Minnesota's Legacy

All Projects

Showing 1 - 40 of 56 | Export projects
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$300,000
Fund Source

This project targets retrofit stormwater Best Management Practices (BMPs) on public land to assist partnering Local Government Units (LGUs) achieve water quality goals identified in local stormwater plans. The Dakota County Soil and Water Conservation District (SWCD) provides technical assistance and distributes Clean Water Funding (CWF) to leverage local funding through its time-proven Stormwater Retrofit Partnership (Partnership) cost share program.

Dakota
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$100,000
Fund Source

This project is a continuation of the Dakota County Community Initiative, which has received Clean Water Funds in 2012 and 2013. It will provide cost share funding to organizations and associations who voluntarily construct medium sized water quality best management practices (BMPs) in Dakota County.

Dakota
Recipient
Pennington SWCD
2014 Fiscal Year Funding Amount
$91,300
Fund Source

The City of Thief River Falls drinking water is taken from a 135 acre reservoir that is supplied by the Thief River and Red Lake River. Sedimentation and erosion have significant impacts to the waters in Pennington County. The reservoir is filling with sediment faster than expected. Buffers and side water inlets will help reduce sediment and improve water quality for these types of erosion. Buffers would also reduce nutrients polluting the waters in Pennington County and have a beneficial impact to the dissolved oxygen impairment on both the Red Lake and Thief River.

Pennington
Recipient
Prior Lake-Spring Lake WD
2014 Fiscal Year Funding Amount
$131,200
Fund Source

Lower Prior Lake was the target of a 2011-2013 diagnostic and feasibility study that identified projects and ranked subwatershed by phosphorus loading to the lake. This project is in a high loading subwatershed and includes three elements designed to reduce phosphorus loading and control rates and volumes of stormwater runoff: 1) retrofitting an existing ditch section with in-line iron-sand filters; 2) expanding storage capacity and creating wetland upstream of the ditch; and 3) installing a new control structure in an existing berm.

Scott
Recipient
Dakota SWCD
2014 Fiscal Year Funding Amount
$150,000
Fund Source
Dakota
Recipient
Prior Lake-Spring Lake WD
2014 Fiscal Year Funding Amount
$58,000
Fund Source

Arctic Lake, while not listed as an impaired water on the statewide 303(d) list, both regularly exceeds the statewide phosphorus standard for shallow lakes and drains directly to Upper Prior Lake, which is impaired for nutrients Reducing Phosphorus to Arctic Lake will help reverse the current declining water quality while also reducing the loading entering Upper Prior Lake.

Scott
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$21,860
Fund Source

The purpose of this Phase II Project is to advance the inventory process of the 103E drainage ditches where erosion, sediment, and/or nutrients are contributing substantially to water quality degradation, and prioritize sites for side water inlet control and/or buffer strip implementation.Through this project, Red Lake Watershed District, Red Lake County Ditch Authority, along with the Red Lake County SWCD, will be working together prioritizing county ditch systems (based upon water quality degradation and the amount of sediment loading that is occurring in the ditch systems), targeting whe

Red Lake
Recipient
Red Lake SWCD
2015 Fiscal Year Funding Amount
$277,500
Fund Source

Red Lake County Soil and Water Conservation District (SWCD) has targeted water quality improvement projects to twelve sites in the Black River, Cyr Creek, and Red Lake River Sub-Watersheds of the Red Lake River Watershed. Data analysis obtained from a variety of models identified which sub-watersheds were contributing to impairments, highlighted which fields in those sub-watersheds were contributing the most sediment, and even showed specific locations in the field which were most vulnerable to erosion.

Red Lake
Recipient
Dakota SWCD
2015 Fiscal Year Funding Amount
$150,000
Fund Source

This project will use the Dakota County Soil and Water Conservation District's existing Conservation Initiative Funding program to provide technical assistance and monetary incentives for targeted, medium-sized projects such as raingardens, bioinfiltration, biofiltration, bioswales, shoreline stabilizations, and other best management practices (BMPs). Project proposals will be solicited from faith based organizations, homeowner associations, school organizations, lake associations, and others that own or manage large areas of land.

