The goal of this project is to develop and complete the Watershed Restoration and Protection (WRAP) process and report, while also enlarging and sustaining a public participation process that encourages local ownership of water quality problems and solutions (civic engagement).
The data collected in this workplan is the foundation for an accurate TMDL allocation and accurate implementation strategy design. Current and historic phosphorus inputs will be calculated and evaluated as to source. Nutrient and algal history and trends in sedimentation will be reconstructed to identify ecological changes that have occurred in the lakes both recently and historically.
This project addresses the identified need for an Implementation Plan that provides an overall roadmap for the effort it will take to meet the Carnelian Marine St. Croix Multi-Lakes Total Maximum Daily Load (TMDL). An Implementation Plan will be developed, with involvement of the Project Partners and stakeholder groups, that sets forth prioritized strategies for attaining the TMDL and a method for tracking the progress of those efforts. The Implementation Plan will be restoration-focused, but will include protection-oriented information/actions as well.
Continued TMDL project to support next phases associated with completion of TMDL's for ten lakes in the Carnelian Marine Saint Croix Watershed District (CMSCWD). Ten lakes are; East Boot, Fish, Goose, Hay, Jellum’s, Long, Loon, Louise, Mud and South Twin.
Ramsey-Washington Metro Watershed District (RWMWD) will improve water quality in Casey Lake and ultimately Kohlman Lake through the installation of approximately 25 rain gardens on priority properties identified as part of the Casey Lake Urban Stormwater Retrofit Assessment completed by Ramsey Conservation District (RCD) in 2011.
The United States Environmental Protection Agency requires the Minnesota Pollution Control Agency (MPCA) to carry out the Total Maximum Daily Load (TMDL) program in the state of Minnesota. Minnesota has an abundance of lakes and river reaches, many of which will require a TMDL study. In an effort to expedite the completion of TMDL projects, the MPCA has decided to construct watershed models. These models have the potential to support the simultaneous development of TMDL studies for multiple listings within a watershed.
The entities of the Cedar - Wapsipinicon watershed planning area hope to achieve the Cedar - Wapsipinicon Comprehensive Watershed Management Plan goals, including surface water quality, groundwater quality, excessive sedimentation and erosion, and flooding goals. Work includes cost-share incentives, project development, technical/engineering assistance, education/outreach, and administration/grant reporting.
There are two main goals of this Cedar Basin HSPF project,
A. Overall development of the HSPF model in the Cedar Basin of Minnesota; and
B. Shell Rock River nutrient, DO , impairment modeling and TMDL completion.
This project will place the Cedar River watershed on a sustainable and clearly understood implementation process for comprehensive water management. All people living in the watershed and all groups operating and managing land in the watershed, are responsible stakeholders in the effort. Objectives for this phase of the project include:
1. Develop a comprehensive watershed restoration and protection strategy.
2. Continue development of a more coordinated and comprehensive citizen participation process.
This project will guide local implementation planning efforts by identifying water quality goals, strategies, and implementation milestones in the Cedar River Watershed. This watershed includes 435 square miles in major portions of Mower, Freeborn and Dodge Counties, and incudes the regional center of Austin. A Watershed Restoration and Protection Strategy (WRAPS) report will be completed by this effort.
This project is for the Cedar River Watershed, which includes major portions of Mower, Freeborn and Dodge Counties in southern Minnesota. The scope of this project is to complete the Total Maximum Daily Load (TMDL) studies for 11 stream reaches with sediment impairments, and 14 stream reaches for bacteria impairments. The major product of this effort will be the final Cedar River TMDL report, which will be submitted to the United States Environmental Protection Agency, and public-noticed by the Minnesota Pollution Control Agency.
Lambert Creek discharges into Vadnais Lake, the final impoundment reservoir containing the potable water supply for the city of St. Paul and eight nearby suburbs. Monitoring data indicates high nutrient levels and the creek is listed by the State as having high bacterial levels. In-stream work along Lambert Creek has been maximized with restoration improvements achieving nutrient load reduction. The next step to further improve water quality is to concentrate on restoration efforts on a subwatershed level.
