All Projects

1045 Results for
Recipient
Pioneer-Sarah Creek WMC
2018 Fiscal Year Funding Amount
$416,000
Fund Source
Hennepin
Recipient
Rice Creek WD
2019 Fiscal Year Funding Amount
$392,000
Fund Source

The Rice Creek Watershed District (RCWD) is proposing to improve the water quality of stormwater runoff to Bald Eagle Lake through installation of a new wet pond and iron-enhanced sand filter (IESF) on Ramsey County Ditch #11. In partnership with White Bear Township, this project will remove approximately 43 pounds of phosphorus from runoff annually and builds upon the extensive work undertaken by the RCWD to improve water quality in Bald Eagle Lake.

Ramsey
Recipient
Wenck Associates, Inc.
2012 Fiscal Year Funding Amount
$4,811
Fund Source

This project will support updates to the Draft Bald Eagle Lake TMDL. The updates will address comments received during the public comment period. The comments resulted in the development of individual Wasteload Allocations for stormwater sources in the Bald Eagle Lake watershed.

Anoka
Dakota
Hennepin
Ramsey
Washington
Recipient
Shingle Creek WMC
2018 Fiscal Year Funding Amount
$267,040
Fund Source
Hennepin
Recipient
Shingle Creek WMC
2021 Fiscal Year Funding Amount
$70,000
Fund Source
Hennepin
Recipient
Bassett Creek Watershed Management Organization
2010 Fiscal Year Funding Amount
$360,000
Fund Source

The Board of Water and Soil Resources is required to contract with the Conservation Corps of Minnesota and Iowa (formerly Minnesota Conservation Corps), or CCMI, for installation of conservation practices benefitting water quality for at least $500,000 in each year of the 2010-11 biennium.

Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$400,000
Fund Source

The Plymouth Creek Restoration Project will improve water quality in Plymouth Creek and Medicine Lake, the creek's primary receiving water. The project will reduce total phosphorus and suspended sediment in Plymouth Creek and Medicine Lake stemming from streambank erosion. Streambank erosion is a common source of pollution, particularly in developed landscapes where flows in streams are considered flashy and can easily scour unprotected and disturbed streambanks.

Hennepin
Recipient
Bassett Creek WMC
2017 Fiscal Year Funding Amount
$134,595
Fund Source

This project engages private property owners including non-profits, businesses, and institutions, in the Harrison Neighborhood of Near North Minneapolis to install storm water best management practices. The BMPs will reduce pollution in Bassett Creek including chlorides and bacteria, for which the creek is impaired. The primary focus is on Glenwood Avenue, a focal point in the community and a highly impervious area.

Hennepin
Recipient
Shingle Creek WMC
2016 Fiscal Year Funding Amount
$725,000
Fund Source

Installation of a 43,000 sf infiltration gallery in Becker Park in the City of Crystal to infiltrate 0.5 inches of runoff from a 147 acre currently untreated mixed use subwatershed with 51% impervious surface. The project will reduce total phosphorus to Impaired Water Upper Twin Lake by 118 pounds annually, and reduce street flooding on Bass Lake Road (Hennepin County Road 10).

Hennepin
Recipient
Vadnais Lake Area WMO
2018 Fiscal Year Funding Amount
$97,000
Fund Source
Ramsey
Recipient
Dakota County
2023 Fiscal Year Funding Amount
$25,000
Fund Source

Prevention of groundwater contamination from unused, unsealed wells is identified as a priority in the 2020-2030 Dakota County Groundwater Plan. Dakota County plans to prevent groundwater contamination, especially in drinking water supply management areas, by completing a well inventory in the Black Dog Watershed area to identify suspected abandoned wells, and provide 50% cost-share grants to seal approximately 13 unused, unsealed wells in the watershed.

Dakota
Recipient
Blue Earth County SWCD
2018 Fiscal Year Funding Amount
$29,929
Fund Source

The Blue Earth SWCD will be monitoring 7 stream sites located in the Le Sueur River Watershed.  The stream sites will be monitored at the road crossing locations via bridge, culvert or shore.  Onsite conditions will be recorded, water sample readings will be taken for Secchi tube, specific conductance, temperature, pH, DO, and photos taken.  