Dakota
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$102,020
Fund Source

Red Lake County SWCD will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners involved to reduce erosion and sedimentation, reduce peak flows and flooding, improve water quality, and protect drainage system efficiency for priority Chapter 103E drainage systems by installing thirty-seven multipurpose drainage management practices. The priority Chapter 103E drainage system is Judicial County Ditch 60.

Red Lake
Recipient
Red Lake SWCD
2016 Fiscal Year Funding Amount
$194,000
Fund Source

The Red Lake River from County Ditch 96 (Pennington County) to where the Clearwater River enters the Red Lake River (Red Lake Falls) is on the TMDL Impaired Waters List for Turbidity. This reach is a high priority because of the high importance of the Red Lake River, which provides a domestic supply use of the water source and provides abundant recreational uses.

Red Lake
Recipient
Bloomington, City of
2016 Fiscal Year Funding Amount
$50,000
Fund Source

This project proposes significant improvements to the City of Bloomington's Anti-Icing/Brine making capabilities. The use of anti-icing technology reduces the amount of salt needed to clear snow and ice from city street. The improvements work to address the chloride impairment in Nine Mile Creek and the metro area by reducing the amount of salt applied to the streets and thereby reducing the amount of chlorides entering our surface water systems.

Hennepin
Recipient
Scott SWCD
2017 Fiscal Year Funding Amount
$201,000
Fund Source

This project builds on the momentum and success of previous Clean Water Fund grants in making significant non-point source pollution reductions that address state-identified turbidity, excess nutrient and dissolved oxygen impairments of the Lower Minnesota River and points downstream. These water quality improvements will be achieved by constructing high-value, cost-effective conservation best management practices in Scott County directly tributary to the Minnesota River.

Scott
Recipient
Red Lake SWCD
2017 Fiscal Year Funding Amount
$42,600
Fund Source

Red Lake River currently does not meet state water quality standards due to high amounts of sediment. For this project, the Red Lake County Soil and Water Conservation District will continue to work cooperatively with the Red Lake County Ditch Authority, and the landowners to reduce erosion and sedimentation into Judicial County Ditch 66. Judicial County Ditch 66 outlets into Cyr Creek which outlets directly into the Red Lake River.

Red Lake
Recipient
Roseau River WD
2016 Fiscal Year Funding Amount
$147,700
Fund Source

A collaboration between the Roseau County SWCD and the Roseau River Watershed District (RRWD), the CD 8 Subwatershed Sediment Reduction Project will reduce sediment delivery to the Roseau River by implementing Best Management Practices on sites that have been identified as the greatest contributors of sediment. Sites were prioritized based on modeled data from the Watershed District's Site Prioritization Grant, and the International Watershed Institutes's Water Quality Decision Support Application (WQDSA) and local knowledge of the subwatershed.

Roseau
Recipient
Carver County
2014 Fiscal Year Funding Amount
$40,000
Fund Source

Recent efforts by Carver County Water Management Organization Staff have centered on removing point sources of bacteria in both Bevens and Carver Creeks. These efforts have shown improvement in water quality; however the creeks are still above the state standard for E. coli. Early results from field surveys have pinpointed areas where livestock have uncontrolled access to streams. Five sites over a twenty mile stretch of Bevens Creek have shown evidence of livestock access to streams and associated damage to streambanks.

Carver
Recipient
Sibley County
2010 Fiscal Year Funding Amount
$9,770
Fund Source

This project will provide administrative support to the Clean Water Partnership (CWP) loan program. By initiating the CWP loan program in Sibley County it will provide low interest loans to bring 21 non-complaint or failing existing systems into compliance by replacing them with new single sewage treatment systems.

Sibley
Recipient
Riley-Purgatory-Bluff Creek WD
2014 Fiscal Year Funding Amount
$150,000
Fund Source

In 2002 and 2004, the Minnesota Pollution Control Agency listed Bluff Creek for turbidity and biological integrity. A Total Maximum Daily Load report and implementation plan were finalized and approved in 2013. This project was identified as a high priority site for culvert restoration and bank repairs.