The LeSueur River has been identified as one of the leading contributors of sediment to the Minnesota River. A majority of this sediment has been determined to come from the banks, bluffs and ravines located along the river. This project focuses on a one mile reach of the LeSueur River where stream channel migration and mass wasting are significantly eroding four bluffs. Two township roads and many houses are in danger of falling into the river.
A cooperative study was conducted by the U.S. Geological Survey (USGS), the Metropolitan Council, and the Minnesota Department of Health to assess groundwater and surface-water interactions in lakes in the northeast Twin Cities Metropolitan Area (TCMA), including White Bear Lake. An important product of the study was the creation of a groundwater-flow model focused on the northeast TCMA. The groundwater flow model is available for future use to assess the effects of groundwater withdrawals on lake levels as well as to describe other groundwater and surface-water interactions.
The Villa Park Wetland Restoration Project proposes sediment removal from 6 contiguous stormwater wetland treatment cells within the Villa Park Wetland system resulting in an additional 118lbs/yr of total phosphorus(TP) removal from water entering Lake McCarrons.
The City of Inver Grove Heights will remove PAH contaminated sediment from the 79th Street Pond. Approximately 2,300 cubic yards of sediment will be dredged and disposed of at the Pine Bend Landfill located in the City of Inver Grove Heights.
The City of Minnetonka and its residents highly value the water resources within the community, which include approximately ten lakes, four streams, and hundreds of wetlands. The City has been progressive in protecting these resources through policies and management strategies, and now wants to increase their on-the-ground efforts in protecting and improving water quality. The City hopes to conduct targeted watershed assessments for fourteen selected priority water bodies to identify and optimize the type and locations of Best Management Practices (BMPs) to be installed.
Pine Soil and Water Conservation District is partnering with the City of Sturgeon Lake to seal over 50% of the unused wells in the city limits. The City of Sturgeon Lake recently installed a municipal water supply system, and completed a Minnesota Department of Health approved Wellhead Protection Plan. Residents have connected to the new public water supply system and need to seal their unused wells.
The nine member Counties and Soil and Water Conservation Districts of the Greater Blue Earth River Basin Alliance (GBERBA) will be able to enhance our effectiveness to provide elevated levels of technical assistance, education and outreach in the areas of urban stormwater, wellhead protection, nutrient management, conservation agronomy, drainage and agricultural best management practices to reduce nonpoint source pollution in the Blue Earth, Le Sueur and Watonwan River Watersheds.
The Ramsey-Washington Metro Watershed District (District) has determined that large impervious sites (like churches, commercial sites, and schools) are more economical for stormwater management retrofit projects than distributed small projects along roadways. The District began assessing church sites for retrofit opportunities in 2013 and will continue this effort in 2014. Church congregations have been receptive to partnering with the watershed district.
Lambert Creek is wholly within the Vadnais Lake Area Water Management Area. Vadnais Lake is the drinking water reservoir for the City of St. Paul and surrounding communities. Lambert Creek has elevated bacteria and nutrient levels and water quality in Vadnais Lake will not improve unless there is a reduction in the phosphorus loading from Lambert Creek.
This project is the ecological restoration of 1,400 feet of Shingle Creek, an Impaired Water for low dissolved oxygen and impaired biota, in Brooklyn Center and Brooklyn Park. The Shingle Creek Impaired Biota and Dissolved Oxygen Total Maximum Daily Load requires sediment oxygen demand load reductions and establishes restoration design standards to enhance habitat that will be incorporated into this project.
Significant interest exists across Hennepin County for providing additional water and natural resources education, engagement, and technical assistance to residents that leads to implementation of conservation practices on more residential properties and across more communities. WMWA, Hennepin County, and 5 metro Watershed-Based Implementation Funding (WBIF) convening groups propose a pilot program funded in part by metro WBIF allocations.
