Area 1 - Red River Valley Conservation Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

The Accelerated Water Quality Project Implementation Program will increase the connection between landowners, local government units and the landscape to accelerate efforts addressing non-point source loading to surface waters throughout the Red River Valley Conservation Service Area.

Becker
Beltrami
Clay
Grant
Kittson
Mahnomen
Marshall
Norman
Otter Tail
Pennington
Polk
Red Lake
Roseau
Traverse
Wilkin
Recipient
Becker SWCD
2014 Fiscal Year Funding Amount
$40,710
Fund Source

The Becker County Drainage Ditch Inventory and Inspection Project is a collaborative, multifaceted approach to develop a GIS-based drainage ditch inventory database system, inventory the current conditions of judicial ditches and adjacent land, and target and prioritize portions of each ditch system for restorative or protective measures.

Becker
Recipient
Becker SWCD
2016 Fiscal Year Funding Amount
$254,897
Fund Source

With over 500 public water lakes in Becker County, we are blessed with abundant and diverse lake resources that, like those of much of lake country, are at risk of degradation due to increasing development pressures, redevelopment of non-conforming lots, rising stormwater runoff and land use changes within their watersheds.

Becker
Recipient
Minnesota Department of Agriculture
2017 Fiscal Year Funding Amount
$13,578
2016 Fiscal Year Funding Amount
$10,048
2015 Fiscal Year Funding Amount
$7,042
2014 Fiscal Year Funding Amount
$13,000
2013 Fiscal Year Funding Amount
$14,400
2012 Fiscal Year Funding Amount
$31,400
2010 Fiscal Year Funding Amount
$60,000
Fund Source

The Clay County Drainage Site is designed to evaluate the environmental impact of both surface and subsurface drainage from agricultural fields. This site includes six subsurface plots and one surface runoff plot, each approximately 24 acres in size. Monitoring stations are fully automated and each individual plot is monitored separately.The soils and topography across this demonstration site are virtually identical and represent field characteristics common in the most productive agricultural areas of the Red River Valley.

Clay
Recipient
Headwaters Science Center
2016 Fiscal Year Funding Amount
$57,028
Fund Source

This project will conduct water quality monitoring at 12 stream sampling sites. The sites will be monitored for chemical, physical, and bacteriological parameters over a two year time-period. The Headwaters Science Center (HSC) will be the lead agency and arrange volunteer cooperation from Trek North, Bemidji, Perham and/or Detroit Lakes High School students and their instructors. The HSC project lead will be responsible for oversight and full compliance to MPCA protocols.

Otter Tail
Recipient
Otter Tail, West SWCD
2015 Fiscal Year Funding Amount
$290,616
Fund Source

This Initiative is a nine-year plan to take a systematic approach to inventory and analyze all Public Waters within the County. Phase 1 includes identifying areas of concern through GIS analysis of current landuse along Public Waters, and the development of a database of non-compliant landowners which will be updated and maintained. Once landowners have been identified they will receive a joint letter and map stating that they may not be in compliance.

Otter Tail
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$203,000
Fund Source

The Otter Tail River is located in west-central Minnesota. Its Lower Otter Tail River (LOTR) reach is impaired for sediment. The LOTR begins at the dam of Orwell Reservoir near Fergus Falls and ends 48 river miles downstream at the confluence with the Bois de Sioux River at Breckenridge. No point sources contribute directly to the LOTR. Consequently, the turbidity impairment must be addressed through non-point measures. Current stream instability and bank erosion is largely a result of an 18-mile channel straightening completed by the Army Corps of Engineers in the 1950s.

Wilkin
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$135,000
Fund Source

This restoration and protection project will reduce the loading of sediment to the Otter Tail River by 440 tons/year. This is about 6.5% of the total reduction needed to meet the goals of the Lower Otter Tail TMDL Implementation Plan. The Otter Tail River downstream of Orwell Dam is impaired due to sediment, with stream bank erosion being the primary contributor. This stream bank restoration will include the installation of woody toe debris benches and the installation of a vegetated slope along a 1,400 foot reach of the river.