Carver
Recipient
Carver County
2014 Fiscal Year Funding Amount
$200,000
Fund Source

The Burandt Lake Stormwater Reuse System (BLSRS) project will install a water reuse system to capture untreated storm water and reduce pollutants entering Burandt Lake. This collaborative project with Carver County, Carver County Soil and Water Conservation District (SWCD), City of Waconia and Independent School District 110 will retain and reuse an estimated 48% of the annual storm water runoff (1.25 million gallons) currently generated from eight acres of adjacent residential neighborhoods.

Carver
Recipient
Polk, West SWCD
2015 Fiscal Year Funding Amount
$45,000
Fund Source

Phase II of the Burnham Creek Watershed Restoration Project will conduct inventory on 2,050 acres, 85.4 miles of ditch channel within the Burnham Creek Watershed of West Polk County. This inventory includes surveying, assembling all available GIS data, ArcMap, LiDAR, review aerial photography, location of tile intakes, determine size of the erosion sites, and prioritization of severity. The district will partner with the Area DNR Hydrologist and the Polk County Highway Department-Drainage & Ag Inspector to verify data and identify any additional ditch segments.

Polk
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2016 Fiscal Year Funding Amount
$200,000
Fund Source

Once thought to have an essentially inexhaustible groundwater supply, Minnesotans are now realizing our rates of use are regionally unsustainable. Recent advanced modeling by the MN DNR and Metropolitan Council of aquifer supplies, in conjunction with predicted demand, indicate the major metropolitan area aquifers are currently subject to extraction rates that exceed recharge. Simply stated, we are mining our groundwater.

Scott
Recipient
Carver County
2014 Fiscal Year Funding Amount
$150,000
Fund Source

This project will increase the ability of the Carver County Water Management Organization (CCWMO) to approach local community partners and fund projects that treat stormwater runoff at the source instead of treating stormwater downstream at a regional pond or through other large scale best management practices (BMPs).

Carver
Recipient
Carver County
2017 Fiscal Year Funding Amount
$10,000
Fund Source

The Carver County Planning and Water Management Department (PWM) has an active well sealing cost share program. Following the adoption of the updated County Groundwater Plan in February of 2016, the Carver County Board of Commissioners moved to accelerate the program to encourage landowners to seal abandoned wells. Carver County is looking to supplement existing funds, as demand is expected to increase. With this additional funding, it is the goal of Carver County PWM to seal an additional 15 wells county wide.

Carver
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$196,500
Fund Source

The Pennington SWCD has collaborated with Pennington County for several years to identify priority County Ditch reaches that are in need of buffers and grade stabilization structures. This cooperative effort has resulted in the reduction of nutrient and sediment delivery to the Red Lake River Watershed. Pennington SWCD has recently inventoried buffer and grade stabilization needs on three different County Ditch systems: 96, 21 and 16. A total of 23 miles of ditch has been inventoried, 15 miles of buffer are needed along with 81 grade stabilization structures.

Pennington
Recipient
Minnetonka, City of
2014 Fiscal Year Funding Amount
$129,200
Fund Source

The City of Minnetonka and its residents highly value the water resources within the community, which include approximately ten lakes, four streams, and hundreds of wetlands. The City has been progressive in protecting these resources through policies and management strategies, and now wants to increase their on-the-ground efforts in protecting and improving water quality. The City hopes to conduct targeted watershed assessments for fourteen selected priority water bodies to identify and optimize the type and locations of Best Management Practices (BMPs) to be installed.

Hennepin
Recipient
Pennington SWCD
2016 Fiscal Year Funding Amount
$90,728
Fund Source

Sediment and water quality issues are local priorities within the Thief River and Red Lake River watersheds, which have their confluence in the city of Thief River Falls. The 1W1P effort underway in the Red Lake River Watershed will identify opportunities for projects and practices that are targeted and result in measurable water quality benefits throughout the watershed using PTMApp.

