The project will improve the water quality of Bassett Creek by addressing a significant flooding issue and will restore 1.7 acres of wetland and 1 acre of upland habitat. The project will create a sediment forebay, remove accumulated sediment, and expand the footprint of existing stormwater ponds in the City of Golden Valley. The result will be approximately 22 acre-feet of additional flood storage and the removal of an estimated 9 pounds of phosphorus per year.
This project will improve the water quality of the Mississippi River through stormwater treatment and flood control activities. The Capitol Region Watershed District and the City of Lauderdale will expand the storage area of a regional stormwater pond and and improve the pond treatment capacity by installation of an iron-enhanced sand filter along the pond edge. This project is funded through the Ramsey County allocation of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve the water quality of lakes in Ramsey and Washington Counties. This will be accomplished by: 1) installation of filtration basins adjacent to Wakefield Lake to reduce nutrient and sediment pollution, and 2) construction of raingardens on private property that filter stormwater runoff thereby reducing sediment and nutrient pollution to Battle Creek Lake and Kohlman Creek. This project is funded through the Ramsey County and Washington County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
This project will improve the water quality to Upper Twin Lake and the Mississippi River. This will be accomplished through cost share programs administered through the Shingle Creek Watershed Management Commission (WMC) and West Mississippi WMC that will provide matching funds to member cities to undertake small pollutant load and runoff volume reduction projects typically costing less than $100,000. This project will install bioretention basins which will reduce nutrients to Upper Twin Lake and bacteria loads to the Mississippi River.
This project will conduct a subwatershed feasibility study to identify and prioritize project locations for retrofit of stormwater best management practices. The project will also include installation of the highest priority stormwater improvement practice to reduce nutrient pollution to Goose Lake. This project is funded through the Anoka County and Ramsey County allocations of the Watershed-Based Funding Pilot Program for the Seven County Metropolitan Area.
The Target North St. Paul Stormwater Retrofit project will target phosphorus removal from stormwater runoff. This runoff receives limited treatment before discharging to Kohlman Creek, a waterbody impaired for excess nutrients. This project is one of many efforts RWMWD has undertaken to improve the water quality of Kohlman Lake and the downstream waterbodies. The Ramsey-Washington Metro Watershed District (RWMWD) is responsible for the protection and restoration of the water quality of 20 lakes and 5 creeks within its boundary.
Installation of approximately 25 curb-cut rain gardens in priority subwatersheds. Ramsey County Soil and Water Conservation Division has completed 90% designs and are incorporating final design modifications based on comments from our partner Cities (St. Paul and Roseville). Three rain gardens are proposed in the McCarrons subwatershed and 23 are proposed in the Como Lake subwatershed.