This project is the ecological restoration of 1,400 feet of Shingle Creek, an Impaired Water for low dissolved oxygen and impaired biota, in Brooklyn Center and Brooklyn Park. The Shingle Creek Impaired Biota and Dissolved Oxygen Total Maximum Daily Load requires sediment oxygen demand load reductions and establishes restoration design standards to enhance habitat that will be incorporated into this project.
Significant interest exists across Hennepin County for providing additional water and natural resources education, engagement, and technical assistance to residents that leads to implementation of conservation practices on more residential properties and across more communities. WMWA, Hennepin County, and 5 metro Watershed-Based Implementation Funding (WBIF) convening groups propose a pilot program funded in part by metro WBIF allocations.
The South St. Louis SWCD will collaborate with the City of Duluth to implement 13 stormwater BMPs in two high priority parks in the Miller Creek Watershed. The proposed BMP locations were prioritized by the city & SWCD based on the desire to coordinate with upcoming construction planned for Lincoln Park & on the sediment impacts resulting from worsening erosion problems in Piedmont Park.
Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal unused/abandoned wells up to a maximum of $1000 per well. The amount of funding requested is $31,000 which is estimated to allow for the sealing of 80-100 wells. From 2012 to 2015, Crow Wing County sealed 65 wells as part of an earlier MDH well sealing grant from the Clean Water Fund. Priority will be given to wells located in or near existing wellhead protection areas.
The Cottageville Park Water Quality Protection and Stream Restoration Project was developed to meet the goals of the Minnehaha Creek Watershed District and the City of Hopkins, including; water resource management, channel stabilization, stream enhancement, riparian corridor improvements, open space creation, park development, and revitalization. The project achieves these goals through implementation of the following:
Crow Wing County, in cooperation with the municipalities within the County, plans to continue its successful well sealing program that pays 50% of the cost to seal / abandon wells up to a maximum of $1000 per well. Priority will be given to wells located in or near existing wellhead protection areas.
The purpose of this project is reduce peak flows in the North Fork of the Crow River through culvert sizing. Culvert sizing will typically result in smaller culverts, which will provide short-term temporary storage within channels and on adjacent lands upstream from road crossings. In addition to reducing peak flow rates, flood damage and downstream erosion, increased sediment and nutrient removal through extended detention time is expected.
The Sauk River Watershed District (SRWD) is the drainage authority for Stearns and Pope Counties. The SRWD manages 12 public drainage systems totaling over 90 miles. The majority of the public systems provide drainage for agricultural land uses and were constructed in the early 1900s.
Fish Lake is 238 acres and does not meet state water quality standards due to excessive nutrients. Through the Total Maximum Daily Load study, a recommendation was made to treat the lake with alum to achieve the state's water quality standards. The goal of this project is to reduce the phosphorus load to Fish Lake by 310 pounds per year and meet the needed phosphorus reduction goal. The project will be completed as a partnership between the Elm Creek Water Management Commission, Three Rivers Park District, the City of Maple Grove, and The Fish Lake Area Resident's Association.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
Currently, there are approximately 5,050 feedlots with fewer than 300 animal units that need to come into compliance with State feedlot rules. Clean Water Feedlot Water Quality Management Grant funds are being used to provide financial assistance to landowners with feedlot operations less than 300 animal units in size and located in a riparian area or impaired watershed.
Clean water funds are being utilized to address eroding ravines and untreated runoff entering Lake Minnwaska. The ravines originate from a 24 culvert that runs under Highway 55. The worst of the erosion in this area has been in the last ten years and the ravines now measure up to 20' deep and 30' wide and have uprooted trees, rocks and other debris. Installation of riparian cover and check dams in the two ravines will decrease further erosion and reduce suspended sediment during high flow events entering Lake Minnewaska.
Green Streets for Blue Waters is a collaborative effort to install curb cut raingardens and other stormwater management practices within public right of way and on private lands. The project development was funded by the City of Bloomington and the Lower Minnesota River Watershed District, who worked with Metro Blooms to identify the project area and goals.
The law also included a direct appropriation of $500,000 in FY2010 to Hennepin County for riparian restoration and stream bank stabilization in the county's 10 primary stream systems. The money is funding projects to protect, enhance and help restore the water quality of five streams and downstream receiving waters. Bassett Creek Plymouth Creek Nine Mile Creek Riley Creek Elm Creek
Demand for Engineering services in Northeast Minnesota's nine-county Area III Technical Service Area is exceeding the capacity to deliver the needed services. There are increased requests from Soil and Water Conservation Districts for engineering needed to design and install Best Management Practices in part due to requests related to Clean Water Fund projects. These funds will be used to hire an engineer, which will increase engineering capacity and result in the completion of at least five additional projects per year.
The Knife River is a state protected water and a Designated Trout Stream. It is nationally known as a prime fresh-water steelhead fishery and is managed as a cold-water trout fishery for native species including brook trout. The Knife River is characterized by steep gradients, multiple water-falls and cascades, tea-colored water, and remnant old-growth forest cover types including white pine, Norway pine and white cedar.
The Knife River is a popular trout fishing river along the North Shore of Lake Superior. In 1998, it was listed as "impaired" by the MPCA for turbidity (being too muddy). In 2010, a Total Maximum Daily Load, or, water clean-up plan was approved. The major recommendations were to address peak flows (fast
The Riley-Purgatory-Bluff-Creek Watershed District and the City of Eden Prairie are working together to implement projects to remove Lake Riley and Rice Marsh Lake from the impaired waters list. One key emerging issue is to evaluate potential internal phosphorous loading within stormwater ponds in the lakes? subwatersheds. This project will also use updated pond data from the city?s intensive pond inspection program to identify other phosphorus reduction opportunities. The proposed assessment will quantify formerly undocumented P loading to Rice Marsh Lake and Lake Riley.