Pennington
Recipient
Carver SWCD
2017 Fiscal Year Funding Amount
$120,935
Fund Source

The purpose of this project is to install prioritized and targeted best management practices on the Carver County Ditch #6 drainage system that drains directly into Bevens Creek. Bevens Creek does not meet state water quality standards for sediment. The goal of the project is to install 6 grade stabilization structures, 5 grassed waterways, and 2 water and sediment control basins that have been identified through GIS LIDAR applications and field verified along with landowner support.

Carver
Recipient
Carver County WMO
2016 Fiscal Year Funding Amount
$31,000
Fund Source

Carver County has identified water quality improvement of Carver, Bevens and Silver Creek as a water management priority. This project will identify storage or wetland restoration sites that are highly effective at reducing pollutant loading to downstream impaired waters using high-resolution Light Detection and Ranging (LiDAR) data and Geographic Information System (GIS) processes. The watershed landscape has been highly modified for agricultural production land development; less than 50 percent of pre-settlement wetland acres remain in Carver County.

Carver
Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$48,000
Fund Source

The downtown Chanhassen stormwater best management practice (BMP) retrofit assessment project will reduce watershed phosphorus loads to Rice Marsh Lake and improve the water quality in downstream Lake Riley, impaired for excess nutrients. This project will identify innovative BMP retrofit opportunities that target soluble phosphorus and promote infiltration and groundwater recharge within this highly-developed area. The downtown Chanhassen BMP retrofit assessment project will be performed in partnership with the City of Chanhassen.

Carver
Recipient
Pennington SWCD
2017 Fiscal Year Funding Amount
$332,749
Fund Source

Numerous County ditch systems in Pennington County end at a natural drainage prior to outleting into a river or other watercourse and these outlets can be in a very erosive state. The goal of this project is to inventory these systems to determine needs and prioritize projects for implementation.

Pennington
Recipient
Minnesota Department of Health
2019 Fiscal Year Funding Amount
$1,100,000
2018 Fiscal Year Funding Amount
$1,100,000
2017 Fiscal Year Funding Amount
$1,100,000
2016 Fiscal Year Funding Amount
$1,100,000
2015 Fiscal Year Funding Amount
$1,150,000
2014 Fiscal Year Funding Amount
$1,150,000
2013 Fiscal Year Funding Amount
$1,020,000
2012 Fiscal Year Funding Amount
$1,020,000
2011 Fiscal Year Funding Amount
$744,717
2010 Fiscal Year Funding Amount
$250,291
Fund Source

The Drinking Water Contaminants of Emerging Concern (CEC) program identifies environmental contaminants for which current health-based standards currently do not exist or need to be updated, investigate the potential for human exposure to these chemicals, and develop guidance values for drinking water. Contaminants evaluated by CEC staff include contaminants that have been released or detected in Minnesota waters (surface water and groundwater) or that have the potential to migrate to or be detected in Minnesota waters.

Statewide
Recipient
Burnsville, City of
2016 Fiscal Year Funding Amount
$398,000
Fund Source

The Keller Lake Water Quality Improvement Project achieves the goals of the City of Burnsville, Black Dog Watershed Management Organization, and the Keller Lake TMDL by:-Achieving the City of Burnsville phosphorus removal requirement outlined in the Keller Lake TMDL by removing 78 lbs/yr-Utilizing remaining available land to construct a high performance, regional stormwater BMP-Providing a high profile water resource/stormwater educational opportunity in the frequently visited Crystal Beach Park-Retaining valuable open space in popular Crystal Beach Park by constructing the BMP undergroundK

Dakota
Recipient
Apple Valley, City of
2017 Fiscal Year Funding Amount
$30,000
Fund Source

The City of Apple Valley will conduct a subwatershed assessment on the sections of Apple Valley draining to Keller Lake to target potential projects. The goal is to identify potential cost effective retrofit projects and operations improvements capable of fulfilling needed phosphorus reductions ahead of a number of planned infrastructure projects tentatively scheduled for 2018-2022.