Wilkin
Recipient
East Otter Tail SWCD
2017 Fiscal Year Funding Amount
$52,556
Fund Source

This project will determine the condition of the water bodies in the Otter Tail River watershed, initiate public participation in the Watershed Restoration and Protection Strategy (WRAPS) development process, begin identification of potential stressors and priority management areas within the watershed, and begin development of initial drafts of the Total Maximum Daily Load (TMDL) study and WRAPS report.

Becker
Clearwater
Otter Tail
Wilkin
Recipient
Tetra Tech Inc
2017 Fiscal Year Funding Amount
$75,000
Fund Source

The goal of this project is to complete the construction, calibration, and validation of a Hydrological Simulation Program FORTRAN (HSPF) watershed model for the Otter Tail River watershed. The contractor will produce an HSPF model that can readily be used to provide information to support conventional parameter Total Maximum Daily Load (TMDL) Studies. The model will generate predicted output for hydrology, sediment, nutrients, and dissolved oxygen that is consistent with observed data.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Wilkin SWCD
2016 Fiscal Year Funding Amount
$201,000
Fund Source

The Otter Tail River is impaired for turbidity. This project involves the installation of 45 side-inlet structures into Wilkin County Ditch 3-2 and 7-1 and 22 acres of buffer strips along the entire systems. Eleven miles of continuous berm will also be constructed along the ditch. When installed these water quality practices will become a permanent part of the ditch system and will be maintained by the ditch authority. These ditches outlet to the Otter Tail River just upstream from Breckenridge, MN. Together these water quality BMPs will reduce sediment loading by 1,375 tons/year.

Wilkin
Recipient
University of Minnesota: Sponsored Projects Administration
2015 Fiscal Year Funding Amount
$80,322
Fund Source

This project will be the first of its kind Civic Engagement Cohort that focusses its efforts in an individual watershed. The Otter Tail River Watershed is scheduled to start a Watershed Restoration and Protection Strategy (WRAPS) in 2016 and as a component of that project, the cohort will provide the civic engagement requirement. The cohort will be comprised of 25-30 individuals located throughout the watershed who represent a broad spectrum of resource managers and citizens who are familiar with water quality and watershed management.

Becker
Clay
Clearwater
Mahnomen
Otter Tail
Wilkin
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$235,250
Fund Source

The Prioritization, Targeting, and Measuring Water Quality Improvement Application (PTMA) connects the general qualitative strategies in a Total Maximum Daily Load (TMDL) and Watershed Restoration and Protection (WRAP) and the identification of implementable on-the-ground Best Management Practices (BMPs). Leveraging geospatial data from the International Water Institute this application will be developed for two pilot areas within the Red River Basin.

Becker
Cass
Clay
Grant
Mahnomen
Norman
Otter Tail
Traverse
Recipient
Red River Watershed Mgmt Board
2014 Fiscal Year Funding Amount
$30,636
Fund Source

As part of the FY 2012 funding cycle, the Board of Water and Soil Resources granted funds for development of the Water Quality Decision Support Application (WQDSA). The WQDSA will provide land and water managers with geospatial data and online tools to prioritize, market, and implement actions on the landscape to achieve water quality objectives identified in local and state water plans and to ensure that public funding decisions are strategic and defensible.

Becker
Clay
Mahnomen
Norman
Polk
Recipient
Becker County
2016 Fiscal Year Funding Amount
$75,000
Fund Source

An effective regulatory program is key to the successful implementation of local land use and water management plans. Yet, county, watershed, and other state, tribal, and local agencies charged with enforcement and permit review often work in silos and infrequently coordinate with each other or share information. This leads to higher enforcement costs, conflicts between agencies, redundancy of inspections, property owner frustration, and reinforces negative stereotypes of regulatory agencies.

Becker