The North St. Louis Soil & Water Conservation District will work with lake and resort associations, chambers of commerce, and various community groups to identify 3-6 projects with maximum public benefit. Potential projects include community rain gardens, native vegetative buffers and shoreline restorations that improve water quality by reducing stormwater runoff, cleaning stormwater before it is released to the lakes and retaining water on the land longer.
When completed, this Lake County-wide culvert inventory project will have multiple direct benefits to water quality protection, natural resource planning, and municipal asset protection. This inventory will be used to provide local and state authorities accurate information on the condition of road crossings, better calibrate hydrological modeling tools crucial to the inter-agency Watershed Restoration and Protection Strategies (WRAPS) process, and assess how road crossings in Lake County are affecting the water and sediment transport capacity of our waterways.
As lake-focused development continues these high quality waters will see increasing amounts of land use change. The State Demographer projects that the targeted lake catchments will see population increases of 25-62% within 20 years. Isolating these contributing areas permits the Lake Protection Analysis project to perform multiple GIS analyses to accurately inform water quality discussions. The final framework will allow local water managers to prioritize across their water bodies, target activities to specific subsheds, and develop measurable goals.
This project will implement timber stand improvement activities on over 300 acres of private forest land within the Knife River and Skunk Creek watershed; both are not meeting state water quality standards for turbidity. These activities will culminate in planting diverse, large-statured native trees, resilient in the face of forest pests and diseases, climate change, and deer browse. Through this project, significant areas of the Knife River and Skunk Creek watersheds will have a patchwork of seed sources that will naturally expand the footprint of a healthier forest.
This project is a cooperative effort between Crow Wing and Itasca County to contract with RMB Laboratories to generate 65 lake assessment/trend analysis reports. The watershed protection model is an innovative and proactive approach to water resource management which is geared towards prioritizing areas of concern, targeting implementation strategies, and measuring their effectiveness. These assessments are also useful and understandable tools for lake associations and the public.
The goal of this project is to identify watershed and in-lake best management practices (BMPs) to improve water quality for impaired water bodies within the Upper Long Lake Creek subwatershed. The existing P8 watershed model and BATHTUB lake response models will be updated and refined to identify BMPs, develop project costs, and estimate nutrient load reductions. A feasibility report will be developed that outlines prioritized projects, estimated load reductions, and project costs to accelerate implementation.
Lake Sarah is a regionally significant lake and currently suffers from excess phosphprus levels. Loretto Creek, located partially within the Cities of Medina and Loretto, is Lake Sarah's east tributary carrying approximately 269 pounds of phosphorus to the lake each year. This is a joint project between the Cities of Loretto and Medina developed for the Loretto ballfields to address this problem.
St. Louis County's Comprehensive Water Management Plan Update 2010-2020 identifies providing financial assistance to qualifying homeowners to upgrade or replace failing septic systems as a Priority 2 action. Funds from the FY-16 Clean Water Fund Projects and Practices Grant will be used to provide funding to low-income homeowners to repair or replace SSTS identified as Imminent Threat to Public Health (ITPH) within the following watersheds: Lake Superior South, St.
The Master Water Stewards (MWS) program will install pollution prevention projects on both residential and commercial properties and educate citizens in their neighborhoods to reduce urban runoff and nutrient loads. Community leaders who have been identified, educated and certified as Stewards, will lead projects.
It is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications. The Metro Conservation District?s (MCD) Sub-Watershed Analysis (SWA) program provides these capacity-building services and unites efforts across 11 SWCDs. MCD proposes to analyze an additional 15 subwatersheds. The analyses will identify the location and estimated cost/benefit relationship for BMPs, evolve with new technology, and share discoveries metro-wide.
Through a long standing partnership, this project will continue to implement a process formalized with a 2010 Clean Water Fund Grant to conduct stormwater sub-watershed assessments. The goal of the sub-watershed assessments is to accelerate water quality improvements by focusing efforts in high priority areas. Specifically, subwatershed assessments are a tool used to identify the most effective urban stormwater conservation practice by location.
This project will create a culvert inventory database for county and township roads in the southwest portion of St. Louis County that contains the St. Louis River watershed. Data will be used by the County Public Works Department to identify and prioritize stream crossings in need of replacement or increasing upstream storm water retention to reduce the potential for culvert failure during large runoff events, factoring in stream health (fish habitat and passage, sediment transport and hydrologic connection) while protecting infrastructure.
This grant will fund the creation of a new Coordinator position with a primary focus on the Mille Lacs Lake subwatershed. Although not currently impaired, the Lake faces increasing development and land use pressure. Implementation of protection strategies is essential to the Lake's long-term health but current staffing does not allow sufficient time to be spent on project development and outreach to identify interested landowners.
The Miller Hill Mall, a regional shopping destination located in the City of Duluth, is the largest contiguous impervious site in the Miller Creek Watershed. The draft Total Maximum Daily Load Study identified heated stormwater runoff as a major contributor to the creek's excessive heat loading problem, which negatively impacts the creek's native brook trout population. The Mall, along with eight other entities in the watershed, was assigned a reduction goal as part of the effort to address the temperature problem in this creek.
This grant will restore a section of Miller Creek, an urban trout stream located in Duluth, that was straightened many years ago back to its natural channel. The original channel had a lot more sinuosity, or, curviness, than it does now and the straightened creek suffers from erosion and warm temperatures illsuited for trout.