Blue Earth
Waseca
Recipient
Faribault County SWCD
2019 Fiscal Year Funding Amount
$267,400
Fund Source

The goal of this project is to facilitate strategic networking, relationships, and learning in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase knowledge of the Blue Earth River watershed’s water resources and increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed. Additional goals include providing information that is readily available to the general public for updates on Watershed Approach work in the Blue Earth River watershed.

Blue Earth
Faribault
Freeborn
Waseca
Recipient
Blue Earth County
2019 Fiscal Year Funding Amount
$20,000
Fund Source

The purpose of this project is to expand the County's long standing well sealing efforts by reducing the current inventory of identified well sealing projects.

Blue Earth
Recipient
Minnesota State University - Mankato
2021 Fiscal Year Funding Amount
$49,992
Fund Source

The goal of this project is to develop and write the Watershed Restoration and Protection Strategy (WRAPS) report for the Blue Earth River Watershed to provide restoration strategies to improve water quality for impaired waters and protection strategies to maintain the quality of water for water bodies meeting standards.

Blue Earth
Faribault
Freeborn
Jackson
Martin
Recipient
Blue Earth County
2013 Fiscal Year Funding Amount
$30,000
Fund Source

The goal of this project is to reduce the number of vulnerable unused wells located within sensitive areas and to prevent potential groundwater contamination. Most Minnesotans rely on groundwater as their primary source of drinking water. Unused and improperly sealed wells can serve as an open conduit to groundwater aquifers, allowing surface water runoff, contaminated water or improperly disposed waste to reach an uncontaminated aquifer. Properly sealing unused and improperly sealed wells is a preventive practice that protects groundwater aquifers from contamination.

Blue Earth
Recipient
Blue Earth County
2011 Fiscal Year Funding Amount
$136,842
Fund Source

Vegetated buffer and filter strips along waterways is a practice that addresses many surface water concerns. Establishing permanent vegetation along waterways is an implementation priority in the Blue Earth County Water Management Plan and required by local ordinance and Minnesota Rules. Minnesota Shoreland Rules, Chapter 6120 and the County Shoreland Ordinance contain standards for agricultural uses in shoreland. Agricultural uses are permitted in shoreland areas if steep slopes and shore and bluff impact zones are maintained in permanent vegetation.

Blue Earth
Recipient
Blue Earth County
2014 Fiscal Year Funding Amount
$69,000
Fund Source

With limited funds and limited staff time available for targeting critical service areas and implementing Best Management Practices (BMPs), Geographic Information System (GIS)-based tools that pinpoint locations where BMPs will have the highest effectiveness are increasingly important. The Blue Earth County/SWCD Watershed Implementation Targeting project will utilize LiDAR topographic data to determine areas of high importance for BMP implementation. The county is located in the Blue Earth, LeSueur, Watonwan and Middle Minnesota watersheds where there is a high density of impaired waters.

Blue Earth
Recipient
Blue Earth, City of
2010 Fiscal Year Funding Amount
$317,130
Fund Source

Construct wastewater treatment improvements to meet TMDL wasteload requirement

Faribault
Recipient
Blue Earth County
2015 Fiscal Year Funding Amount
$95,000
Fund Source

This project will conduct Inventory and Inspection of four drainage ditches in Blue Earth County: JD116, CD5, CD86 and CD56. The inventory of these drainage ditches is important in order to identify where erosion, sediment and/or nutrients contribute substantially to water quality degradation. The project will also prioritize sites for future side inlet control, buffer strip implementation, and/or storage and treatment implementation.

Blue Earth
Recipient
Blue Earth SWCD
2011 Fiscal Year Funding Amount
$57,895
Fund Source

Ravine, stream bank and bluff erosion contribute significant amounts of sediment to rivers and streams. The MPCA report, Identifying sediment sources in the Minnesota River Basin, found the Blue Earth and Le Sueur watersheds contribute as such as half of the sediment to the Minnesota River, even though they account for only one-fifth of its drainage area. These watersheds contain the majority of the bluffs in the basin as well as many large
ravines.