Dakota
Recipient
Riley-Purgatory-Bluff Creek WD
2015 Fiscal Year Funding Amount
$233,400
Fund Source

This is a joint grant application from the Riley-Purgatory-Bluff Creek Watershed District (RPBCWD) and the City of Chanhassen. In 2010, the Minnesota Pollution Control Agency listed Lake Susan as a shallow lake impaired for excess nutrients. A 2013 report recommended a project located at the park pond immediately northwest of Lake Susan as the most cost-effective watershed implementation project. The project calls for an outlet control structure at a higher elevation that will provide increased dead pool storage and the installation of a Minnesota Filter to treat dissolved phosphorus.

Carver
Recipient
Lower Mississippi River WMO
2016 Fiscal Year Funding Amount
$196,000
Fund Source

Lake Augusta and Sunfish Lake are deep lakes located in the Lower Mississippi River Watershed Management Organization. Both lakes are approximately 40 acres in size and surrounded by watersheds with moderate to low imperviousness. Both lakes are included on the MPCA's 303(d) list as impaired for aquatic recreation due to excessive nutrients. Lake Augusta and Sunfish Lake were included in a watershed restoration and protection strategies (WRAPS) study and total maximum daily load (TMDL) performed from 2012 to 2014.

Dakota
Recipient
Scott SWCD
2014 Fiscal Year Funding Amount
$126,400
Fund Source

This project will reduce sediment and nutrient loading to the main stem and local tributaries of the Lower Minnesota River (LMR) by providing cost share for practices that treat ravine headcut and channel erosion, streambank/shoreline erosion, ephemeral gully erosion, and direct-discharging open inlet drainage systems. Targeted Best Management Practices (BMPs) will include but not be limited to grade control structures, grassed/lined waterways, water & sediment control basins, shoreline/streambank stabilization and alternative tile inlets.

Scott
Recipient
Scott SWCD
2015 Fiscal Year Funding Amount
$125,000
Fund Source

This project builds on the momentum of previous Clean Water Fund grants in making significant and quantifiable sediment, nutrient and runoff volume reductions to address the turbidity, dissolved oxygen and other impairments of the Lower Minnesota River (LMR). These water quality improvements will be achieved by constructing on-the-ground conservation best management practices (BMPs) in the targeted watersheds -including specifically Sand and Roberts Creek - and near channel sources.

Scott
Recipient
McLeod County
2015 Fiscal Year Funding Amount
$34,200
Fund Source

McLeod County will create an inspection database for 103E ditches under their drainage authority. The County will acquire a database software solution to conduct field inspections and to track ditch maintenance projects. This software will be used to facilitate statutory compliance including developing a process for completing the annual inspection and reporting requirements. The project will lead to improving the County's data management capabilities and better identification of drainage system needs that could lead to helping improve water courses that are impaired for turbidity.

McLeod
Recipient
Area 4 - Metropolitan SWCDs Technical Service Area
2014 Fiscal Year Funding Amount
$250,000
Fund Source

Ensuring natural resource practitioners are applying state-of-the-art approaches is the best way to achieve optimum Best Management Practice (BMP) selection, design, and placement in the landscape, thereby maximizing Clean Water Fund (CWF) benefits. To that end, it is critical to train new staff, create modeling protocols for new BMPs, refine and calibrate models, and test ever-advancing modeling applications.

Scott
Recipient
Greater Blue Earth River Basin Alliance
2017 Fiscal Year Funding Amount
$301,200
Fund Source

The Greater Blue Earth River Basin Alliance (GBERBA) along with Soil and Water Conservation Districts, Counties, landowners, and drainage authorities in the ten member counties will install conservation drainage practices to improve water quality. 103E drainage systems with documented sediment or water quality issues are the focus with the goal of installing 52 practices such as improved side inlets (grade stabilization structures), alternative tile inlets, denitrifying bioreactors, saturated buffers, storage wetlands and others.

Blue Earth
Brown
Cottonwood
Faribault
Freeborn
Jackson
Le Sueur
Martin
Waseca
Watonwan