD, the Leech Lake Band of Objibwe, and RMB Environmental Laboratories to conduct the fieldwork for this project.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard
Recipient
Crow Wing Soil and Water Conservation District
2012 Fiscal Year Funding Amount
$50,315
Fund Source

This project will include lake and stream monitoring on 7 lakes and 3 streams found within the Pine River watershed. The project will be conducted in an effort to gain sufficient data on these data-deficient lake and stream sites within these watersheds. All of the proposed monitoring sites are target sites for 2012. One of the goals in the Crow Wing County (CWC) Local Comprehensive Water Plan (CWP) is to establish a countywide Comprehensive Monitoring Plan (CMP).

Aitkin
Cass
Crow Wing
Hubbard
Recipient
Crow Wing Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$45,964
Fund Source

This project will collect a complete Trophic Site Index (TSI) data set for Crow Wing County lakes and a complete data set for streams and rivers for the Intensive Monitoring Program (IMP). Crow Wing County, Cass County, Wadena County, Morrison County and Hubbard County are partnering to ensure that all target lakes and rivers within the Crow Wing River watershed are monitored efficiently.

Aitkin
Becker
Cass
Clearwater
Crow Wing
Hubbard
Morrison
Otter Tail
Todd
Wadena
Recipient
Mower Soil and Water Conservation District
2019 Fiscal Year Funding Amount
$37,591
Fund Source

This purpose of this project is to evaluate the conditions of eight streams in the Cedar River Watershed and one site on the Wapsipinicon River. Monitoring will take place for two years. Mower Soil and Water Conservation District staff will collect samples following Minnesota Pollution Control Agency (MPCA) Intensive Watershed Monitoring (IWM) sample collection protocols and will organize and review all field and laboratory data, along with field notes and photos.

Dodge
Mower
Recipient
Minnesota Pollution Control Agency
2014 Fiscal Year Funding Amount
$297,169
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2015 Fiscal Year Funding Amount
$287,628
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, fieldwork, data management, and interpretation expenses associated with monitoring and assessment activities.The ambient groundwater monitoring network describes the current condition and trends in Minnesota's groundwater quality.

Anoka
Becker
Beltrami
Blue Earth
Carlton
Cass
Chisago
Clay
Clearwater
Dakota
Faribault
Goodhue
Hennepin
Hubbard
Itasca
Lake
Lake of the Woods
Lyon
Morrison
Mower
Olmsted
Otter Tail
Pine
Polk
Ramsey
Redwood
Scott
Sherburne
Stearns
Todd
Wabasha
Wadena
Washington
Winona
Recipient
Minnesota Pollution Control Agency
2012 Fiscal Year Funding Amount
$5,500,000
Fund Source

This project supports monitoring and assessment activities by MPCA EAO staff and includes lab analysis, equipment, and fieldwork expenses associated with monitoring and assessment activities within the described priority watersheds.

Lake Monitoring: Lakes are monitored for nutrients, clarity and other information to provide the data needed to assess the aquatic recreation use support.

Aitkin
Beltrami
Carver
Cass
Clearwater
Crow Wing
Dodge
Goodhue
Hennepin
Hubbard
Kandiyohi
Lake of the Woods
Marshall
McLeod
Meeker
Mower
Olmsted
Pennington
Polk
Red Lake
Renville
Rice
Roseau
Sibley
Steele
Wabasha
Wright
Recipient
Olmsted County SWCD
2018 Fiscal Year Funding Amount
$80,376
Fund Source

Olmsted SWCD will work in coordination with Fillmore SWCD and Root River (Houston) SWCD to collect water quality and chemistry parameters on 14 Minnesota Pollution Control Agency approved sites within the Root River watershed during the 2018-2019 sampling season.
Parameters to be tested include:TSS, TP, Chloride, CaCO3 (hardness), E. Coli, Chlorophyll A, Specific Conductance, Temp, pH, DO, NO2/NO3.

Fillmore
Houston
Olmsted
Winona
Recipient
Root River SWCD
2015 Fiscal Year Funding Amount
$39,044
Fund Source

The goal of this project is to perform water quality monitoring in order to accomplish MPCA’s Intensive Watershed Monitoring (IWM) plan in preparation for development of Watershed Restoration and Protection (WRAP) monitoring efforts. The monitoring sites are located in Houston, Fillmore and Mower counties in southeast Minnesota. This project will provide intensive stream monitoring for Pine Creek in the La Crescent watershed, Winnebago and Crooked Creek in the Reno watershed, Bear, Pine and the Upper Iowa in the Upper Iowa watershed.

Houston
Recipient
Fillmore County Soil and Water Conservation District
2011 Fiscal Year Funding Amount
$319,700
Fund Source

TMDL project in the Root River Watershed that will support surface water assessment, analysis of data, interpretation of southeast Minnesota's karst landscape, stressor identification, TMDL computation, source assessment, and implementation planning.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Fillmore County
2016 Fiscal Year Funding Amount
$72,239
2018 Fiscal Year Funding Amount
$42,477
Fund Source

The Root River Watershed Pollutant Load Monitoring Network (WPLMN) project will continue existing efforts to calculate seasonal pollutant loads for the Root River. The Fillmore Soil and Water Conservation District (SWCD) will assist the Minnesota Pollution Control Agency (MPCA) with water quality monitoring and pollutant load calculations for five subwatershed sites. Approximately 50 grab samples per site (total of 250) between ice-out and October 31 of 2016 through 2019 will be collected along with field measurements and observations.

Fillmore
Houston
Recipient
Fillmore County
2014 Fiscal Year Funding Amount
$56,717
Fund Source

The goal of this project is to investigate nitrate transport and the sources of nitrate in karst for more effective implementation of best management practices that will reduce nitrate concentrations in ground and surface water.

Dodge
Fillmore
Houston
Mower
Olmsted
Winona
Recipient
Headwaters Science Center (HSC)
2012 Fiscal Year Funding Amount
$45,229
Fund Source

This project will include stream monitoring of six preselected sites from the Leech Lake Watershed (HUC 07010102) and Pine River Watershed (HUC 07010105). The sites will be monitored for chemical, physical and biological parameters for two years.

Aitkin
Beltrami
Cass
Crow Wing
Hubbard