Blue Earth
Recipient
Minnehaha Creek Watershed District
2010 Fiscal Year Funding Amount
$224,224
Fund Source

In South Minneapolis, the water quality of Diamond Lake has suffered in recent decades. In fact, the Minnehaha Creek Watershed District's (MCWD) analysis of water testing results designated the water quality grade as F. This is largely a result of water that rolls off roofs, yards, and streets in the 690-acreDiamond Lake watershed and ends up in the lake - bringing pollutants, debris and dirt with it.

Hennepin
Recipient
Faribault County
2010 Fiscal Year Funding Amount
$250,000
Fund Source

This project will utilize a systematic approach to identify principal sources, or “hot-spots”, of sediment contributions and work with individual landowners, county drainage officials, and municipalities to coordinate and implement critical Best Management Practices (BMP’s), establish demonstration sites, and provide education and outreach efforts. This project will also establish baseline watershed data with the addition of site specific information, and determine high priority watersheds. Appropriate practices will be identified and mapped utilizing GPS and GIS equipment and software.

Faribault
Recipient
Faribault County SWCD
2017 Fiscal Year Funding Amount
$94,500
Fund Source

The goal is to facilitate strategic networking, learning, and implementation in targeted groups to assess, build, and leverage community capacity (i.e. community resources and values) to increase best management practice (BMP) adoption to restore and protect water quality in the Blue Earth River watershed

Blue Earth
Faribault
Freeborn
Jackson
Martin
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$34,339
Fund Source

This Total Maximum Daily Load (TMDL) project will develop a TMDL Report and Implementation Plan defining the sources contributing to the impairments and outlining the steps necessary to bring Bluff Creek back to meeting water quality standards.

Carver
Dakota
Hennepin
Le Sueur
McLeod
Nicollet
Ramsey
Renville
Rice
Scott
Sibley
Recipient
Barr Engineering Company
2011 Fiscal Year Funding Amount
$18,020
Fund Source

This project will develop a Final TMDL report and Implementation Plan for the Bluff Creek Watershed.  The main outcomes of this project are the development of a Final TMDL Report approved by MPCA and EPA and a Final Implementation Plan approved by MPCA. 

Carver
Dakota
Hennepin
Le Sueur
McLeod
Rice
Scott
Sibley
Recipient
Lower Minnesota River Watershed District
2013 Fiscal Year Funding Amount
$220,800
Fund Source

Seminary Fen, a 600-acre complex in Carver County, supports one of only 500 calcareous fens in the world and is one of the highest quality calcareous fens in southern Minnesota. The Fen feeds Assumption Creek; one of the metro area's last known trout streams that supports naturally reproducing native brook trout. Assumption Creek then discharges to the nearby Minnesota River. The Fen's unique hydrology, soils, plants, and habitats are highly sensitive to water quality and sedimentation stress.

Carver
Dakota
Hennepin
Scott
Recipient
Waseca County
2019 Fiscal Year Funding Amount
$57,000
Fund Source

The purpose of this project is to complete a feasibility study to determine the best sites for projects in the Boot Creek headwaters, in the Le Sueur River watershed, to reduce erosion and pollutant loading. The study will identify critical source areas and provide additional watershed information to assist in prioritizing locations to address local resource management and water quality goals.

Waseca
Recipient
Bassett Creek WMC
2020 Fiscal Year Funding Amount
$400,000
Fund Source
Hennepin
Recipient
Rice Soil and Water Conservation District
2010 Fiscal Year Funding Amount
$150,000
Fund Source

The Cannon River Watershed is a diverse watershed from the standpoint of topography, land use, and land cover, but a central issue of concern is increased sedimentation and turbidity within the river. One of the best ways to keep sediment from entering the Cannon River is to install vegetative buffers on the smaller tributaries in the upper reaches of the watershed. This project is important as it aims to help identify strategic locations where buffers are needed and to assist landowners to install buffers that will directly help reduce sedimentation within the watershed.