On behalf of the Metropolitan Council, Environmental Financial Group Inc. generated a matrix of water conservation programs with detailed information about the costs and benefits of the programs. Tools were also developed to allow users to calculate potential water savings, estimate program implementation costs, and test the effects of various water conservation programs and rate structures.
The Cottageville Park Water Quality Protection and Stream Restoration Project was developed to meet the goals of the Minnehaha Creek Watershed District and the City of Hopkins, including; water resource management, channel stabilization, stream enhancement, riparian corridor improvements, open space creation, park development, and revitalization. The project achieves these goals through implementation of the following:
The Cottonwood River watershed is one of the last remaining watersheds to complete Cycle I of the Watershed Restoration & Protections Strategies (WRAPS) process. The scope of this project upon completion is have two reports developed; a Watershed Restoration and Protection Strategies report and a Total Maximum Daily Load (TMDL) for the entire watershed.
Nearly 700 miles of open water flow through Faribault County's borders. Over one-third of these miles are artificial drainage systems. Artificial drainage systems are necessary to remove excess precipitation and improve the productivity of agricultural land, however they also have a direct effect on the water quality and quantity of receiving waterbodies. With limited resources available to manage these systems, innovative and efficient management tools will play a critical role in targeting improvements for water quality.
This project will address impairments in the St. Croix, Kettle and Snake River Watersheds by reducing sediment and phosphorus delivery by encouraging private forest landowners within the St. Croix River Watershed in Pine County to re-establish riparian forest buffers, maintain existing riparian buffers and plant de-forested areas. It will develop a forest stewardship program and write forest stewardship plans in watersheds with the highest risk of impacts on water quality as listed by the Minnesota Forest Resources Council. This project will implement measures to achieve the St.
This project will improve water quality, reducing phosphorus annually by 1,842 in the St. Croix, Kettle and Snake River Watersheds in Pine County by establishing cover crops to reduce erosion and phosphorus/fertilizer applications, increase soil fertility, permeability, and microbe activity. A no-till drill will be purchased for use by agricultural producers for installing cover crops as a means of decreasing soil erosion, reducing phosphorus and fertilizer applications and increasing soil health.
The Contractor will assist in planning and executing the regular meetings of the St. Croix River Basin Team, including providing minutes of the meetings. Assist in the functioning of the priority issue subcommittees. Respond to public notices for re-issuances of NPDES permits, EAWs and other pertinent public notices, and participate in prioritized public meetings with local governmental units and water planning organizations.
These projects will improve water quality by reducing the sediment and phosphorus delivery to the Kettle and St. Croix River Watersheds and engage and educate municipalities and the public regarding the water quality benefits of shoreline buffers and rain gardens. Phosphorus and sediment delivery to the Kettle River from stormwater runoff at Robinson Park in the City of Sandstone will be reduced by the establishment of a native buffer and repair of the river bank by installing soil wraps implanted with deep rooted native species.
This project will conduct a 2017 revision of the South Fork Crow River, North Fork Crow River and Sauk River Watershed Hydrological Simulation Program FORTRAN (HSPF) models and review of the Pine River Watershed HSPF model.
The purpose of this project is to reduce phosphorus loading to Crystal Lake transported primarily through County Ditch 56. Crystal Lake is listed on MPCA's 303d listing for phosphorus impairment. Increased phosphorus levels have caused toxic algal blooms, reducing its appeal to recreationalists and economic draw for the City of Lake Crystal. This project will directly address phosphorus sources from agricultural land.
This project will identify and compile existing nitrate data from groundwaters and surface waters in the Lower Mississippi Basin (LMB) generally and focus on the Root River Watershed. The purpose is to investigate the quantity and quality of existing nitrate data, and to organize it for use in comprehensive watershed strategy development (including assessment, TMDL computation and identification and study of nitrate sources and delivery mechanisms).