Goodhue
Rice
Steele
Waseca
Recipient
Multiple Local Government Units
2012 Fiscal Year Funding Amount
$1,500,000
Fund Source

Funds are to be used to protect, enhance and restore water quality in lakes, rivers and streams and to protect groundwater and drinking water. Activities include structural and vegetative practices to reduce runoff and retain water on the land, feedlot water quality projects, SSTS abatement grants for low income individuals, and stream bank, stream channel and shoreline protection projects. For the fiscal year 2012, BWSR awarded 13 local governments with funds to complete 143 projects. More information is available in the detail reports below.

Big Stone
Cass
Dodge
Douglas
Lincoln
Marshall
McLeod
Mille Lacs
Pennington
Pipestone
Rock
St. Louis
Stearns
Recipient
Cannon River Watershed Partnership
2019 Fiscal Year Funding Amount
$13,740
2021 Fiscal Year Funding Amount
$10,662
2022 Fiscal Year Funding Amount
$30,000
Fund Source

This project will assess the ability of using cover crops as a best management practice to reduce nitrate leaching loss from corn and soybean acres. This contract provides funding for the coordination, outreach and field work to support implementation of the Cannon River Watershed Restoration and Protection Strategy (WRAPS) nitrogen strategy (cover crop application) in Rice Creek. Funding for the actual best management practice (BMP)cost-sharing has been secured via other sources.

Rice
Recipient
LimnoTech
2020 Fiscal Year Funding Amount
$27,606
Fund Source

This project is to refresh the Cannon River Watershed Hydrologic Simulation Program FORTRAN (HSPF) model. The previous model was developed for the time period of 1995-2012. This phase will extend the model to include data through 2019. All time series data will be updated through 2019, land classification zones will be restructured, hydrology calibration will be updated as needed, and final reporting including technical memo and model package.

Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
Cannon River Watershed Joint Powers Board
2021 Fiscal Year Funding Amount
$1,028,658
Fund Source
Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
Cannon River Watershed Joint Powers Board
2022 Fiscal Year Funding Amount
$110,312
Fund Source

This project with the Cannon River Watershed Joint Powers Board will conduct lake and stream sampling for the watershed restoration and protection strategy (WRAPS) update in the Cannon River Watershed. This sampling will track changes from the 2011 results, along with fill in gaps, delist or keep an eye out for new impairments, and gather data for permitting. The sites of sampling were selected by the Minnesota Pollution Control Agency (MPCA) and will be looking at lake and stream chemistry and stream bacteria. 

Dakota
Goodhue
Le Sueur
Rice
Steele
Recipient
Cannon River Watershed Partnership
2013 Fiscal Year Funding Amount
$47,973
Fund Source

The goal of this project is to use a science-based and participatory approach to understanding and promoting conservation practices in the agricultural community.

Blue Earth
Dakota
Dodge
Freeborn
Goodhue
Le Sueur
Rice
Scott
Steele
Waseca
Recipient
LimnoTech
2014 Fiscal Year Funding Amount
$134,427
Fund Source
The goal of this project is to construct, calibrate, and validate an HSPF watershed model for the Cannon River Watershed.
Dakota
Goodhue
Le Sueur
Rice
Steele
Waseca
Recipient
Zumbro Watershed Partnership, Inc.
2015 Fiscal Year Funding Amount
$106,580
Fund Source

Complete section 3 of Watershed Restoration and Protection Strategy (WRAPS) document for the Cannon and Zumbro Watersheds and provide input to sections 1 and 2.

Dakota
Dodge
Goodhue
Le Sueur
Olmsted
Rice
Steele
Wabasha
Waseca
Recipient
LimnoTech
2015 Fiscal Year Funding Amount
$154,020
2016 Fiscal Year Funding Amount
$6,915
Fund Source

The goal of this project is to apply the Hydrological Simulation Program FORTRAN (HSPF) model to evaluate scenarios to support potential management actions and implementation in the watershed, construct Total Maximum Daily Load (TMDL) studies, and to develop a conceptual site model of the lakes for understanding phosphorus release.

Dakota
Goodhue
Le Sueur
Rice
Steele
Recipient
Staples Area Men's Chorus, Inc.
2024 Fiscal Year Funding Amount
$4,500

Community Arts Access Project

Todd